Peraturan Menteri No. 272013 Ministerial Regulation No. 272013

Lampiran 5125 Schedule CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM 30 SEPTEMBER 2014, 31 DESEMBER 2013 DAN 30 SEPTEMBER 2013 Dinyatakan dalam ribuan Dolar AS, kecuali dinyatakan lain NOTES TO THE INTERIM CONSOLIDATED FINANCIAL STATEMENTS 30 SEPTEMBER 2014, 31 DECEMBER 2013 AND 30 SEPTEMBER 2013 Expressed in thousands of US Dollars, unless otherwise stated

40. PERJANJIAN

PENTING, IKATAN, DAN KONTINJENSI lanjutan

40. SIGNIFICANT AGREEMENTS, COMMITMENTS

AND CONTINGENCIES continued s. Perjanjian Jual Beli Listrik Jangka Panjang untuk Proyek Pembangkit Listrik Bertenaga Batubara Swasta di Kalimantan Selatan

s. Long-term Power Purchase Agreement for the

South Kalimantan Coal-Fired Independent Power Producer Project “IPP” Grup, bersama-sama dengan Korea East- West Power Co, Ltd, membentuk konsorsium dengan partisipasi kepemilikan masing- masing sebesar 65 dan 35. Pada tanggal 12 Agustus 2013, konsorsium mendirikan PT Tanjung Power Indonesia “TPI” untuk membangun, memiliki dan mengoperasikan pembangkit listrik bertenaga batubara. The Group, together with Korea East-West Power Co, Ltd, formed a consortium with participation interests of 65 and 35 respectively. On 12 August 2013, the Consortium established PT Tanjung Power Indonesia “TPI” to build, own and operate a coal-fired power plant. Pada tanggal 15 Oktober 2014, TPI dan PLN menandatangani Perjanjian Jual Beli Listrik “PJBL” jangka panjang. PJBL ini mencakup pembangunan pembangkit listrik bertenaga batubara berkapasitas 2x100 MW di Provinsi Kalimantan Selatan South Kalimantan Power Plant “SKPP” dan penyediaan listrik ke PLN selama 25 tahun. Proyek SKPP akan ditransfer ke PLN pada saat PJBL berakhir. Proyek ini termasuk dalam Proyek Fast Track Program tahap 2 FTP-2 dengan skema BOOT Build, Own, Operate Transfer yang memperoleh fasilitas penjaminan Pemerintah dalam bentuk Surat Jaminan Kelayakan Usaha “SJKU”. Saat ini proyek masih dalam tahap awal pelaksanaan. On 15 October 2014, TPI and PLN signed a long-term Power Purchase Agreement “PPA”. The PPA includes the construction of a coal-fired power plant with a total capacity of 2x100 MW in the Province of South Kalimantan South Kalimantan Power Plant“SKPP” and a 25-year supply of electricity to PLN. Upon expiration of the PPA term, the SKPP project will be transferred to PLN. This project is included in the Fast Track Program Project phase 2 FTP-2, with the BOOT Build, Own, Operate Transfer scheme, and benefits from a government guarantee in the form of a Business Viability Guarantee Letter “SJKU”. The project is currently at the initial implementation stage.

t. Perjanjian Guaranteed Bridge Facility AS270.000

t. US270,000 Guaranteed Bridge Facility Agreement

Pada tanggal 3 Agustus 2012, BPI, entitas asosiasi, mengadakan Perjanjian AS270.000 Guaranteed Bridge Facility dengan beberapa institusi keuangan. AS270.000 Guaranteed Bridge Facility akan jatuh tempo pada 364 hari setelah tanggal perjanjian ini. Perjanjian ini telah mengalami perubahan untuk memperpanjang jatuh tempo perjanjian menjadi tanggal 4 November 2014. Perusahaan menjadi penjamin untuk komitmen sebesar AS91.800, yang merupakan 34 dari total fasilitas. On 3 August 2012, BPI, an associate company, entered into a US270,000 Guaranteed Bridge Facility Agreement with various financial institutions. The US270,000 Guaranteed Bridge Facility was to expire 364 days after the date of this agreement. This agreement has been amended to extend the maturity of this agreement to 4 November 2014. The Company acts as the guarantor for the commitment of US91,800, which is equal to 34 of the total facility. Pada tanggal 30 September 2014, BPI telah melakukan penarikan sebesar AS195.000 atas fasilitas ini. As at 30 September 2014, BPI has made drawdowns totaling US195,000 from this facility. Lampiran 5126 Schedule CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM 30 SEPTEMBER 2014, 31 DESEMBER 2013 DAN 30 SEPTEMBER 2013 Dinyatakan dalam ribuan Dolar AS, kecuali dinyatakan lain NOTES TO THE INTERIM CONSOLIDATED FINANCIAL STATEMENTS 30 SEPTEMBER 2014, 31 DECEMBER 2013 AND 30 SEPTEMBER 2013 Expressed in thousands of US Dollars, unless otherwise stated

40. PERJANJIAN