PEKERJAAN SANITASI Daftar Harga Satuan Dasar

commit to user 323 Tugas Akhir Perencanaan Struktur Gedung Sekolah 2 Lantai RAB BAB 9 RENCANA ANGGARAN BIAYA NO MACAM PEKERJAAN MACAM BAHAN SATUAN KOEFISIEN HARGA SATUAN Rp JUMLAH HARGA BAHAN Rp JUMLAH HARGA UPAH Rp TOTAL Rp Total 171,695.70 8.B 1 M2 LANTAI KERAMIK UKURAN 20 × 20 cm Pekerja oh 0.700 28,000.00 19,600.00 Tukang batu oh 0.350 39,600.00 13,860.00 Kepala tukang oh 0.035 48,400.00 1,694.00 Mandor oh 0.035 49,500.00 1,732.50 Ubin keramik bh 26.500 3,680.00 97,520.00 Portland Cement PC kg 10.400 1,178.75 12,259.00 Pasir pasang m³ 0.045 129,375.00 5,821.88 Semen warna kg 1.620 1,750.00 2,835.00 Jumlah 118,435.88 36,886.50 155,322.38 Jasa konstruksi 10 15,532.24 Total 170,854.61 8.C 1 M2 DINDING KERAMIK UKURAN 20 × 20 cm Pekerja oh 0.900 28,000.00 25,200.00 Tukang batu oh 0.450 39,600.00 17,820.00 Kepala tukang oh 0.045 48,400.00 2,178.00 Mandor oh 0.045 49,500.00 2,227.50 Ubin keramik bh 26.500 3,680.00 97,520.00 Portland Cement PC kg 9.300 1,178.75 10,962.38 Pasir pasang m³ 0.018 129,375.00 2,328.75 Semen warna kg 1.940 1,750.00 3,395.00 Jumlah 114,206.13 47,425.50 161,631.63 Jasa konstruksi 10 16,163.16 Total 177,794.79

9. PEKERJAAN SANITASI

9.A 1 BUAH PASANG KLOSET JONGKOK PORSELIN Pekerja oh 1.000 28,000.00 28,000.00 Tukang batu oh 1.500 39,600.00 59,400.00 Kepala tukang oh 1.500 48,400.00 72,600.00 Mandor oh 0.160 49,500.00 7,920.00 Kloset jongkok bh 1.000 178,250.00 178,250.00 Portland Cement PC kg 6.000 1,178.75 7,072.50 commit to user 324 Tugas Akhir Perencanaan Struktur Gedung Sekolah 2 Lantai RAB BAB 9 RENCANA ANGGARAN BIAYA NO MACAM PEKERJAAN MACAM BAHAN SATUAN KOEFISIEN HARGA SATUAN Rp JUMLAH HARGA BAHAN Rp JUMLAH HARGA UPAH Rp TOTAL Rp Pasir pasang m³ 0.010 129,375.00 1,293.75 Jumlah 186,616.25 167,920.00 354,536.25 Jasa konstruksi 10 35,453.63 Total 389,989.88 9.B 1 BUAH PASANG BAK MANDI FIBER GLASS Pekerja oh 1.800 28,000.00 50,400.00 Tukang batu oh 2.700 39,600.00 106,920.00 Kepala tukang oh 0.540 48,400.00 26,136.00 Mandor oh 0.110 49,500.00 5,445.00 Bak fiberglass bh 1.000 207,000.00 207,000.00 Perlengkapan 0.180 207,000.00 37,260.00 Jumlah 244,260.00 188,901.00 433,161.00 Jasa konstruksi 10 43,316.10 Total 476,477.10 9.C 1 BUAH PASANG WESTAFEL Pekerja oh 1.200 28,000.00 33,600.00 Tukang batu oh 1.450 39,600.00 57,420.00 Kepala tukang oh 0.150 48,400.00 7,260.00 Mandor oh 0.100 49,500.00 4,950.00 Westafel bh 1.000 316,250.00 316,250.00 Perlengkapan 0.120 316,250.00 37,950.00 Portland Cement PC kg 6.000 1,178.75 7,072.50 Pasir pasang m³ 0.010 129,375.00 1,293.75 Jumlah 362,566.25 103,230.00 465,796.25 Jasa konstruksi 10 46,579.63 Total 512,375.88 9.D 1 BUAH PASANG FLOORDRAIN Pekerja oh 0.010 28,000.00 280.00 Tukang batu oh 0.100 39,600.00 3,960.00 Kepala tukang oh 0.010 48,400.00 484.00 Mandor oh 0.005 49,500.00 247.50 Floordrain bh 1.000 34,500.00 34,500.00 Jumlah 34,500.00 4,971.50 39,471.50 Jasa konstruksi 10 3,947.15 commit to user 325 Tugas Akhir Perencanaan Struktur Gedung Sekolah 2 Lantai RAB BAB 9 RENCANA ANGGARAN BIAYA NO MACAM PEKERJAAN MACAM BAHAN SATUAN KOEFISIEN HARGA SATUAN Rp JUMLAH HARGA BAHAN Rp JUMLAH HARGA UPAH Rp TOTAL Rp Total 43,418.65 9.E 1 BUAH PASANG KRAN DIAMETER 34 ATAU 12 Pekerja oh 0.010 28,000.00 280.00 Tukang batu oh 0.100 39,600.00 3,960.00 Kepala tukang oh 0.010 48,400.00 484.00 Mandor oh 0.005 49,500.00 247.50 Floordrain bh 1.000 34,500.00 34,500.00 Seal tape bh 0.025 1,725.00 43.13 Jumlah 34,543.13 4,971.50 39,514.63 Jasa konstruksi 10 3,951.46 Total 43,466.09

10. PEKERJAAN INSTALASI AIR