Monitoring Report of the LARAP Package No. 8
14. Monitoring Report of the LARAP Package No. 14
: Painan - Kambang Province : Sumatera Barat A. Previous Status : • World Bank issued on December 19, 2014 the No Objection Letter to the LARAP documents. • LARAP s signed action plan was given No Objection Letter NOL by World Bank. B. Pending Issues, Concern and Actions a Process of compensation payment is on-going. C. Update during this reporting month of February 2016 a Compensation payment process preparation.15. Monitoring Report of the LARAP Package No. 15
: Sibolga Bts. Tapsel Province : Sumatera Utara A. Previous Status : • World Bank approved the LARAP documents on February 6, 2014 for implementation in acquiring Road Right of Ways and removal of obstruction. • Monitoring report No.1 for 40 of the remaining 1.554 PAPs was given No Objection Letter NOL on November 16, 2015. • Monitoring Report No.2 for payment of remaining 72 PAPs already submitted to Wolrd Bank. B. Pending Issues, Concern and Actions a Due limited to limited suppy of map fields as one of the documents needed for find disbursement by Treasury Office affect the progress of payments release. C. Update during this reporting month of February 2016 a Compensation payment for the remaining PAPs is under process. b Monitoring Report-3 for the compensation payment for 236 from the remaining 1.439 PAPs already be submitted to WB on February 19, 2016.16. Monitoring Report of the LARAP Package No.16
: Seblat - Ipuh Province : Bengkulu A. Previous Status : • World Bank issued on May 30, 2014 a No Objection Letter NOL on the revised LARAP documents for implementation. • World Bank issued No Objection Letter NOL on Monitoring Report No.1 and 2 for LARAP implementation. • Monitoring report for 102 of the remaining 120 PAPs was given No Objection Letter NOL on November 26, 2015. • All of the total 259 PAPs already paid by Satker PJN I Bengkulu B. Pending Issues, Concern and ActionsParts
» WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» mil 20.06 WINRIP ACTUAL PROGRESS UP TO FEBRUARY 2016 AND FORECAST UP TO DECEMBER 2017
» World Bank Implementation Review Mission and Site Visit
» Package No.8 Bts. Kota Pariaman - Manggopoh AWP-2
» Package No.14 Painan - Kambang AWP-3
» Package No.20 Lubuk Alung - Sicincin AWP-3
» Package No.21 Lubuk Alung - Kuraitaji AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Background WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Project Development WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Project Objective WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» CTC Consultants WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» DSC Consultants WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Procurements WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Civil Works Progress WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 95.73 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 99.13 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 84.64 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» -38.70 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 287 CD WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» -49.11 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 98 CD WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 14.37 -1.76 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 712 CD WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 4.11 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» 77.34 WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Quality Assurance WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Socialization of HIV-AIDs Campaign Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5 Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Road Safety Audit WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION