Monitoring Report of the LARAP Package No. 11 Monitoring Report of the LARAP Package No. 12
16. Monitoring Report of the LARAP Package No.16
: Seblat - Ipuh Province : Bengkulu A. Previous Status : • World Bank issued on May 30, 2014 a No Objection Letter NOL on the revised LARAP documents for implementation. • World Bank issued No Objection Letter NOL on Monitoring Report No.1 for LARAP implementation. B. Pending Issues, Concern and Actions a LARAP documents for this Package covers only land acquisition for the road link. If there are land acquisition for the bridge site, a separate LARAP documents need to be prepared. b LARAP Implementation is underway for the remaining 311 PAP be allocated 2015 national budget and schedule to be settled on August 2015. C. Update during this reporting month of October 2015 a 102 PAPs has been paid awaiting payment data from SATKER to be submitted to PMU.17. Monitoring Report of the LARAP Package No.17
: Sp. Gunung Kemala Pg. Tampak Province : Lampung A. Previous Status : • World Bank approved the corrected LARAP documents on November 12, 2013 B. Pending Issues, Concern and Actions a Monitoring Report for the compensation payments for the 154 PAPs has to be submitted to World Bank. C. Update during this reporting month of October 2015 a Compensation payments for 965 PAP from total 2,273 have been already released. Payments of the other PAP s are on-going. b Monitoring Report for the compensation payments for the 154 PAPs already submitted to WBWorld Bank c Monitoring Report for the compensation payments for the 811 PAPs will be submitted to WB on mid Nov 201518. Monitoring Report of the LARAP Package No.18
: Mukomuko Bts. Sumbar Province : Bengkulu The sub-project is proposed to be deleted from the WINRIP Program.19. Monitoring Report of the LARAP Package No.19
: Lais - Bintunan Province : Bengkulu A. Previous Status :Parts
» WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» World Bank Implementation Review Mission and Site Visit
» Package No.15 Sibolga Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package No.7 Indrapura - Tapan AWP-2
» Package No.8 Bts. Kota Pariaman - Manggopoh AWP-2
» Package No.12 Kambang - Indrapura AWP-2
» Procurement of the Last Four 4 Civil Works Contract Packages
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Project Development WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Project Objective WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» CTC Consultants WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» DSC Consultants WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Procurements WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Civil Works Progress WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 70.08 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 83.27 85.01 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» -43.88 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 79 CD WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 2.72 15.13 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 17.23 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 2.19 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 49.74 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Quality Assurance WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» External Monitoring Environmental and Social Considerations
» The Contractor Action Plan on Environmental Management and Monitoring RKPPL
» Environmental Quarterly Report Socialization of HIV-AIDs Campaign
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4 Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11 Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14 Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Road Safety Audit WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» Implementation Support Components WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
Show more