Monitoring Report of the LARAP Package No. 11
17. Monitoring Report of the LARAP Package No.17
: Sp. Gunung Kemala Pg. Tampak Province : Lampung A. Previous Status : • World Bank approved the corrected LARAP documents on November 12, 2013 • Monitoring report for 154 of the total 2.273 PAPs was given No Objection Letter NOL on October 13, 2015. • Monitoring report for 735 of the remaining 2.119 PAPs was given No Objection Letter NOL on November 26, 2015 B. Pending Issues, Concern and Actions a Monitoring Report for the compensation payments for the remaining 1.384 PAPs has to be submitted to World Bank. C. Update during this reporting month of February 2016 a Compensation payments for the remaining 1.384 from 2.273 PAP have been already released. b PMUCTC waiting data of payment progress for the remaining of 1.384 PAPs from Satker PJN II Lampung.18. Monitoring Report of the LARAP Package No.18
: Mukomuko Bts. Sumbar Province : Bengkulu Cancelled from the WINRIP Program.19. Monitoring Report of the LARAP Package No.19
: Lais - Bintunan Province : Bengkulu A. Previous Status : • World Bank issued on May 30, 2014 No Objection Letter NOL on the revised LARAP documents for implementation • World Bank issued No Objection Letter NOL on Monitoring Report No.1 for the LARAP implementation. • Monitoring report for 208 of the remaining 290 PAPs was given No Objection Letter NOL on November 26, 2015.Parts
» WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» mil 20.06 WINRIP ACTUAL PROGRESS UP TO FEBRUARY 2016 AND FORECAST UP TO DECEMBER 2017
» World Bank Implementation Review Mission and Site Visit
» Package No.8 Bts. Kota Pariaman - Manggopoh AWP-2
» Package No.14 Painan - Kambang AWP-3
» Package No.20 Lubuk Alung - Sicincin AWP-3
» Package No.21 Lubuk Alung - Kuraitaji AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Background WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Project Development WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Project Objective WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» CTC Consultants WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» DSC Consultants WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Procurements WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Civil Works Progress WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 95.73 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 99.13 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 84.64 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» -38.70 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 287 CD WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» -49.11 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 98 CD WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 14.37 -1.76 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 712 CD WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 4.11 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 77.34 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Quality Assurance WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Socialization of HIV-AIDs Campaign Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5 Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Road Safety Audit WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION