External Monitoring Environmental and Social Considerations
2. Monitoring Report of the LARAP Package No. 2
: Padang Sawah Sp. Empat Province : Sumatera Barat A. Previous Status : • LARAP documents approved by World Bank on January 13, 2013 • Monitoring Report No.1 revised approved by World Bank on July 19, 2013 • Additional LARAP Implementation documents approved by World Bank on July 21, 2014 • Monitoring Report No.2 approved by World Bank on Feb. 12, 2015 B. Pending Issues, Concern and Actions a Compensation for 24 PAP along the road link is in appraisal stage proceedings by Independent Appraisal. b Price negotiation between the Land Acquisition Committee and the remaining 3 PAP along Air Gadang Bridge is still to be finalized. C. Update during this reporting month of October 2015 a On-going construction b Two 2 PAPs be canceled because not become affected. One 1 PAP will be paid Dec 20153. Monitoring Report of the LARAP Package No. 3
: Manggopoh Padang Sawah Province : Sumatera Barat A. Previous Status : • LARAP documents approved by World Bank on January 4, 2013 • Monitoring Reports No.1, 2, 3, 4 and 5 already approved and World Bank issued No Objection Letter NOL. B. Pending Issues, Concerns and Actions a The remaining 1 PAP already compensated by Local Government. Monitoring Report still to be finalized for submission. C. Update during this reporting month of October 2015 a Monitoring Report for the remaining 1 PAP is under preparation by CTC. b WB request the Additional LARAP for Embankment Segment, and CTC should be provide it as soon.Parts
» WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» World Bank Implementation Review Mission and Site Visit
» Package No.15 Sibolga Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package No.7 Indrapura - Tapan AWP-2
» Package No.8 Bts. Kota Pariaman - Manggopoh AWP-2
» Package No.12 Kambang - Indrapura AWP-2
» Procurement of the Last Four 4 Civil Works Contract Packages
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Project Development WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Project Objective WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» CTC Consultants WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» DSC Consultants WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Procurements WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Civil Works Progress WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 70.08 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 83.27 85.01 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» -43.88 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 79 CD WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 2.72 15.13 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 17.23 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 2.19 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» 49.74 WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Quality Assurance WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» External Monitoring Environmental and Social Considerations
» The Contractor Action Plan on Environmental Management and Monitoring RKPPL
» Environmental Quarterly Report Socialization of HIV-AIDs Campaign
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4 Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11 Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14 Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Road Safety Audit WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» Implementation Support Components WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
Show more