11. Monitoring Report of the LARAP Package No. 11
: Bantal - Mukomuko Province : Bengkulu A. Previous Status : • World Bank issued on May 30, 2014 a No Objection Letter NOL on the revised LARAP documents for implementation. • Monitoring Report No.1 and No.2 were issued No Objection Letters NOL from the World Bank. B. Pending Issues, Concern and Actions a Compensation payments for the remaining 123 PAP are on-going finalization. C. Update during this reporting month of October 2015 a 15 of the remaining 123 PAPs already received their compensation. A monitoring report will be submitted to WB on middle Nov 2015 b Payments to the 108 PAP Balance from 123 PAPs are under preparation.12. Monitoring Report of the LARAP Package No. 12
: Kambang - Indrapura Province : Sumatera Barat A. Previous Status : • LARAP documents approved by World Bank on October 14, 2014. • Signed Action Plan of LARAP was given No Objection Letter NOL by the World Bank. B. Pending Issues, Concern and Actions a Inventory of affected assets and measurement by Land Acquisition committee of the Local Government are completed. b Implementation cost of LARAP will be included in APBN 2015. C. Update during this reporting month of October 2015 a Appraisal of affected assets are on going.13. Monitoring Report of the LARAP Package No. 13
: Sp. Rukis Tj. Kemuning Province : BengkuluParts
» WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» World Bank Implementation Review Mission and Site Visit
» Package No.15 Sibolga Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package No.7 Indrapura - Tapan AWP-2
» Package No.8 Bts. Kota Pariaman - Manggopoh AWP-2
» Package No.12 Kambang - Indrapura AWP-2
» Procurement of the Last Four 4 Civil Works Contract Packages
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Project Development WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Project Objective WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» CTC Consultants WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» DSC Consultants WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Procurements WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Civil Works Progress WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 70.08 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 83.27 85.01 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» -43.88 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 79 CD WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 2.72 15.13 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 17.23 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 2.19 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 49.74 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Quality Assurance WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» External Monitoring Environmental and Social Considerations
» The Contractor Action Plan on Environmental Management and Monitoring RKPPL
» Environmental Quarterly Report Socialization of HIV-AIDs Campaign
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4 Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11 Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14 Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Road Safety Audit WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» Implementation Support Components WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION