Monitoring Report of the LARAP Package No. 10
14. Monitoring Report of the LARAP Package No. 14
: Painan - Kambang Province : Sumatera Barat A. Previous Status : • World Bank issued on December 19, 2014 the No Objection Letter to the LARAP documents. • LARAP s signed action plan was given No Objection Letter NOL by World Bank. B. Pending Issues, Concern and Actions a Process of compensation payment for the remaining of PAPs is on-going. C. Update during this reporting month of October 2016 a Monitoring Report No.1 for compensation payments of 126 PAPs submitted to WB which was submitted on July 20, 2016. b Monitoring Report of the payments progress for 62 PAPs is under submission to WB c Total PAP = 1,087; Compensated = 245; Percent complete = 22.5.15. Monitoring Report of the LARAP Package No. 15
: Sibolga Bts. Tapsel Province : Sumatera Utara A. Previous Status : • World Bank approved the LARAP documents on February 6, 2014 for implementation in acquiring Road Right of Ways and removal of obstruction. • Monitoring report No.1 for 40 of the remaining 1.554 PAPs was given No Objection Letter NOL on November 16, 2015. • Monitoring Report No.2 for payment of remaining 72 PAPs already submitted to World Bank. • Monitoring Report-3 for the compensation payment for 237 from the remaining 1.439 PAPs already be submitted to WB on February 19, 2016 and Bank issued no objection letter NOL on March 16, 2016. • Monitoring Report No.4 for compensation payment of 55 PAPs submitted to WB on April 13, 2016 and Bank issued no objection letter NOL on May 19, 2016. • Monitoring Report No.5 for compensation payment of 34 PAPs submitted to WB on August 8, 2016 and Bank issued no objection letter NOL on August 18, 2016. B. Pending Issues, Concern and Actions a Due limited to limited supply of map fields as one of the documents needed for find disbursement by Treasury Office affect the progress of payments release. C. Update during this reporting month of October 2016 a Compensation payment for the remaining PAPs is under process. b Total PAP = 1,554; Compensated = 580; Percent complete = 37.32.16. Monitoring Report of the LARAP Package No.16
: Seblat - Ipuh Province : Bengkulu A. Previous Status : • World Bank issued on May 30, 2014 a No Objection Letter NOL on the revised LARAP documents for implementation. • World Bank issued No Objection Letter NOL on Monitoring Report No.1 and 2 for LARAPParts
» WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» World Bank Implementation Review Mission and Site Visit
» Package No.10 Sp. Empat Sp. Air Balam AWP-2
» Background WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Project Development WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Project Objective WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» CTC Consultants WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 73.84 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» DSC Consultants WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Technical Assistance for Development of Slope Stabilization, Design and
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Procurements WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Civil Works Progress WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 35.23 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 74.87 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 23.49 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 18.79 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 34.26 74.78 1.97 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 19.25 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 17.28 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 12.04 33.32 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 1.94 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Quality Assurance WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Environmental Quarterly Report Environmental and Social Considerations
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4 Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Road Safety Audit WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» Implementation Support Components WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Road Safety Audit Management Information System
» Project Risks and Mitigation Measures
» Krui-Biha 08-Jan-14 Actions Required
» Pd. Sawah-Sp. Empat 06-Jan-14
» Manggopoh-Pd. Sawah 06-Jan-14 Actions Required
» Ipuh-Bantal 10-Jan-14 Actions Required
» Sp. Rampa - Poriaha 18-Jun-15
» Ps Pedati - Kerkap 11-Mar-15
» Bts. Kt Pariaman - Manggopoh 23-Mar-16
» R. Tijang - Kt. Agung Cancelled
» Sp Empat - Sp Air Balam Propose to be Cancelled
» Kambang - Indrapura 23-Mei-16
» Sp. Rukis - Tj. Kemuning 22-Jul-15
» Painan -Kambang 03-Agust-16 Actions Required
» Sibolga - Bts Tap Sel 20-Nop-15
» Sp. Gunung Kemala - Pg. Tampak
» Mukomuko - Bts. Sumbar Cancelled
» Lais- Bintunan 11-Mar-15 Actions Required
» Lubuk Alung - Sicincin PT. Nindya Karya
Show more