Detailed Design Preparation WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290

Western I ndonesia National Roads I mprovement Project 4 - 3 Program Contract Package Contractor Name of Road Province Contract Signed Commen cement of Work Contract Time Completion Date 17 PT. Jaya Konstruksi Manggala Pratama Tbk Sp. Gunung Kemala Pugung Tampak Lampung Nov 17, 2014 Sept 4, 2015 720 CD Aug 23, 2017 19 PT. Roda Tekindo Purajaya Bintunan - Lais Bengkulu Feb 27, 2015 Mar 11, 2015 300CD Jan 4, 2016 Including 93 calendar day time extension subject to DGH approval. Revised completion date due to granting of time extension subject to DGH approval.

4.4 Civil Works Progress

To date, ten 10 sub-project are currently on-going construction implementation by different Contractors. Four 4 contracts are under AWP-1, four 4 are in AWP-2 and two 2 is covered by AWP-3. Activities done during this month were repair and restoration of deteriorated existing pavements, roadway excavation, embankment formation, spreading of granular pavement for roadway widening, asphalt paving, structural works, construction of stone masonry side ditches, stockpiling of raw material, production of crush aggregates, other minor works, bridge construction and mobilization of the newly started contract package. Progress status of the ten 10 on-going civil work contracts as of this reporting period are shown in Table 4.2. Table 4.2 Program Contract Package Contractor Name of Road Target Progress Schedule Ending October 2015 Actual Progress Accomplished Slippage Time Elapsed Remaining Time AWP-1 1 PT. Jaya Konstruksi Manggala Pratama Tbk Biha - Krui

88.43 70.08

-18.34 89.48 77 CD 2 PT. Jaya Konstruksi Manggala Pratama Tbk Padang Sawah Sp.Empat incl.Air Gadang

91.35 83.27

-8.08 90.12 72 CD 3 PT. Jaya Konstruksi Manggala Pratama Tbk Manggopoh Padang Sawah

95.17 85.01

-10.16 90.12 72 CD 4 PT. Waskita Karya and PT. Mulya Turangga JO Ipuh - Bantal 97.05

53.17 -43.88

89.16 79 CD

AWP-2 5 PT. Nusa Konstruksi Enjiniring Sp. Rampa - Poriaha

15.14 2.72

-12.43 23.93 410 CD 6 PT. Waskita Karya Tbk Ps. Pedati - Kerkap

25.82 15.13

-10.69 50.78 221 CD 11 PT. Hutama Karya PT. DMT Mukomuko - Bantal

20.01 17.23

-2.78 33.94 475 CD 13 PT. Waskita Karya Persero Tbk Sp. Rukis Tj. Kemuning

4.17 2.19

-1.98 13.21 624 CD AWP-3 17 PT. Jaya Konstruksi Manggala Pratama Tbk Sp. Gn Kemala Pg. Tampak

0.70 1.13

+0.43 7.09 668 CD 19 PT. Rodatekindo Purajaya Lais - Bintunan

58.19 49.74

-8.45 76.25 71 CD Regarding to the Revised Schedule due to the approval of this extension.