Western I ndonesia National Roads I mprovement Project 4 - 3
Program Contract
Package Contractor
Name of Road Province
Contract Signed
Commen cement
of Work Contract
Time Completion
Date
17 PT. Jaya Konstruksi
Manggala Pratama Tbk
Sp. Gunung Kemala
Pugung Tampak
Lampung Nov 17,
2014 Sept 4,
2015 720 CD
Aug 23, 2017
19 PT. Roda Tekindo
Purajaya Bintunan - Lais
Bengkulu Feb 27,
2015 Mar 11,
2015 300CD
Jan 4, 2016
Including 93 calendar day time extension subject to DGH approval. Revised completion date due to granting of time extension subject to DGH approval.
4.4 Civil Works Progress
To date, ten 10 sub-project are currently on-going construction implementation by different Contractors. Four 4 contracts are under AWP-1, four 4 are in AWP-2 and two 2 is covered by
AWP-3. Activities done during this month were repair and restoration of deteriorated existing pavements, roadway excavation, embankment formation, spreading of granular pavement for
roadway widening, asphalt paving, structural works, construction of stone masonry side ditches, stockpiling of raw material, production of crush aggregates, other minor works, bridge
construction and mobilization of the newly started contract package. Progress status of the ten
10 on-going civil work contracts as of this reporting period are shown in Table 4.2. Table 4.2
Program Contract
Package Contractor
Name of Road
Target Progress Schedule Ending
October 2015 Actual Progress
Accomplished Slippage
Time Elapsed
Remaining Time
AWP-1 1
PT. Jaya Konstruksi Manggala Pratama
Tbk Biha - Krui
88.43 70.08
-18.34 89.48
77 CD
2 PT. Jaya Konstruksi
Manggala Pratama Tbk
Padang Sawah
Sp.Empat incl.Air
Gadang
91.35 83.27
-8.08 90.12
72 CD
3 PT. Jaya Konstruksi
Manggala Pratama Tbk
Manggopoh Padang
Sawah
95.17 85.01
-10.16 90.12
72 CD
4 PT. Waskita Karya
and PT. Mulya Turangga JO
Ipuh - Bantal 97.05
53.17 -43.88
89.16 79 CD
AWP-2 5
PT. Nusa Konstruksi Enjiniring
Sp. Rampa - Poriaha
15.14 2.72
-12.43 23.93
410 CD
6 PT. Waskita Karya
Tbk Ps. Pedati -
Kerkap
25.82 15.13
-10.69 50.78
221 CD
11 PT. Hutama Karya
PT. DMT Mukomuko -
Bantal
20.01 17.23
-2.78 33.94
475 CD
13 PT. Waskita Karya
Persero Tbk Sp. Rukis
Tj. Kemuning
4.17 2.19
-1.98 13.21
624 CD AWP-3
17 PT. Jaya Konstruksi
Manggala Pratama Tbk
Sp. Gn Kemala
Pg. Tampak
0.70 1.13
+0.43 7.09
668 CD
19 PT. Rodatekindo
Purajaya Lais -
Bintunan
58.19 49.74
-8.45 76.25
71 CD
Regarding to the Revised Schedule due to the approval of this extension.