Monitoring Report of the LARAP Package No. 2
7. Monitoring Report of the LARAP Package No. 7
: Indrapura - Tapan Province : Sumatera Barat A. Previous Status : • LARAP documents approved by World Bank on October 14, 2014. • Implementation action plan of the LARAP was issued No Objection Letter NOL on March 17, 2015 by the World Bank. B. Pending Issues, Concern and Actions a Inventory of assets and measurements by Land Acquisition committee of the Local Government are completed. b Implementation cost of LARAP will be included by Local Government in the 2015 budget. C. Update during this reporting month of October 2015 a Inventory of affected assets and measurements by Land Acquisition Committee of Local Government are completed. Affected assets appraisal result has been completed. PPKSatker being done negotiation stage regarding compensation value.8. Monitoring Report of the LARAP Package No. 8
: Bts. Pariaman - Manggopoh Province : Sumatera Barat A. Previous Status : • LARAP documents submitted to World Bank on August 7, 2014. • LARAP documents approved by World Bank on August 12, 2014. B. Pending Issues, Concern and Actions a Inventory of assets and measurements by Land Acquisition committee of the Local Government are completed. b Implementation cost of LARAP to be paid from APBN Province 2015. C. Update during this reporting month of October 2015 a 839 of the 945 PAP in Kab. Agam has been paid. A monitoring report of the payment for 839 PAP will be submitted to WB middle Nov 2015. b Completion of inventory of affected assets are underway in Kab. Padang Pariaman.9. Monitoring Report of the LARAP Package No. 9
: Rantau Tijang Kota Agung Province : Lampung The sub-project is proposed to be deleted from the WINRIP Program.10. Monitoring Report of the LARAP Package No. 10
: Sp. Empat Sp. Air Balam Province : Sumatera BaratParts
» WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» World Bank Implementation Review Mission and Site Visit
» Package No.15 Sibolga Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package No.7 Indrapura - Tapan AWP-2
» Package No.8 Bts. Kota Pariaman - Manggopoh AWP-2
» Package No.12 Kambang - Indrapura AWP-2
» Procurement of the Last Four 4 Civil Works Contract Packages
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Project Development WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Project Objective WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» CTC Consultants WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» DSC Consultants WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Procurements WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Civil Works Progress WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 70.08 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 83.27 85.01 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» -43.88 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 79 CD WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 2.72 15.13 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 17.23 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 2.19 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 49.74 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Quality Assurance WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» External Monitoring Environmental and Social Considerations
» The Contractor Action Plan on Environmental Management and Monitoring RKPPL
» Environmental Quarterly Report Socialization of HIV-AIDs Campaign
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4 Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11 Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14 Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Road Safety Audit WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» Implementation Support Components WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
Show more