Pemutakhiran Data Model dan Pemutakhiran Data
OUTLOOK ENERGI INDONESIA 2013
•
•
•
•
•
• Pengembangan kelistrikan nasional berdasarkan
berdasarkan Statistik PLN 2011, RUPTL PT PLN Persero 2012-2021, Draft Rencana Umum
Ketenagalistrikan Nasional Draft RUKN 2012-2031 dari Kementerian ESDM, Blueprint Pengembangan
EBT dan Konservasi Energi 2010 serta Perkembangan Energi Terbarukan 2005-2010 dari Ditjen EBTKE,
Kementerian ESDM tahun 2011. Kebijakan batubara berdasarkan kebijakan untuk
membangun ketahanan dan kemandirian energi dari Ditjen Minerba, Kementerian ESDM tahun 2012.
Kapasitas dan produksi kilang minyak Dumai-SP, Musi, Cilacap, Balongan, Balikpapan dan Kasim
diperoleh dari hasil kunjungan ke Pertamina bulan April 2012.
Rencana pengembangan kilang minyak baru di Jawa Barat dan Jawa Timur berdasarkan data Pertamina
tahun 2011. Kapasitas dan produksi LPG yang berasal dari kilang
minyak diperoleh dari Kepmen ESDM No. 1566 Tahun 2008 serta hasil kunjungan ke Pertamina bulan April
2012. Kapasitas dan produksi LPG yang berasal dari kilang
gas diperoleh dari Dirjen Migas tahun 2009 dan dari publikasi infrastruktur gas bumi dari Kementerian
ESDM tahun 2011. •
•
•
•
•
• Development of national electricity is based on PLN
Statistics 2010, RUPTL PT PLN Persero 2012-2021, Draft of National Electricity General Plan Draft
RUKN 2012-2031 by MEMR, Blueprint Development of NRE and Energy Conservation 2010, and also from
Renewable Energy Development 2005-2010 from Directorate General of New and Renewable Energy
and Energy Conversion, MEMR in 2011. Coal policy is based on policy of Directorate General of
Mineral and Coal, MEMR on 2012 regarding security and independence of energy.
Capacity and production of oil refineries such as Dumai-SP Musi, Cilacap, Balongan, Balikpapan and
Kasim are obtained from Pertamina on April 2012.
Plan for the new oil refineries development in West Java and East Java are based on data from Pertamina
in 2011. Capacity and production of LPG from oil refineries are
obtained from the Decree of Ministry of EMR No. 1566 of 2008 and from Pertamina on April 2012.
Capacity and production of LPG from gas refineries are obtained from the Directorate General of Oil and
Gas in 2009 and from the publication of natural gas infrastructure, MEMR in 2011.