Draw Downs and Future Costs Disbursement Management Information System World Bank and GOI Compliance

Western I ndonesia National Roads I mprovement Project 5 - 3 a. File Storage Server, used to stored all files of report and other document. Please check the URL address http:storage.winrip-ibrd.com . b. Document Management System DMS, used to record all information of letter and document files. The URL address of the DMS application will be at http:dms.winrip-ibrd.com . The DMS have 2 main modules below:

1. Letter Database System, used to record all information of incoming and

outgoing letter.

2. Document Library System, used to record all information of document and

report files. Western I ndonesia National Roads I mprovement Project 6 - 1 6 PROJECT PERFORMANCE

6.1 World Bank and GOI Compliance

6.1.1 World Bank Missions

During the period October 2015 there was no implementation review mission nor site visit. However, the regular Monthly Meeting to review the implementation progress and monitoring or updating of the key activities of the Agreed Key Action Plans was held on October 19, 2015.

6.1.2 Agreed Key Actions and Mission Plans during Recent World Bank Mission

A list of the key actions monitored during the period are listed below. No . Action By Whom Updated Status Oct 19, 2015 Current Target Dates Sept 7, 2015 Update Status 16 Oct 2015 1. Carry out workshop on HIV-AIDS for packages 1, 2, 3 and 4 PMUCTCDS C • Nov 9 for package 1 and 17 • Nov 12 for package 2 and 3 • Nov 17 for package 4 and 11 • Nov 18 for package 6 and 19 • Nov 19 for package 13 1 month after NOL to DSC contract amendment since it envisages a new environmental specialist • CTC already coordinate with contractor, Komisi Penanggulangan Aids Indonesia KPAI and KPAD • Balai will coordinate contractor and TL DSC for AIDS socialization 2. Submit to the Bank the LARAP monitoring reports for: • Package 2 • Package 3 • Package 11 • Package 16 PMU • End of Nov , 2015 • End of Jan, 2016 • End of Oct, 2015 terkirim ke WB dokumen pembayaran untuk 15 WTP secara informal • End of Oct 2015 terkirim ke WB dokumen pembayaran • Need decision on slope design decision by end of Sep 2015 • End of Sep 2015 • End of Sep 2015 • End of Sep 2015 • Balai II decided to implement original DED. Additional LARAP implementation is needed 24 PAPs. Budget has been allocated in the APBD 2015 • 2 PAPs are canceled. 1 PAP will be paid for Air Gadang Bridge • 1 PAP already paid. • Balai decided for embankment area needed additional land acquisition for slope protection • 154 PAPs already paid total 262 PAPs • Final payment End of Nov 2015 • 234 PAPs already paid total 316 PAPs • Final Payment End of Nov 2015 Western I ndonesia National Roads I mprovement Project 6 - 2 No . Action By Whom Updated Status Oct 19, 2015 Current Target Dates Sept 7, 2015 Update Status 16 Oct 2015 • Package 5 • Package 17 • Package 13 untuk 102 WTP secara informal • End of Oct 2015 Berita acara relokasi 1 WTP akan terkirim ke WB • End of Oct 2015 terkirim ke WB data administrasi 231 WTP • 15 Dec 2015 terkirim ke WB data administrasi 1500 WTP • End of Oct 2015 • Sep 14, 2015 • End of Sep 2015 • 1 PAP already relocated. 60 PAPs additional will be paid on Dec 2015 • Total 2.269 PAPs. 461 PAPs already paid. The remaining PAPs will be paid on Dec 2015 • Total 3.295 PAPs. 189 PAPs already paid. Half of the remaining PAPs will be paid in 2015 and the rest will be paid in 2016 3. Bidding process on disaster management • Send to Bank the revised ToR • Re-announce the RFP PMU and CTC • Meeting on Oct 21, 2015 • A meeting with Subdit LKJ will be held by 10 Sep 2015 to finalize the ToR, the Tor will afterward be sent to the Bank and the request for manifestation published • 4. • Send bidding document Packages 20, 21 • Send bidding document Packages 14, 16 PMU • Langsung tender setelah terima surat WB tanggal 20 Oct 2015 • 14 Sep 2015 • End of Sep 2015 • Draft Bid Document sent to Balai II Package 20, 21, 14 for review. Will be sent to WB approximately on the third week of Oct 2015 • Procurement process schedule on the beginning of Nov 2015 • SBD sent to Balai III Package 16. OE is waiting for approval from DGH. Draft bid document will be sent to WB end of Oct 2015 • Procurement process schedule on the mid of Nov 2015 5. Package 2: Accelerate the processing of the necessary contact modification, which needs to cover all accesses to property and any time extension and send it to the Bank if it is above 15 PMU • Mid of Nov 2015 proposal of variation order more than 15 and time extension • Need decision on slope design to finalize the contract modification request decision by end of Sep 2015 • Needed contract new modification regarding to explanation package 2 in the row no. 2 above 6. Package 3: Send draft amendment for package 3 19 for prior Bank no- objection, which needs to cover all accesses to property and DSC needs to push contractor to submit soft drawing of cross section to propose PMU • Mid of Nov 2015 proposal of variation order more than 15 and time extension • Need decision on slope design to finalize the contract modification request decision by end of Sep 2015 • Needed contract new modification regarding to explanation package 3 in the row no. 2 above Western I ndonesia National Roads I mprovement Project 6 - 3 No . Action By Whom Updated Status Oct 19, 2015 Current Target Dates Sept 7, 2015 Update Status 16 Oct 2015 variation order 7. Report back to the Bank on how DGH has implemented the recommendations of the auditors in the auditing report of the 2014 financial statements partial response at least while waiting for feedback from the Balai PMU • End of Oct 2015 • Sending partial report P1, P2, P3 by 11 Sep 2015 • Sending full report by end of Oct 2015 • Partially Done 8. Send to the Bank a request for modification of the contract with DSC PMU • Oct 21, 2015 • Mid of Sep 2015 revised version of request • By Sep 8, 2015 clarify with the DSC PPK and send to the Bank a response to the questions raised in July • 9. Send restructuring request to the Bank Ministry of Finance • 23 Oct 2015 send to DG • PMU will send the draft request to DG by Oct 23, 2015 • 10. Send the response to the Bank on the TFAC reports for packages 2 and 3 and the supervision mission reports for package 1 and 4 Response in format similar to EINRIP project PMU • Package 4 send on 23 Oct 2015 • Package 2 and 3 review by CTC • Package 1 review by DSC and will be sent on 26 Oct 2015 • Sep 21, 2015 • Needed report revision from PPK all packages 11. Organize formal supervision mission for the project with BappenasMoF Bank PMU • Kick off meeting Nov 10, 2015 • Closing meeting TFAC Nov 6, 2015 • Wrap up meeting Nov 13, 2015 tentative • Site visit TFAC schedule on Oct 26,2015 to Padang and Nov 2, 2015 to Bengkulu • Site Visit SocialEnviron ment 27, 28, 29 Oct to Sibolga and Nov 2 to Bengkulu and Nov 4 to Lampung • Mid-October 2015 • Western I ndonesia National Roads I mprovement Project 6 - 4

