Tugas Akhir
Perencanaan Struktur Gedung Sekolah 2 Lantai RAB
BAB 9 RENCANA ANGGARAN BIAYA NO
MACAM PEKERJAAN
MACAM BAHAN SATUAN
KOEFISIEN HARGA
SATUAN Rp
JUMLAH HARGA
BAHAN Rp
JUMLAH HARGA
UPAH Rp
TOTAL Rp
Kawat beton kg
2.250 11,500.00
25,875.00 Portland Cement PC
kg 336.000
1,178.75 396,060.00
Pasir beton m³
0.540 172,500.00
93,150.00 Kerikil
m³ 0.810
201,250.00 163,012.50
Balok kayu meranti m³
0.120 4,140,000.00
496,800.00 Plywood 9 mm
lbr 2.800
126,500.00 354,200.00
Bambu ori btg
32.000 7,475.00
239,200.00 Jumlah
3,490,537.50 280,878.50
3,771,416.00 Jasa konstruksi 10
377,141.60 Total
4,148,557.60 2.L
1 M3 TANGGA BETON BERTULANG 150 KG BESI + BEKISTING
Pekerja oh
5.600 28,000.00
156,800.00 Tukang batu
oh 0.350
39,600.00 13,860.00
Tukang kayu oh
2.300 40,700.00
93,610.00 Tukang besi
oh 1.400
40,700.00 56,980.00
Kepala tukang oh
0.405 48,400.00
19,602.00 Mandor
oh 0.202
49,500.00 9,999.00
Kayu sengon m³
0.250 2,127,500.00
531,875.00 Paku 5 cm - 12 cm
kg 3.000
18,975.00 56,925.00
Minyak bekisting ltr
1.200 9,200.00
11,040.00 Besi beton polosulir
kg 157.500
9,200.00 1,449,000.00
Kawat beton kg
3.000 11,500.00
34,500.00 Portland Cement PC
kg 336.000
1,178.75 396,060.00
Pasir beton m³
0.520 172,500.00
89,700.00 Kerikil
m³ 0.780
201,250.00 156,975.00
Balok kayu meranti m³
0.120 4,140,000.00
496,800.00 Plywood 9 mm
lbr 2.500
126,500.00 316,250.00
Bambu ori btg
14.000 7,475.00
104,650.00 Jumlah
3,643,775.00 350,851.00
3,994,626.00 Jasa konstruksi 10
399,462.60 Total
4,394,088.60
3. PEKERJAAN PASANGAN DAN PLESTERAN
3.A 1 M2 DINDING BATA MERAH TEBAL 12 BATA, 1 : 5
Pekerja oh
0.300 28,000.00
8,400.00
commit to user 315
Tugas Akhir
Perencanaan Struktur Gedung Sekolah 2 Lantai RAB
BAB 9 RENCANA ANGGARAN BIAYA NO
MACAM PEKERJAAN
MACAM BAHAN SATUAN
KOEFISIEN HARGA
SATUAN Rp
JUMLAH HARGA
BAHAN Rp
JUMLAH HARGA
UPAH Rp
TOTAL Rp
Tukang batu oh
0.100 39,600.00
3,960.00 Kepala tukang
oh 0.010
48,400.00 484.00
Mandor oh
0.015 49,500.00
742.50 Bata merah
bh 70.000
390.00 27,300.00
Portland Cement PC kg
9.680 1,178.75
11,410.30 Pasir pasang
m³ 0.045
129,375.00 5,821.88
Jumlah 44,532.18
13,586.50 58,118.68
Jasa konstruksi 10 5,811.87
Total 63,930.54
3.B 1 M2 PLESTERAN 1 : 5, TEBAL 15 MM
Pekerja oh
0.300 28,000.00
8,400.00 Tukang batu
oh 0.150
39,600.00 5,940.00
Kepala tukang oh
0.015 48,400.00
726.00 Mandor
oh 0.015
49,500.00 742.50
Portland Cement PC kg
5.184 1,178.75
6,110.64 Pasir pasang
m³ 0.026
129,375.00 3,363.75
Jumlah 9,474.39
15,808.50 25,282.89
Jasa konstruksi 10 2,528.29
Total 27,811.18
3.C 1 M2 ACIAN
Pekerja oh
0.200 28,000.00
5,600.00 Tukang batu
oh 0.100
39,600.00 3,960.00
Kepala tukang oh
0.010 48,400.00
484.00 Mandor
oh 0.010
49,500.00 495.00
Portland Cement PC kg
3.250 1,178.75
3,830.94 Jumlah
3,830.94 10,539.00
14,369.94 Jasa konstruksi 10
1,436.99 Total
15,806.93 3.D
