Uji Kecukupan Data Pengolahan Data

Tabel 5.9. Rekapitulasi Uji Keseragaman Data Waktu Siklus Proses Produksi Roda Lorry Elemen Kegiatan Rata-rata Deviasi BKA BKB Keterangan 1 286,30 15,61 317,527 255,073 Seragam 2 281,50 14,77 311,033 251,967 Seragam 3 556,00 19,42 594,839 517,161 Seragam 4 475,60 22,31 520,214 430,986 Seragam 5 173,90 3,98 181,869 165,931 Seragam 6 155,70 4,35 164,395 147,005 Seragam 7 282,90 6,51 295,911 269,889 Seragam 8 600,60 0,84 602,287 598,913 Seragam 9 373,80 6,18 386,158 361,442 Seragam 10 344,50 1,27 347,039 341,961 Seragam 11 154,80 7,97 170,739 138,861 Seragam 12 2100,20 0,42 2101,043 2099,357 Seragam 13 213,00 1,25 215,494 210,506 Seragam 14 355,10 7,67 370,432 339,768 Seragam 15 720,00 19,42 758,839 681,161 Seragam 16 481,10 1,10 483,301 478,899 Seragam 17 658,30 32,03 722,363 594,237 Seragam 18 510,90 1,97 514,838 506,962 Seragam 19 442,00 22,55 487,097 396,903 Seragam 20 377,00 3,80 384,601 369,399 Seragam 21 246,60 11,14 268,875 224,325 Seragam 22 62,10 2,92 67,946 56,254 Seragam Sumber: Pengolahan Data

5.2.2. Uji Kecukupan Data

Uji kecukupan dilakukan untuk mengetahui apakah data waktu siklus yang telah diambil sudah memenuhi syarat ketelitian yang ditetapkan. Pada penelitian ini digunakan tingkat keyakinan 95, dan tingkat ketelitian 5 . Uji kecukupan ini dapat dihitung dengan menggunakan formula sebagai berikut: N = z s N ∑ x 2 - ∑ x 2 ∑ x 2 dimana : x = data ke-i dari N sampel x k = nilai absis pada tabel distribusi normal untuk luasan sebaran tingkat kepercayaan Universitas Sumatera Utara s = tingkat ketelitian yang digunakan sebesar 5 N = jumlah data yang aktual untuk sampel tersebut N’ = jumlah data yang seharusnya Data dinyatakan cukup jika nilai N N’ berdasarkan hasil perhitungan. Namun sebaliknya, jika N N’ maka harus menambah jumlah data sebagai sampel. Sebagai contoh perhitungan uji kecukupan data, maka diambil waktu pembuatan drag atas yaitu sebagai berikut: ′ = −∑ − −∑ −∑ ′ = +,+- 10−821.871− −8.196.769 −2.863 ′ = 4,28 Rekapitulasi perhitungan uji kecukupan data untuk seluruh elemen kegiatan ditunjukkan pada Tabel 5.10. Tabel 5.10. Rekapitulasi Perhitungan Uji Kecukupan Data Elemen Kegiatan ΣX ΣX² ΣX 2 N N Keterangan 1 2.863 821.871 8.196.769 10 4,28 Cukup 2 2.815 794.385 7.924.225 10 3,96 Cukup 3 5.560 3.094.754 30.913.600 10 1,76 Cukup 4 4.756 2.266.432 22.619.536 10 3,17 Cukup 5 1.739 302.555 3.024.121 10 0,76 Cukup 6 1.557 242.595 2.424.249 10 1,12 Cukup 7 2.829 800.705 8.003.241 10 0,76 Cukup 8 6.006 3.607.210 36.072.036 10 0,00 Cukup Universitas Sumatera Utara Tabel 5.10. Rekapitulasi Perhitungan Uji Kecukupan Data Lanjutan Elemen Kegiatan ΣX ΣX² ΣX2 N N Keterangan 9 3.738 1.397.608 13.972.644 10 0,39 Cukup 10 3.445 1.186.817 11.868.025 10 0,02 Cukup 11 1.548 240.202 2.396.304 10 3,82 Cukup 12 21.002 44.108.402 441.084.004 10 0,00 Cukup 13 2.130 453.704 4.536.900 10 0,05 Cukup 14 3.551 1.261.489 12.609.601 10 0,67 Cukup 15 7.200 5.187.394 51.840.000 10 1,05 Cukup 16 4.811 2.314.583 23.145.721 10 0,01 Cukup 17 6.583 4.342.823 43.335.889 10 3,41 Cukup 18 5.109 2.610.223 26.101.881 10 0,02 Cukup 19 4.420 1.958.216 19.536.400 10 3,75 Cukup 20 3.770 1.421.420 14.212.900 10 0,15 Cukup 21 2.466 609.232 6.081.156 10 2,94 Cukup 22 621 38.641 385.641 10 3,19 Cukup Sumber: Pengolahan Data Setelah dilakukan kedua uji diatas, maka data pendahuluan dapat digunakan dalam perhitungan selanjutnya. Waktu siklus pembuatan roda lorry ditunjukkan pada Tabel 5.11. Tabel 5.11. Rata-rata Waktu Siklus Proses Produksi Roda Lorry No. Elemen Kegiatan Waktu Siklus Detik 1 Pembuatan drag atas 286,30 2 Pembuatan mal atas roda lorry 281,50 3 Pembuatan drag bawah 556,00 4 Pembuatan mal bawah roda lorry 475,60 5 Penyatuan drag atas dengan mal atas 173,90 6 Penyatuan drag bawah dengan mal bawah 155,70 7 Penyatuan drag atas dan drag bawah menjadi drag roda lorry 282,90 8 Pengeringan pasir 600,60 9 Pengayakan pasir 373,80 10 Penuangan pasir ke dalam drag 344,50 11 Pengerasan cetakan pasir 154,80 12 Peleburan besi-besi tua 2100,20 Universitas Sumatera Utara Tabel 5.11. Rata-rata Waktu Siklus Proses Produksi Roda Lorry Lanjutan No. Elemen Kegiatan Waktu Siklus Detik 13 Penuangan baja ke dalam ladle 213,00 14 Penuangan leburan baja dari ladle ke dalam cetakan pasir 355,10 15 Pengeringan hasil leburan 720,00 16 Pembersihan pasir 481,10 17 Penghalusan roda lorry 658,30 18 Pengujian heat treatment 510,90 19 Proses pelubangan roda lorry 442,00 20 Pembubutan roda lorry 377,00 21 Pengecatan roda lorry 246,60 22 Packaging 62,10 Sumber: Pengolahan Data

5.2.3. Perhitungan Waktu Normal dan Waktu Standar