6.1.3 Performance Indicators

GOI and the World Bank have agreed on a set of Key Performance Indicators KPIs to measure the project s performance in achieving its stated development objectives. These KPIs are provided in the WINRIP Project Implementation Plan PIP, together with baseline data and targets. The annual targets for KPIs that are indicated in the Project Implementation Plan are based on the initial Project Implementation Schedule as shown in Appendix I. The CTC have established the precise definitions, calculation methods and data collection procedures to monitor the KPIs. Actual traffic count surveys to collect primary field data were conducted using two 2 methods the Mobile Observer Traffic Counts MOTC and the Permanent Station Traffic Counts PSTC for determination of AADT data in updating the target and actual AADTs. The surveys were conducted intermittently during the 1 st quarter of 2015 along roadlinks Packages 6, 8, 9, 14, 15 and 19. Based on evaluation and technical analysis of traffic count from the six 6 roadlines using the two 2 methods, it appears that the AADT derived from the Permanent Station Traffic Counts PSTC have an average forecast AADT of 12,696 vehicles per day which is above the 11,351 vehicles per day in 2014. While the data from Mobile Observer Traffic Counts MOTC , the average forcast AADT of 6,310 vehicles per day is well below the targeted vehicles per day of 11,351 in 2014. Due to lesser degree of accuracy of the MOTC method, the calculate average forecast AADT has been disregarded. From the baseline 2010 AADT and estimated AADT for the year 20142015, the extrapolated AADT for the year 2013 resulted to 11,254 vehicles per day or 8.8 above the targeted 10,347 vehicles per day in 2013. Shown below is the comparison between target and actual estimated AADT. Year Targeted AADT Estimated Baseline 2010 7,837 FY1 2013 target 10,347 FY1 2013 actual 11,254 FY2 2014 target 11,351 FY2 2014 actual 12,696 FY3 2015 target 12,453 FY4 2016 target 13,304 FY5 2017 end target 14,214 The detailed Report indicating all the assumption, basis, evaluation results and conclusion have been submitted to PMU on May 18, 2015 with copy furnished to World Bank. Western I ndonesia National Roads I mprovement Project 6 - 5

