Lampiran 5123 Schedule CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM 30 SEPTEMBER 2014, 31 DESEMBER 2013 DAN 30 SEPTEMBER 2013 Dinyatakan dalam ribuan Dolar AS, kecuali dinyatakan lain NOTES TO THE INTERIM CONSOLIDATED FINANCIAL STATEMENTS 30 SEPTEMBER 2014, 31 DECEMBER 2013 AND 30 SEPTEMBER 2013 Expressed in thousands of US Dollars, unless otherwise stated

40. PERJANJIAN

PENTING, IKATAN, DAN KONTINJENSI lanjutan

40. SIGNIFICANT AGREEMENTS, COMMITMENTS

AND CONTINGENCIES continued p. Peraturan Menteri No. 272013 lanjutan p. Ministerial Regulation No. 272013 continued Grup terus memonitor penerapan peraturan ini dan akan memastikan memenuhi peraturan bila diharuskan. The Group is closely monitoring the adoption of this regulation and will ensure to comply with the regulation when needed.

q. Perjanjian sehubungan

dengan overburden crushing dan conveying system

q. Contract in relation to the overburden crushing and conveying system

Untuk menunjang peningkatan kapasitas produksi batubaranya, Adaro mengembangkan overburden crushing and conveying system “sistem”. Pada tanggal 25 Maret 2011, Adaro dan FLSmidth Spokane, Inc saat ini dikenal sebagai FLSmidth USA Inc. “FLS” mengadakan perjanjian sehubungan dengan penyediaan peralatan dan jasa offshore untuk overburden crushing and conveying system dengan nilai kontrak sebesar AS92.003, kontrak mana selanjutnya dinovasikan oleh Adaro kepada JPI pada tanggal 10 November 2012, seperti yang diubah dan dinovasi “Kontrak FLS”. For the support of Adaro increasing coal production capacity, an overburden crushing and conveying system is developed “system”. On 25 March 2011, Adaro and FLSmidth Spokane, Inc subsequently known as FLSmitdth USA Inc. “FLS” entered into a contract in relation to the overburden crushing and conveying system equipment supply and offshore services with a total contract amount of US92,003, which contract was subsequently novated by Adaro to JPI on 10 November 2011, as amended and novated “FLS Contract”. Pada tanggal 25 Maret 2011, Adaro dan PT Wijaya Karya Persero Tbk “WIKA” mengadakan perjanjian konstruksi sehubungan dengan overburden crushing dan conveying system dengan nilai kontrak sebesar AS83.870, yang selanjutnya dinovasikan oleh Adaro kepada JPI pada tanggal 10 November 2012, seperti yang diubah dan dinovasi “Kontrak WIKA”. On 25 March 2011, Adaro and PT Wijaya Karya Persero Tbk “WIKA” entered into a construction contract in relation to the overburden crushing and conveying system with a total contract amount of US83,870, which contract was subsequently novated by Adaro to JPI on 10 November 2011, as amended and novated “WIKA Contract”. Sehubungan dengan Kontrak FLS dan Kontrak WIKA, Adaro, FLS dan WIKA juga menandatangani beberapa dokumen lainnya. In relation to the FLS Contract and WIKA Contract, Adaro, FLS and WIKA also entered into other documents. Pada tanggal 30 September 2014, Sistem ini dalam tahap pengujian untuk prosedur tertentu. As at 30 September 2014, The System is at the stage of undergoing certain testing procedures.