Technical Assistance for Capacity Building for Disaster Risks Reduction
4.3 Civil Works Implementation
All 4 contract packages under original implementation schedule AWP-1 are currently under construction by different contractors. Commencement of works for all the 4 packages commenced on the 2 nd week of January 2014. As of end of this reporting months October 2015, there are currently Ten 10 sub-projects that are under construction and one 1 civil works contract packages with signed Contract Agreements awaiting completion of LARAP implementation prior to issuance of Notice To Proceed NTP to commence construction works. Details of each contract package are shown in Table 4.1. Table 4.1 Program Contract Package Contractor Name of Road Province Contract Signed Commen cement of Work Contract Time Completion Date AWP-1 1 PT. Jaya Konstruksi Manggala Pratama Tbk Biha - Krui Lampung Nov 25, 2013 Jan 8, 2014 733 CD Jan 10, 2016 2 PT.Jaya Konstruksi Manggala Pratama Tbk Padang Sawah Sp. Empat including Air Gadang West Sumatera Dec 6, 2013 Jan 6, 2014 730 CD Jan 5, 2016 3 PT. Jaya Konstruksi Manggala Pratama Tbk Manggopoh Padang Sawah West Sumatera Dec 6, 2013 Jan 6, 2014 730 CD Jan 5, 2016 4 PT. Waskita Karya and PT. Mulya Turangga JO Ipuh - Bantal Bengkulu Nov 14, 2013 Jan 10, 2014 730 CD Jan 9, 2016 AWP-2 5 PT. Nusa Konstruksi Enjiniring Tbk. Sp. Rampa - Poriaha North Sumatera March 17, 2015 June 18, 2015 540 CD Dec 8, 2016 6 PT. Waskita Karya Persero Tbk. Ps. Pedati - Kerkap Bengkulu Feb 27, 2015 Mar 11, 2015 450 CD Jun 2, 2016 11 PT. Hutama KaryaPT. Daya Mulya J.O. Bantal Mukomuko Bengkulu Dec 18, 2014 Feb 23, 2015 720 CD Feb 11, 2017 13 PT. Waskita Karya Persero Tbk. Sp. Rukis TJ. Kemuning Bengkulu Dec 18, 2014 July 22, 2015 720 CD July 10, 2017 AWP-3 15 PT. Pembangunan Perumahan Persero Sibolga Bts. Tapsel North Sumatera July 13, 2015 Still to be issued 810CD Still to be determinedParts
» WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» World Bank Implementation Review Mission and Site Visit
» Package No.15 Sibolga Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package No.7 Indrapura - Tapan AWP-2
» Package No.8 Bts. Kota Pariaman - Manggopoh AWP-2
» Package No.12 Kambang - Indrapura AWP-2
» Procurement of the Last Four 4 Civil Works Contract Packages
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Project Development WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Project Objective WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» CTC Consultants WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» DSC Consultants WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Procurements WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Civil Works Progress WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 70.08 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 83.27 85.01 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» -43.88 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 79 CD WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 2.72 15.13 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 17.23 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 2.19 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 49.74 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Quality Assurance WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» External Monitoring Environmental and Social Considerations
» The Contractor Action Plan on Environmental Management and Monitoring RKPPL
» Environmental Quarterly Report Socialization of HIV-AIDs Campaign
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4 Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11 Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14 Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Road Safety Audit WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» Implementation Support Components WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
Show more