6.2 Implementation Support Components

6.2.1 Core Team Consultant CTC

The CTC is responsible to provide support to the PMU and DGH in the management of the Project, based in Jakarta. The CTC tasks include financial and progress monitoring and reporting, information management and dissemination, quality assurance and performance review for the Design and Supervision Consultants DSC, implementation and monitoring of the anti-corruption action plan, support for project monitoring and evaluation, and support for implementation of a training program to support project management and implementation. The CTC contract No. 06-20CTCTALN80431112 was signed on 5 November 2012 by both DGH and a Joint Venture of PT. Perentjana Djaja, Yongma Engineering Co.Ltd., and PT. Epadascon Permata Engineering Consultant. The main CTC activities during September 2015 are as follows: • Prepared format of Summary Status for WINRIP. • Presented to the Kasatker of PAP2PHLN the individual professional staff Work Program and Schedule for 2015 to 2017. • Prepared format for land acquisition progress monitoring. • Prepared Draft of proposed reallocation and justification for realigment of funds for the different categories of the original loan amount and discussed the proposal with PMU and WB. • Monitoring the implementations of the ESAMP, anti-corruption action plans, complains from project site, progress of LARAP, procurement activities and financial progress. • Prepared and issued various letters to PMU and DSC. • Submitted various Reports to PMU concerning the status of LARAP implementations. • Conducted joint site inspection with DSC, PPK and Contractor on Contract Packages 4, 6, 11, 13, and 19 to assess the actual progress and quality of works and evaluate Contractor s capability to complete the contract on the target dates of completion. • Conducted final back checking of DED drawings for packages 14, 16, 20, 21 to ascertain and confirm whether WB and CTC comments were incorporated in the final submittals. • Co-Team Leader and Quality Assurance Engineer attended pre-construction meeting in Palembang on September 17, 2015 and in Lampung on September 28, 2015 for Contract Package No.17. • Assited the Procurement Committee POKJA of BALAI 2 in the evaluation of bids and preparation of Bid Evaluation Report BER for Packages 7, 8, 10 and 12. • Monitored the actual construction progresses of the ten 10 on-going contract packages and advised PMU of the current situations of the sub-projects. • Attended various meetings.

6.2.2 Design and Supervision Consultant DSC

The Design and Supervision Consultant DSC will be responsible for design of WP 2 and WP 3 civil works and supervision of all civil works. They will have the role of Engineer under a FIDIC-type contract. The tasks include the preparation and maintenance of a quality assurance plan, validation and updating of designs, supervision of all civil works, environmental and social monitoring and management, and support for financial and progress monitoring and reporting. The DSC will also be responsible for quality assurance of materials and workmanship, certifying whether or not contractors have achieved the required results, as well as documentation and reporting based on the financial management plan. They will prepare a Quality Assurance system Western I ndonesia National Roads I mprovement Project 6 - 6 covering all subprojects, and continuously monitor the effectiveness of their supervision procedures. The team will be contracted and managed by DGH through the Bina Marga Regional Office Balai II, and will be based in Padang, West Sumatera. DSC contract was negotiated in Balai Besar Pelaksanaan Jalan Nasional II Balai-II of DGH. The negotiation result and draft contract have been sent to WB on 25 March 2013 for review and approval. The Bank issued no objection letter on the negotiation results and draft contract with letter dated 19 April 2013.

