commit to user 317
Tugas Akhir
Perencanaan Struktur Gedung Sekolah 2 Lantai RAB
BAB 9 RENCANA ANGGARAN BIAYA NO
MACAM PEKERJAAN
MACAM BAHAN SATUAN
KOEFISIEN HARGA
SATUAN Rp
JUMLAH HARGA
BAHAN Rp
JUMLAH HARGA
UPAH Rp
TOTAL Rp
Jumlah 4,323,792.50
6,433.50 4,330,226.00
Jasa konstruksi 10 433,022.60
Total 4,763,248.60
4.D 1 M KUSEN ALUMUNIUM
Pekerja oh
0.043 28,000.00
1,204.00 Tukang besi
oh 0.043
40,700.00 1,750.10
Kepala tukang oh
0.0043 49,500.00
212.85 Mandor
oh 0.0021
49,500.00 103.95
Profil alumunium m
1.100 92,000.00
101,200.00 Skrup fixer
bh 2.000
95.00 190.00
Sealant tube
0.060 40,250.00
2,415.00 Jumlah
103,805.00 3,270.90
107,075.90 Jasa konstruksi 10
10,707.59 Total
117,783.49 4.E
1 M2 PINTU BESI PLAT BAJA
Pekerja oh
1.050 28,000.00
29,400.00 Tukang besi
oh 1.050
40,700.00 42,735.00
Kepala tukang oh
0.105 49,500.00
5,197.50 Mandor
oh 0.052
49,500.00 2,574.00
Besi siku kg
15.000 8,050.00
120,750.00 Plat baja
kg 32.800
10,350.00 339,480.00
Kawat las kg
0.050 69,000.00
3,450.00 Jumlah
463,680.00 79,906.50
543,586.50 Jasa konstruksi 10
54,358.65 Total
597,945.15
5. PEKERJAAN PERLENGKAPAN PINTU DAN JENDELA
5.A 1 BUAH PASANG KUNCI PINTU 2 PUTARAN
Pekerja oh
0.010 28,000.00
280.00 Tukang kayu
oh 0.500
40,700.00 20,350.00
Kepala tukang oh
0.010 48,400.00
484.00 Mandor
oh 0.005
49,500.00 247.50
Kunci 2 putaran bh
1.000 63,250.00
63,250.00 Jumlah
63,250.00 21,361.50
84,611.50
commit to user 318
Tugas Akhir
Perencanaan Struktur Gedung Sekolah 2 Lantai RAB
BAB 9 RENCANA ANGGARAN BIAYA NO
MACAM PEKERJAAN
MACAM BAHAN SATUAN
KOEFISIEN HARGA
SATUAN Rp
JUMLAH HARGA
BAHAN Rp
JUMLAH HARGA
UPAH Rp
TOTAL Rp
Jasa konstruksi 10 8,461.15
Total 93,072.65
5.B 1 BUAH PASANG ENGSEL PINTU
Pekerja oh
0.015 28,000.00
420.00 Tukang kayu
oh 0.150
40,700.00 6,105.00
Kepala tukang oh
0.015 48,400.00
726.00 Mandor
oh 0.0008
49,500.00 39.60
Engsel pintu bh
1.000 8,050.00
8,050.00 Jumlah
8,050.00 7,290.60
15,340.60 Jasa konstruksi 10
1,534.06 Total
16,874.66 5.C
1 BUAH PASANG ENGSEL JENDELA
Pekerja oh
0.010 28,000.00
280.00 Tukang kayu
oh 0.100
40,700.00 4,070.00
Kepala tukang oh
0.010 48,400.00
484.00 Mandor
oh 0.0005
49,500.00 24.75
Engsel jendela bh
1.000 8,050.00
8,050.00 Jumlah
8,050.00 4,858.75
12,908.75 Jasa konstruksi 10
1,290.88 Total
14,199.63 5.D
1 BUAH PASANG GRENDEL JENDELA
Pekerja oh
0.015 28,000.00
420.00 Tukang kayu
oh 0.150
40,700.00 6,105.00
Kepala tukang oh
0.015 48,400.00
726.00 Mandor
oh 0.00075
49,500.00 37.13
Grendel jendela bh
1.000 8,625.00
8,625.00 Jumlah
8,625.00 7,288.13
15,913.13 Jasa konstruksi 10
1,591.31 Total
17,504.44 5.E
1 BUAH PASANG HAK ANGIN JENDELA
Pekerja oh
0.015 28,000.00
420.00 Tukang kayu
oh 0.150
40,700.00 6,105.00
Kepala tukang oh
0.015 48,400.00
726.00
commit to user 319
Tugas Akhir
Perencanaan Struktur Gedung Sekolah 2 Lantai RAB
BAB 9 RENCANA ANGGARAN BIAYA NO
MACAM PEKERJAAN
MACAM BAHAN SATUAN
KOEFISIEN HARGA
SATUAN Rp
JUMLAH HARGA
BAHAN Rp
JUMLAH HARGA
UPAH Rp
TOTAL Rp
Mandor oh
0.00075 49,500.00
37.13 Kait angin
bh 1.000
7,475.00 7,475.00
Jumlah 7,475.00
7,288.13 14,763.13
Jasa konstruksi 10 1,476.31
Total 16,239.44
5.F 1 BUAH PASANG TARIKAN JENDELA
Pekerja oh
0.015 28,000.00
420.00 Tukang kayu
oh 0.150
40,700.00 6,105.00
Kepala tukang oh
0.015 48,400.00
726.00 Mandor
oh 0.00075
49,500.00 37.13
Tarikan bh
1.000 8,050.00
8,050.00 Jumlah
8,050.00 7,288.13
15,338.13 Jasa konstruksi 10
1,533.81 Total
16,871.94 5.G
1 M2 PASANG KACA BENING, TEBAL 5 MM
Pekerja oh
0.015 28,000.00
420.00 Tukang kayu
oh 0.150
40,700.00 6,105.00
Kepala tukang oh
0.015 48,400.00
726.00 Mandor
oh 0.00075
49,500.00 37.13
Kaca m²
1.100 74,750.00
82,225.00 Jumlah
82,225.00 7,288.13
89,513.13 Jasa konstruksi 10
8,951.31 Total
98,464.44
6. PEKERJAAN ATAP