commit to user 321 Tugas Akhir Perencanaan Struktur Gedung Sekolah 2 Lantai RAB BAB 9 RENCANA ANGGARAN BIAYA NO MACAM PEKERJAAN MACAM BAHAN SATUAN KOEFISIEN HARGA SATUAN Rp JUMLAH HARGA BAHAN Rp JUMLAH HARGA UPAH Rp TOTAL Rp Mandor oh 0.120 49,500.00 5,940.00 Balok kayu bankirai m³ 1.100 9,430,000.00 10,373,000.00 Paku 5 cm - 12 cm kg 3.000 13,800.00 41,400.00 Besi strip tebal 5 mm kg 15.000 9,900.00 148,500.00 Jumlah 10,562,900.00 401,028.00 10,963,928.00 Jasa konstruksi 10 1,096,392.80 Total 12,060,320.80 6.F 1M PASANG NOK GENTENG BETON Pekerja oh 0.400 28,000.00 11,200.00 Tukang kayu oh 0.200 40,700.00 8,140.00 Kepala tukang oh 0.020 48,400.00 968.00 Mandor oh 0.002 49,500.00 99.00 Nok genteng beton bh 3.500 4,600.00 16,100.00 Paku payung kg 0.050 11,500.00 575.00 Portland Cement PC kg 10.800 1,178.75 12,730.50 Pasir pasang m³ 0.032 129,375.00 4,140.00 Semen warna kg 1.000 1,750.00 1,750.00 Jumlah 35,295.50 20,407.00 55,702.50 Jasa konstruksi 10 5,570.25 Total 61,272.75 6.G 1 M PASANG LISPLANK 3 × 20 cm, KAYU KAMFER Pekerja oh 0.100 28,000.00 2,800.00 Tukang kayu oh 0.200 40,700.00 8,140.00 Kepala tukang oh 0.020 48,400.00 968.00 Mandor oh 0.005 49,500.00 247.50 Kayu kamfer papan m³ 0.007 9,545,000.00 66,815.00 Paku biasa 2-5 kg 0.050 11,500.00 575.00 Jumlah 67,390.00 12,155.50 79,545.50 Jasa konstruksi 10 7,954.55 Total 87,500.05

7. PEKERJAAN PLAFOND

7.A 1 M2 PASANG PLAFOND AKUSTIK 60 × 120 cm + RANGKA ALUMUNIUM Pekerja oh 0.500 28,000.00 14,000.00 commit to user 322 Tugas Akhir Perencanaan Struktur Gedung Sekolah 2 Lantai RAB BAB 9 RENCANA ANGGARAN BIAYA NO MACAM PEKERJAAN MACAM BAHAN SATUAN KOEFISIEN HARGA SATUAN Rp JUMLAH HARGA BAHAN Rp JUMLAH HARGA UPAH Rp TOTAL Rp Tukang besi oh 0.500 40,700.00 20,350.00 Kepala tukang oh 0.050 48,400.00 2,420.00 Mandor oh 0.025 49,500.00 1,237.50 Profil alumunium m 3.600 48,300.00 173,880.00 Kawat dia. 4 mm kg 0.150 14,950.00 2,242.50 Ramset bh 1.050 2,875.00 3,018.75 Akustik 60 × 120 cm lbr 1.500 25,300.00 37,950.00 Jumlah 217,091.25 38,007.50 255,098.75 Jasa konstruksi 10 25,509.88 Total 280,608.63 7.B 1 M2 PASANG PLAFOND GYPSUM BOARD + RANGKA HOLLOW ALUMUNIUM Pekerja oh 0.500 28,000.00 14,000.00 Tukang besi oh 0.500 40,700.00 20,350.00 Kepala tukang oh 0.050 48,400.00 2,420.00 Mandor oh 0.025 49,500.00 1,237.50 Hollow alumunium m 0.800 36,400.00 29,120.00 Paku skrup bh 9.000 280.00 2,520.00 Ramset bh 1.000 2,875.00 2,875.00 Gypsum board lbr 1.000 60,950.00 60,950.00 Jumlah 95,465.00 38,007.50 133,472.50 Jasa konstruksi 10 13,347.25 Total 146,819.75

8. PEKERJAAN PENUTUP LANTAI DAN DINDING

8.A 1 M2 LANTAI KERAMIK UKURAN 30 × 30 cm Pekerja oh 0.700 28,000.00 19,600.00 Tukang batu oh 0.350 39,600.00 13,860.00 Kepala tukang oh 0.035 48,400.00 1,694.00 Mandor oh 0.035 49,500.00 1,732.50 Ubin keramik bh 11.870 8,337.50 98,966.13 Portland Cement PC kg 10.000 1,178.75 11,787.50 Pasir pasang m³ 0.045 129,375.00 5,821.88 Semen warna kg 1.500 1,750.00 2,625.00 Jumlah 119,200.50 36,886.50 156,087.00 Jasa konstruksi 10 15,608.70 commit to user 323 Tugas Akhir Perencanaan Struktur Gedung Sekolah 2 Lantai RAB BAB 9 RENCANA ANGGARAN BIAYA NO MACAM PEKERJAAN MACAM BAHAN SATUAN KOEFISIEN HARGA SATUAN Rp JUMLAH HARGA BAHAN Rp JUMLAH HARGA UPAH Rp TOTAL Rp Total 171,695.70 8.B 1 M2 LANTAI KERAMIK UKURAN 20 × 20 cm Pekerja oh 0.700 28,000.00 19,600.00 Tukang batu oh 0.350 39,600.00 13,860.00 Kepala tukang oh 0.035 48,400.00 1,694.00 Mandor oh 0.035 49,500.00 1,732.50 Ubin keramik bh 26.500 3,680.00 97,520.00 Portland Cement PC kg 10.400 1,178.75 12,259.00 Pasir pasang m³ 0.045 129,375.00 5,821.88 Semen warna kg 1.620 1,750.00 2,835.00 Jumlah 118,435.88 36,886.50 155,322.38 Jasa konstruksi 10 15,532.24 Total 170,854.61 8.C 1 M2 DINDING KERAMIK UKURAN 20 × 20 cm Pekerja oh 0.900 28,000.00 25,200.00 Tukang batu oh 0.450 39,600.00 17,820.00 Kepala tukang oh 0.045 48,400.00 2,178.00 Mandor oh 0.045 49,500.00 2,227.50 Ubin keramik bh 26.500 3,680.00 97,520.00 Portland Cement PC kg 9.300 1,178.75 10,962.38 Pasir pasang m³ 0.018 129,375.00 2,328.75 Semen warna kg 1.940 1,750.00 3,395.00 Jumlah 114,206.13 47,425.50 161,631.63 Jasa konstruksi 10 16,163.16 Total 177,794.79

9. PEKERJAAN SANITASI