6.2.3 Road Sector Institutional Development

This component consists of technical assistance for capacity building for the new environmentrisk mitigation and road safety unit to enhance its capacity for disaster risk assessment and planning, risk mapping of land-slides, coastal erosion, earthquake and floods, analysis of alternative road designs for road segments passing through critical environmental assets and vulnerable areas. It is planned so far that there will be only one 1 consultant services for Capacity Building of Disaster Risks Reduction as the two 2 other services are to be deleted.

6.3 TRAINING TO SUPPORT PROJECT IMPLEMENTATION

The work during this reporting month is actually inseparable continuation of what were prepared and done during previous month September 2015 summarized below: • Continuing to prepare the implementation of second special Training on Application of PMM for Contractors and Consultants, while awaiting the PMU would decided a certain date of PMM training delivery, andor preparing other alternative, i.e: moving the training location to for instant: Bengkulu, Padang, or Jakarta. • Implementing the RKPPL Training in Sibolga for packages 05 and 15, in the first week of October 2015. The work during this reporting month was then focused on the following activities:

6.3.1 Continuing to prepare the implementation of the PMM Socialization Training or as per

the TOR: Training on the Application of Project Management Manual PMM.  Preparing to deliver the Application of Project Management Manual PMM Training. It would be a special PMM training mainly addressed to the Supervision Consultants staff SE and CIQE and Contractors staff GS QM. Some DGH OfficialStaff related to the packages involved were also included as the participants.  It would be the second Application of PMM Training to be addressed to packages 05, 15, 13, and 17. Two packages from North Sumatera packages: 05 and 15, one from Bengkulu package 13, and one from Lampung package 17. Package 13 would be just for the supervision consultants who did not attend the previous training yet.  It was initially proposed to be held in Sibolga in the 2 nd week of March 2015, but it was postponed to July 2015. However, it was then postponed again to the 4 th week of August or 1 st week of September 2015, because of Fasting Month and Idul Fitri. Western I ndonesia National Roads I mprovement Project 6 - 7  The preparation had been getting underway since mid of August 2015.. The prospective participants had been identified, and so had the locationvenues. The preparation of the materials and logistics was started.  Unfortunately, this training, had, again, be postponed. There were still some problems with package 15, that would result in delay of mobilization of consultant contractor staff who would be part of the main targets of this training. Therefore, the PMU considered for the time being to postpone this training delivery in Sibolga. PMU would discuss this matter with CTC to find temporary measure or alternative solution.  While awaiting for the definite time decided by the PMU, since mid of this reporting month all CTC Professional Staff have been assigned by CTC Co-Team Leader to update PMM relating to the new organization structure of the D.G. of Highways Ministry of Public Works, the new regulation, the implementation of NCB packages, as well as the experience of the project implementation until now.  It seemed that the Training on Application of the PMM would be possibly carried out the end of next month November or early December 2015.

6.3.2 Annual Training Program

 Iimplementing the RKPPL Training  The six th RKPPL Training was scheduled to be held in Sibolga early October 2015, for package 05 Sp. Rampa Poriaha and package 15 Sibolga Bts. Tapsel.  The training was carried out in two effective days, from 07 October 2015 through 08 October 2015, at the meeting room of PIA Puri Insan Asih Hotel, Jl. Padang-sidempuan Km.10-A, Pandan, Tapanuli Tengah, about 2 3 Km. from Sibolga.  This training program was mainly addressed to the Contractors staff and Supervision Consultants staff. Some DGH OfficialsStaff related to the packages were also included as the participants. Sixteen 16 prospective participants were invited from two 2 packages: Package 05 Contractor Consultant: 5 persons, Package 15 Contractor Consultant: 5 persons; OfficialStaff of Satker PJN II North Sumatera : 2 persons; OfficialStaff of PPK 12 North Sumatera: 3 persons; OfficialStaff of BBPJN I Medan : 1 person. However, not all prospective participants who were invited could attend the training. Only thirteen 13 participants really attended the training, from various groups as shown in the following table.