1 M SPONING
Pekerja oh
0.200 28,000.00
5,600.00 Tukang batu
oh 0.100
39,600.00 3,960.00
Kepala tukang oh
0.010 48,400.00
484.00 Mandor
oh 0.004
49,500.00 198.00
Portland Cement PC kg
0.500 1,178.75
589.38
commit to user 316
Tugas Akhir
Perencanaan Struktur Gedung Sekolah 2 Lantai RAB
BAB 9 RENCANA ANGGARAN BIAYA NO
MACAM PEKERJAAN
MACAM BAHAN SATUAN
KOEFISIEN HARGA
SATUAN Rp
JUMLAH HARGA
BAHAN Rp
JUMLAH HARGA
UPAH Rp
TOTAL Rp
Jumlah 589.38
10,242.00 10,831.38
Jasa konstruksi 10 1,083.14
Total 11,914.51
4. PEKERJAAN KUSEN, PINTU DAN JENDELA
4.A 1 M3 KUSEN PINTU DAN JENDELA, KAYU KAMPER
Pekerja oh
6.000 28,000.00
168,000.00 Tukang kayu
oh 18.000
40,700.00 732,600.00
Kepala tukang oh
1.800 48,400.00
87,120.00 Mandor
oh 0.300
49,500.00 14,850.00
Balok kayu kamper m³
1.200 8,280,000.00
9,936,000.00 Paku 5 cm - 12 cm
kg 1.250
18,975.00 23,718.75
Lem kayu kg
1.000 11,500.00
11,500.00 Jumlah
9,971,218.75 1,002,570.00
10,973,788.75 Jasa konstruksi 10
1,097,378.88 Total
12,071,167.63 4.B
1 M2 DAUN PINTU DAN JENDELA, KAYU KAMPER
Pekerja oh
1.000 28,000.00
28,000.00 Tukang kayu
oh 3.000
40,700.00 122,100.00
Kepala tukang oh
0.300 48,400.00
14,520.00 Mandor
oh 0.050
49,500.00 2,475.00
Papan kayu kamper m³
0.040 9,890,000.00
395,600.00 Lem kayu
kg 0.500
11,500.00 5,750.00
Jumlah 401,350.00
167,095.00 568,445.00
Jasa konstruksi 10 56,844.50
Total 625,289.50
4.C 1 M2 DAUN PINTU KACA RANGKA ALUMUNIUM
Pekerja oh
0.085 28,000.00
2,380.00 Tukang besi
oh 0.085
40,700.00 3,459.50
Kepala tukang oh
0.008 49,500.00
396.00 Mandor
oh 0.004
49,500.00 198.00
Pintu alumunium m
4.400 977,500.00
4,301,000.00 Profil kaca
m 4.500
2,650.00 11,925.00
Sealant tube
0.270 40,250.00
10,867.50
commit to user 317
Tugas Akhir
Perencanaan Struktur Gedung Sekolah 2 Lantai RAB
BAB 9 RENCANA ANGGARAN BIAYA NO
MACAM PEKERJAAN
MACAM BAHAN SATUAN
KOEFISIEN HARGA
SATUAN Rp
JUMLAH HARGA
BAHAN Rp
JUMLAH HARGA
UPAH Rp
TOTAL Rp
Jumlah 4,323,792.50
6,433.50 4,330,226.00
Jasa konstruksi 10 433,022.60
Total 4,763,248.60
4.D 1 M KUSEN ALUMUNIUM
Pekerja oh
0.043 28,000.00
1,204.00 Tukang besi
oh 0.043
40,700.00 1,750.10
Kepala tukang oh
0.0043 49,500.00
212.85 Mandor
oh 0.0021
49,500.00 103.95
Profil alumunium m
1.100 92,000.00
101,200.00 Skrup fixer
bh 2.000
95.00 190.00
Sealant tube
0.060 40,250.00
2,415.00 Jumlah
103,805.00 3,270.90
107,075.90 Jasa konstruksi 10
10,707.59 Total
117,783.49 4.E
1 M2 PINTU BESI PLAT BAJA
Pekerja oh
1.050 28,000.00
29,400.00 Tukang besi
oh 1.050
40,700.00 42,735.00
Kepala tukang oh
0.105 49,500.00
5,197.50 Mandor
oh 0.052
49,500.00 2,574.00
Besi siku kg
15.000 8,050.00
120,750.00 Plat baja
kg 32.800
10,350.00 339,480.00
Kawat las kg
0.050 69,000.00
3,450.00 Jumlah
463,680.00 79,906.50
543,586.50 Jasa konstruksi 10
54,358.65 Total
597,945.15
5. PEKERJAAN PERLENGKAPAN PINTU DAN JENDELA