PEKERJAAN PASANGAN DAN PLESTERAN PEKERJAAN KUSEN, PINTU DAN JENDELA

commit to user 314 Tugas Akhir Perencanaan Struktur Gedung Sekolah 2 Lantai RAB BAB 9 RENCANA ANGGARAN BIAYA NO MACAM PEKERJAAN MACAM BAHAN SATUAN KOEFISIEN HARGA SATUAN Rp JUMLAH HARGA BAHAN Rp JUMLAH HARGA UPAH Rp TOTAL Rp Kawat beton kg 2.250 11,500.00 25,875.00 Portland Cement PC kg 336.000 1,178.75 396,060.00 Pasir beton m³ 0.540 172,500.00 93,150.00 Kerikil m³ 0.810 201,250.00 163,012.50 Balok kayu meranti m³ 0.120 4,140,000.00 496,800.00 Plywood 9 mm lbr 2.800 126,500.00 354,200.00 Bambu ori btg 32.000 7,475.00 239,200.00 Jumlah 3,490,537.50 280,878.50 3,771,416.00 Jasa konstruksi 10 377,141.60 Total 4,148,557.60 2.L 1 M3 TANGGA BETON BERTULANG 150 KG BESI + BEKISTING Pekerja oh 5.600 28,000.00 156,800.00 Tukang batu oh 0.350 39,600.00 13,860.00 Tukang kayu oh 2.300 40,700.00 93,610.00 Tukang besi oh 1.400 40,700.00 56,980.00 Kepala tukang oh 0.405 48,400.00 19,602.00 Mandor oh 0.202 49,500.00 9,999.00 Kayu sengon m³ 0.250 2,127,500.00 531,875.00 Paku 5 cm - 12 cm kg 3.000 18,975.00 56,925.00 Minyak bekisting ltr 1.200 9,200.00 11,040.00 Besi beton polosulir kg 157.500 9,200.00 1,449,000.00 Kawat beton kg 3.000 11,500.00 34,500.00 Portland Cement PC kg 336.000 1,178.75 396,060.00 Pasir beton m³ 0.520 172,500.00 89,700.00 Kerikil m³ 0.780 201,250.00 156,975.00 Balok kayu meranti m³ 0.120 4,140,000.00 496,800.00 Plywood 9 mm lbr 2.500 126,500.00 316,250.00 Bambu ori btg 14.000 7,475.00 104,650.00 Jumlah 3,643,775.00 350,851.00 3,994,626.00 Jasa konstruksi 10 399,462.60 Total 4,394,088.60

3. PEKERJAAN PASANGAN DAN PLESTERAN

3.A 1 M2 DINDING BATA MERAH TEBAL 12 BATA, 1 : 5 Pekerja oh 0.300 28,000.00 8,400.00 commit to user 315 Tugas Akhir Perencanaan Struktur Gedung Sekolah 2 Lantai RAB BAB 9 RENCANA ANGGARAN BIAYA NO MACAM PEKERJAAN MACAM BAHAN SATUAN KOEFISIEN HARGA SATUAN Rp JUMLAH HARGA BAHAN Rp JUMLAH HARGA UPAH Rp TOTAL Rp Tukang batu oh 0.100 39,600.00 3,960.00 Kepala tukang oh 0.010 48,400.00 484.00 Mandor oh 0.015 49,500.00 742.50 Bata merah bh 70.000 390.00 27,300.00 Portland Cement PC kg 9.680 1,178.75 11,410.30 Pasir pasang m³ 0.045 129,375.00 5,821.88 Jumlah 44,532.18 13,586.50 58,118.68 Jasa konstruksi 10 5,811.87 Total 63,930.54 3.B 1 M2 PLESTERAN 1 : 5, TEBAL 15 MM Pekerja oh 0.300 28,000.00 8,400.00 Tukang batu oh 0.150 39,600.00 5,940.00 Kepala tukang oh 0.015 48,400.00 726.00 Mandor oh 0.015 49,500.00 742.50 Portland Cement PC kg 5.184 1,178.75 6,110.64 Pasir pasang m³ 0.026 129,375.00 3,363.75 Jumlah 9,474.39 15,808.50 25,282.89 Jasa konstruksi 10 2,528.29 Total 27,811.18 3.C 1 M2 ACIAN Pekerja oh 0.200 28,000.00 5,600.00 Tukang batu oh 0.100 39,600.00 3,960.00 Kepala tukang oh 0.010 48,400.00 484.00 Mandor oh 0.010 49,500.00 495.00 Portland Cement PC kg 3.250 1,178.75 3,830.94 Jumlah 3,830.94 10,539.00 14,369.94 Jasa konstruksi 10 1,436.99 Total 15,806.93 3.D 1 M SPONING Pekerja oh 0.200 28,000.00 5,600.00 Tukang batu oh 0.100 39,600.00 3,960.00 Kepala tukang oh 0.010 48,400.00 484.00 Mandor oh 0.004 49,500.00 198.00 Portland Cement PC kg 0.500 1,178.75 589.38 commit to user 316 Tugas Akhir Perencanaan Struktur Gedung Sekolah 2 Lantai RAB BAB 9 RENCANA ANGGARAN BIAYA NO MACAM PEKERJAAN MACAM BAHAN SATUAN KOEFISIEN HARGA SATUAN Rp JUMLAH HARGA BAHAN Rp JUMLAH HARGA UPAH Rp TOTAL Rp Jumlah 589.38 10,242.00 10,831.38 Jasa konstruksi 10 1,083.14 Total 11,914.51

