Western I ndonesia National Roads I mprovement Project 13
and the official starting date of the contract was set at 6 November 2012. The following table shows a list of contract amendment for the CTC contract
with DGH.
Contract Date
USD Excl. VAT IDR Excl. VAT
Original Contract 5-Nov-2012
1,276,700 21,415,400,000
3.2 DSC Consultants
A Design and Supervision Consultant DSC will be responsible for design of WP-2 and WP-3 civil works and supervision of all civil works. They will have the role of
‘Engineer’ under a FIDIC-type contract. The tasks include the preparation and maintenance of a quality assurance plan, validation and updating of designs,
supervision of all civil works, environmental and social monitoring and management, and support for financial and progress monitoring and reporting. The DSC will also be
responsible for quality assurance of materials and workmanship, certifying whether or not contractors have achieved the required results, as well as documentation and
reporting based on the financial management plan. They will prepare a Quality Assurance system covering all subprojects, and continuously monitor the
effectiveness of their supervision procedures. The team will be contracted and managed by DGH through the BinaMarga Regional Office Balai II, and will be based
in Padang, West Sumatra.
4 CIVIL WORKS
4.1 Detailed Design Preparation
Final Engineering Designs, Engineer’s Estimates and bidding documents have been completed for all projects proposed for WP-1.
WP-2 nine subprojects and WP-3 eight subprojects will be designed by DSC and the construction supervision of all the works programs will be performed by the DSC.
During the CTC mobilization, the DSC has not been established yet. In parallel with the instruction to speed up the process, detailed engineering design DED of some
subprojects of WP-2 and WP-3 were prepared and completed by respective P2JN.
Senior Highway Engineer is mobilized on schedule on 1 February. Senior Highway Engineer has implemented Technical Design Review with Highway
Engineer for Package No.5 Sp. Rampa – Poriaha. Simultaneously, Senior Highway Engineer have prepared the technical parts in the Project Management Manual for
WINRIP project which reflected Indonesia BINA MARGA manual and International design manual in order to review the technical design review exactly than other things.
The Technical Review and Road Safety Review Report have been included the checklists of Road Engineering and Road Safety audit each package by Senior
Highway Engineer and Senior Road Safety Auditor.
Progress of Technical Design Reviewing up to the end of February 2013 is included as Appendix B.
Western I ndonesia National Roads I mprovement Project 14
4.2 Procurements
Procurement shall be conducted under the Bank’s Procurement Procedures as mentioned in the Loan Agreement. The International Competitive Bidding ICB will
apply to the packages with the construction estimated cost more than US 10 Million to comply with the Bank’s threshold for ICB. According to the GOI regulation, a
prequalification shall be applied for the packages with the construction estimated cost more than IDR 10 Billion.
Therefore, all subprojects for WP-1 have been started with prequalification since 30 December 2011 for ICB multiple contract. This was an advanced procurement action
agreed by both DGH and the World Bank prior to the CTC establishment. The deadline of Qualification Document submission by the Applicants was on 28 February 2012.
There are twenty nine 29 Applicants who submitted and applied their qualification documents for various packages which are summarized as follow.
• Package No. 1 Krui – Biha
: 13 Applicants applied. •
Package No. 2 Pd. Sawah – Sp. Empat : 13 Applicants applied. •
Package No. 3 Manggopoh – Pd. Sawah : 18 Applicants applied. •
Package No. 4 Ipuh – Bantal : 12 Applicants applied.
No Singles JO Legal Name
Participate and Result of the PQ Package
No.1 Package
No.2 Package
No.3 Package
No.4
1 PT. AdhiKarya Persero, Tbk.
Applied NA
NA Applied
2 PT. AdhiKarya - PT. AngkasapuriKonsursindo, JO.
NA Applied
Applied NA
3 PT. BangunCiptaKonstruksi - PT. AmartaKarya Persero, JO.
Applied NA
NA NA
4 PT. BrantasAbipraya Persero
Applied NA
Applied NA
5 PT. Citra GadingAsritama
NA NA
NA Applied
6 PT. ConblocInfratecno
Applied NA
Applied NA
7 PT. Duta Graha Indah, Tbk.
Applied Applied
Applied NA
8 PT. HutamaKarya Persero
NA Applied
Applied NA
9 PT. HutamaKarya Persero - PT. SuciKarya Bad inusa, JO.
Applied NA
NA Applied
10 PT. Jaya Konstruksi MP, Tbk. Applied
Applied Applied
Appli ed 11 Kuk Dong Eng. Corp. - PT. Duta Graha Indah, Tbk., JO.
NA NA
NA Applied
12 PT. Multi Structure Applied
Applied Applied
Applied 13 PT. NindyaKarya Persero
NA Appli ed
Applied Appli ed
14 PT. NindyaKarya Persero - PT. RindangTigasatuPratama, JO. Applied
NA NA
NA 15 Pan Asia Corp. - PT. AnugerahKarya Agra Sentosa, JO.
Applied NA
Applied Appli ed
16 PT. PP Persero, Tbk. NA
Applied Applied
NA 17 PT. PP Persero Tbk - PT. Tri Citra Perdana JO.
Applied NA
NA Applied
18 PT. WaskitaKarya Persero NA
Applied Applied
NA 19 PT. WaskitaKarya Persero - PT. AngkasaPuriKonsursindo, JO.
Applied NA
NA NA
20 PT. WaskitaKarya Persero - PT. DayaMuliaTurangga, JO. NA
NA NA
Applied 21 PT. WijayaKarya – PT. LubukMinturunKaryaPersada, JO.
NA Applied
Applied Applied
22 PT. Yasa Patria Perkasa NA
NA Applied
NA 23 PT. AngkasaTeknik Raya
NA Applied
Applied NA
24 PT. BangunCipta - Barettamuda KSO. NA
NA Applied
NA 25 PT. BumiRejo
Applied NA
NA Applied
26 PT. CiptaKarya Prima Mandiri NA
Applied Applied
NA 27 PT. SumberBatu
NA Applied
NA NA
28 Synohidro Co. Ltd. NA
Applied Applied
NA 29 PT. TelagaMegabuana - PT. Mawatindo Road Construction, JO
NA NA
Applied NA
No. Of applicants submitted the document 13
13 18
12
•
Note : NA = Not Applied for Prequalification
.