Performance Indicators World Bank and GOI Compliance .1

Western I ndonesia National Roads I mprovement Project 31 of a training program to support project management and implementation. The CTC contract No. 06-20CTCTALN80431112 was signed on 5 November 2012 by both DGH and a Joint Venture of PT. PerentjanaDjaja, Yongma Engineering Co.Ltd., and PT. EpadasconPermata Engineering Consultant. The main CTC activities during February 2013 included: • Continue mobilizing CTC personnel Senior Highway Engineer, Assistant Community Development Officer and supporting staff. • Continue assistance to PMU as and when required. • Finalize and submit Monthly Progress Report No.1 for the month of January 2013. • Attend the kick off and wrap up meeting for the Bank Implementation Review Mission. • Review and finalized draft Bidding Document for Package No. 05 : Simpang Rampa – Poriaha North Sumatra Province. • Continue preparing draft LARAP Monitoring Report for Package No.01 Krui – Biha. • Continue preparing draft LARAP Monitoring Report for Package No.02 Padang Sawah – Simpang Empat. • Continue preparing draft LARAP Monitoring Report for Package No.03 Manggopoh – Padang Sawah. • Continue preparing draft LARAP Monitoring Report for Package No.04 Ipuh – Bantal. • Review and update WINRIP Procurement Plan. • Review WINRIP PMM Project Management Manual especially Financial Management aspects. The following table summarized the CTC personnel field activities during February 2013. Date Position Destination Purpose 4 – 7 February 2013 Assistant Team Leader, Environmental Specialist and Socio Impact Specialist West Sumatra and Lampung The Bank Implementation Review Mission site visits. 21 – 25 February 2013 Environmental Specialist and Socio Impact Specialist West Sumatra LARAP monitoring for Package No. 02 and 03 Padang Sawah – Simpang Empat and Manggopoh – Padang Sawah and survey for traditional markets along the project links.

6.2.2 Design and Supervision Consultant DSC

The Design and Supervision Consultant DSC will be responsible for design of WP 2 and WP 3 civil works and supervision of all civil works. They will have the role of ‘Engineer’ under a FIDIC-type contract. The tasks include the preparation and maintenance of a quality assurance plan, validation and updating of designs,