BAB IV NERACA ENERGI
Basis perhitungan = 1 jam operasi Satuan operasi = kiloJoulejam kJjam Kapasitas produksi = 1200 tontahun Suhu Referensi = 25 o C 298,15 K4.1 Feed Preheater 1 E-401
Tabel 4.1 Neraca Energi pada Feed Preheater Alur masuk H kjjam Alur keluar H kjjam Umpan 4.772,3217 - Produk - 483.069,825 Gas proses dari Converter 2.023.671,31 1.545.373,58 Total 2.028.443,632 2.028.443,4054.2 Desulfurisasi R-201
Tabel 4.2 Neraca Energi pada Desulfurisasi Entalpi masuk Entalpi keluar Komponen H kjjam H kjjam CH 4 399615,733 412433,32 C 2 H 6 27315,9022 28225,076 C 3 H 8 21211,5437 21912,747 i-C 4 H 10 5502,42127 5683,5353 n-C 4 H 10 6741,2801 6963,0545 C 5 H 12 4086,4773 4220,7018 C 6 H 14 2827,889 2920,6324 CO 2 10064,8909 10354,691 N 2 5602,10561 5750,4392 H 2 S 101,582073 - Universitas Sumatera Utara4.3 Mixing Point M-201
Tabel 4.3 Neraca Energi padaMixing Point Masuk kjjam Keluar kjjam Umpan 498.563,97 steam 2.954.249,34 Produk 3.452.813.309 dqdt Total 3.452.813.309 3.452.813.3094.4 Feed Heater H-301
Tabel 4.4 Neraca Energi padaFeed Heater Alur masuk H kjjam Alur keluar H kjjam Umpan 3.452.813.309 - Produk - 4.019.468,554 dQdT 566.655,245 Total 4.019.468,554 4.019.468,554 H 2 O - 419,72766 subtotal 483.069,825 498.883,92 Entalpi reaksi -442,464 dQdT 15.371,681 Total 498.441,506 498.441,456 Universitas Sumatera Utara4.5 Steam Reformer R-301
Tabel 4.5 Neraca Energi pada Steam Reformer Komponen Entalpi Masuk Entalpi Keluar kjjam kjjam CH 4 540190,81 150490,51 C 2 H 6 37288,411 349,61555 C 3 H 8 28915,569 5761,214 i-C 4 H 10 7488,9428 2961,4957 n-C 4 H 10 9175,2408 3632,6735 C 5 H 12 5559,7804 2209,8957 C 6 H 14 3840,9158 1085,7138 CO 2 13164,531 22573,825 N 2 7175,2928 11867,564 H 2 O 3400201,98 2373426,76 CO 568220,79 H 2 1567750,1 Sub total 4.019.468,554 4.710.330,16 ∆ H r 4.606.124,54 dQdT - 3.915.262,935 Total 4.710.330,16 4.710.330,164.6 Feed Steam Superheater H-302
Tabel 4.6 Neraca Energi padaSteam Superheater Masuk Keluar kjjam kjjam Steam masuk 2.627.925,034 Steam keluar 2.954.249,339 dQdT 326.324,305 Total 2.954.249,339 2.954.249,339 Universitas Sumatera Utara4.7 Feed Steam Water Preheater H-303
Masuk Keluar kjjam kjjam Steam masuk 111.497,87 Steam keluar 611.653,00 dQdT 500.155,13 Total 611.653,0029 611.653,0034.8 Feed Steam Air Preheater H-304
Parts
» Perumusan Masalah Tujuan Perancangan Ruang Lingkup Perancangan
» Gambaran umum hidrogen TINJAUAN PUSTAKA
» Penggunaan Hidrogen TINJAUAN PUSTAKA
» Pemanfaantan Gas alam natural gas
» Steam Methane Reforming SMR atau cracking Oksidasi parsial
» Integrated gasification combined cycle IGCC Pirolisis
» Elektrolisis air Produksi hidrogen secara biologi
» Unit penyerap kotoran preassure swing adsorbtion PSA A-501
» Katalis Zink Oksida Katalis Ni Metana CH Ethana C Propane C
» Tangki Stock Bahan baku Gas Alam T-101 Kompresor C-101 Feed Preheater E-401 Desulfurisasi R-201
» Reformer Furnace R-301 Waste Heat Boiler E-301 High Temperatur Shift R – 401
» Water Cooler I E-402 Water Cooler II E-403 Water Cooler III E-403
» Knock-Out Drum D-401 Pressure Swing Adsorption Unit A-501 Tangki PSA Off-gas D502
» Tujuan Pengendalian Jenis-Jenis Pengendalian dan Alat Pengendali
» Syarat Perancangan Pengendalian Elemen Pengendali Akhir
» Keselamatan Kerja Pabrik Hidrogen
» Kebutuhan air proses Kebutuhan air lainnya
» Screening Sedimentasi Klarifikasi Kebutuhan Air
» Kebutuhan Uap air Steam Kebutuhan Listrik Kebutuhan Bahan Bakar
» Bak Penampungan BP Bak Pengendapan Awal BPA Bak Netralisasi BN
» Unit Pengolahan Limbah dengan Sistem Trickling Filter
» Lokasi Pabrik LOKASI DAN TATA LETAK PABRIK
» Tata Letak Pabrik Perincian Luas Tanah
» Bentuk Organisasi Garis Bentuk Organisasi Fungsionil Bentuk Organisasi Garis dan Staf
» Manajemen Perusahaan ORGANISASI DAN MANAJEMEN PERUSAHAAN
» Dewan Komisaris Direktur Staf Ahli Sekretaris Manajer Produksi
» Sistem Kerja Jumlah Karyawan dan Tingkat Pendidikan
» Sistem Penggajian ORGANISASI DAN MANAJEMEN PERUSAHAAN
» Tata Tertib JAMSOSTEK dan Fasilitas Tenaga Kerja
» Modal Investasi Tetap MIT Fixed Capital Investment FCI Modal Kerja Working Capital WC
» Break Even Point BEP Return on Investment ROI Pay Out Time POT Return on Network RON
» Tangki Penyimpanan gas alam T-101
» Compressor C-101 Feed Preheater E-401
» Reaktor Steam Reformer R-301
» High Temperature Shift Reactor R-401
» Knock-Out Drum D-401 KESIMPULAN
» Pressure Swing Adsorption Unit A-501
» Compressor Hydrogen C-502 KESIMPULAN
Show more