3.2.2. Pada Kristalizer K-01
Tabel 3.10. Neraca Panas Pada kristalizer K-01
Panas Masuk kJjam Panas Keluar kJjam
Komponen Q
in
Komponen =n.Cp.dT
Q
out
=n.Cp.dT
A 286.196,82
A 44.030,28
B 803.361,16
B 19.875,63
C 28.289,87
C 4.352,28
D 2.826,76
D 434,88
E 1.356,10
E 208,63
F 39.962,22
F 1.083,04
Air Pendingin -981.433,19
B 103.670,03
- -
F 6.904,97
TOTAL 180.559,74
TOTAL 180.559,74
3.2.3. Pada Separator S-01
Tabel 3.11. Neraca Panas Pada separator S-01
Panas Masuk kJjam Panas Keluar kJjam
Komponen Q
in
Komponen =n.Cp.dT
Q
out
=n.Cp.dT
A 44.030,28
A 88.060,56
B 19.875,63
C 8.704,57
C 4.352,28
D 869,77
D 434,88
E 417,26
E 208,63
B 39.751,26
F 1.083,04
F 13.040,77
F 27.164,58
- -
Air Panas 53.694,87
- -
TOTAL 150.844,19
TOTAL 150.844,19
Universitas Sumatera Utara
3.2.4. Pada Heat Exchanger E-02
Tabel 3.12. Neraca Panas Pada heat exchanger E-02
Panas Masuk kJjam Panas Keluar kJjam
Komponen Q
in
Komponen =n.Cp.dT
Q
out
=n.Cp.dT
A 88.060,56
A 1.541.059,8
C 8.704,57
D 152.330,08
D 869,77
E 15.221,05
E 417,26
B 7.302,12
Steam 1.617.860,89
- -
TOTAL 1.715.913,05
TOTAL 1.715.913,05
3.2.5. Pada Bleacher H-02
Tabel 3.13. Neraca Panas Pada bleacher H-02
Panas Masuk kJjam Panas Keluar kJjam
Komponen Q
in
Komponen =n.Cp.dT
Q
out
=n.Cp.dT
A 1541.059,8
A 1.981.362.6
C 152.330,08
C 195.852.96
D 14.062,35
D 13.719.26
E 7.302,12
E 9.388.44
G 92,03
G 118.33
H 14,14
H 18.18
I 4.939,72
I 6.351.07
J 38,41
J 49.39
K 16,43
K 21.13
L 15,84
L 20.37
Steam 491.581,32
D 4.550.51
TOTAL 2.211.452.24
TOTAL 2.211.452.24
Universitas Sumatera Utara
3.2.6. Pada Dearator H-03
Tabel 3.14. Neraca Panas Pada dearator H-03
Panas Masuk kJjam Panas Keluar kJjam
Komponen Q
in
Komponen =n.Cp.dT
Q
out
=n.Cp.dT
A 1.981.362,6
A 2.201.514
C 195.852,96
C 217.614,41
D 13.719,26
D 15.108,19
E 1.064,02
E 1.182,24
L 20,37
L 22,90
Steam 243.550,16
D 127,90
TOTAL 2.435.569,37
TOTAL 2.435.569,37
3.2.7. Pada Neutralized Deodorizer Refining H-04
Tabel 3.15. Neraca Panas Pada neutralized deodorizer refining H-04
Panas Masuk kJjam Panas Keluar kJjam
Komponen Q
in
Komponen =n.Cp.dT
Q
out
=n.Cp.dT
A 2.201.514
A 5.613.860,7
C 217.614,41
C 8.761,84
D 15.108,19
D 11.722,76
E 1.182,24
E 2.660,05
Steam 3.775.797,87
C 547.230,91
- -
D 26.803,12
- -
E 177,33
TOTAL 6.211.216,71
TOTAL 6.211.216,71
Universitas Sumatera Utara
3.2.8. Pada Heat Exchanger E-03