4. PEKERJAAN KUSEN, PINTU DAN JENDELA

4.A 1 M3 KUSEN PINTU DAN JENDELA, KAYU KAMPER Pekerja oh 6.000 28,000.00 168,000.00 Tukang kayu oh 18.000 40,700.00 732,600.00 Kepala tukang oh 1.800 48,400.00 87,120.00 Mandor oh 0.300 49,500.00 14,850.00 Balok kayu kamper m³ 1.200 8,280,000.00 9,936,000.00 Paku 5 cm - 12 cm kg 1.250 18,975.00 23,718.75 Lem kayu kg 1.000 11,500.00 11,500.00 Jumlah 9,971,218.75 1,002,570.00 10,973,788.75 Jasa konstruksi 10 1,097,378.88 Total 12,071,167.63 4.B 1 M2 DAUN PINTU DAN JENDELA, KAYU KAMPER Pekerja oh 1.000 28,000.00 28,000.00 Tukang kayu oh 3.000 40,700.00 122,100.00 Kepala tukang oh 0.300 48,400.00 14,520.00 Mandor oh 0.050 49,500.00 2,475.00 Papan kayu kamper m³ 0.040 9,890,000.00 395,600.00 Lem kayu kg 0.500 11,500.00 5,750.00 Jumlah 401,350.00 167,095.00 568,445.00 Jasa konstruksi 10 56,844.50 Total 625,289.50 4.C 1 M2 DAUN PINTU KACA RANGKA ALUMUNIUM Pekerja oh 0.085 28,000.00 2,380.00 Tukang besi oh 0.085 40,700.00 3,459.50 Kepala tukang oh 0.008 49,500.00 396.00 Mandor oh 0.004 49,500.00 198.00 Pintu alumunium m 4.400 977,500.00 4,301,000.00 Profil kaca m 4.500 2,650.00 11,925.00 Sealant tube 0.270 40,250.00 10,867.50 commit to user 317 Tugas Akhir Perencanaan Struktur Gedung Sekolah 2 Lantai RAB BAB 9 RENCANA ANGGARAN BIAYA NO MACAM PEKERJAAN MACAM BAHAN SATUAN KOEFISIEN HARGA SATUAN Rp JUMLAH HARGA BAHAN Rp JUMLAH HARGA UPAH Rp TOTAL Rp Jumlah 4,323,792.50 6,433.50 4,330,226.00 Jasa konstruksi 10 433,022.60 Total 4,763,248.60 4.D 1 M KUSEN ALUMUNIUM Pekerja oh 0.043 28,000.00 1,204.00 Tukang besi oh 0.043 40,700.00 1,750.10 Kepala tukang oh 0.0043 49,500.00 212.85 Mandor oh 0.0021 49,500.00 103.95 Profil alumunium m 1.100 92,000.00 101,200.00 Skrup fixer bh 2.000 95.00 190.00 Sealant tube 0.060 40,250.00 2,415.00 Jumlah 103,805.00 3,270.90 107,075.90 Jasa konstruksi 10 10,707.59 Total 117,783.49 4.E 1 M2 PINTU BESI PLAT BAJA Pekerja oh 1.050 28,000.00 29,400.00 Tukang besi oh 1.050 40,700.00 42,735.00 Kepala tukang oh 0.105 49,500.00 5,197.50 Mandor oh 0.052 49,500.00 2,574.00 Besi siku kg 15.000 8,050.00 120,750.00 Plat baja kg 32.800 10,350.00 339,480.00 Kawat las kg 0.050 69,000.00 3,450.00 Jumlah 463,680.00 79,906.50 543,586.50 Jasa konstruksi 10 54,358.65 Total 597,945.15

5. PEKERJAAN PERLENGKAPAN PINTU DAN JENDELA