Road Sector Institutional Development
Western I ndonesia National Roads I mprovement Project 33
Project Manager PPK Head of Unit with a duration of about one month, it may not be too relevant to the implementation of this project.
In a coordination meeting on February 13, 2013, which was followed by the Chairman and Vice Chairman and members of the PMU WINRIP, the World Bank, Directorate
of Planning and Directorate of Implementation Regional I, Procurement Committee Pokja Pengadaan Lampung, Bengkulu and West Sumatra, BBPJN II and III,
SatkerPPK of National Road Implementation from BBPJN II and III, and CTC WINRIP, noted that one of the delays Factor is related to the quality of the
Procurement Committee.
Therefore in order to speed up the procurement process and reduce delays, there should be efforts to increase the competences and the equation of knowledge and
skills in Tender Document control, based on World Bank guidelines, including the preparation of Owner Estimate OE for members of the Procurement Committee
POKJA and the related Working Unit.
There was proposed to conduct of a Workshop on Bidding Documents Evaluation for to increase the competences of the members of the Procurement Committee for the
understanding and applying of the Standard Bidding Document SBD, as well as Bid Evaluation Report BER.
This workshop was not listed in WINRIP training program, but due to an urgent need, it needs to be implemented.
The Community Development Officer, as requested by Director of Planning and coordinated by Assistant Team Leader of the CTC, should prepare and arrange this
workshop, including providing the materials and speakers or presentersfacilitator, looking for the venue, organizing and coordinating the workshop implementation.
The Workshop on Bidding Documents Evaluation was being delivered from 28 February to 1 March 2013, in Swiss-belhotel, Jalan Kemang Raya No. 7 Jakarta
Selatan, Tlp: 021-7198000, Fax: 021-719088, attended by 33 participants from Procurement Committee Pokja Pelelangan from Provinces, SatkerPPK
Pelaksanaan Jalan Nasional, on AWP-1 of WINRIP, BPJN II III , and PMU WINRIP.
Target Group of the workshop was Procurement Committee Pokja Pelelangan from four provinces, Project Manager SatkerPPK National Roads Implementation from
four packages Annual Works Program AWP-1, Official staff of Balai BBPJN II Padang BBPJN III Palembang, and PMU WINRIP.