Menentukan tarif per unit
Biaya Komunikasi
970.000 575.663,10
197.168 197.168
Biaya Langsung
Bahan Baku 126.118.000
84.375.000 12.844.000
28.899.000 Biaya tenaga
kerja langsung 169.600.000
100.652.022,54 34.473.989
34.473.989 Biaya listrik
3.140.633 1.660.248
1.042.055 438.330
Biaya Tidak
Langsung Solar
6.750.000 4.005.903 1.372.048 1.372.048
Biaya Perawatan Mesin Clusher 36.500 21.661,55 7.419,23
7.419,23 Mesin Fong Kee 36.500 21.661,55 7.419,23 7.419,23
Injection Molding 36.500 21.664,52 7.420,24
7.420,24 Bak Conveyer 109.500 64.985
22.258 22.258 Mesin Printing 36.500
36.500 Forklift
100.000 59,346.71 20,326.64 20,327
Mesin Roll Jumbo 73.000 43.323,10 14.838,45 14.838
Mesin Screen Heater
36.500 21.661,55 7.419,23 7.419 Depresiasi Mesin
Fong Kee 375.000
222.550 76.225 76.225
Mesin Clusher 118.500
70.325,85 24.087,07
24.087,07 Injection Molding
1.500.000 890.201 304.900 304.900
Bak Conveyer
102.083 60.583 20.750 20.750
Mesin Printing 731.250 731.250
Timbangan 3.333 1.978 677 677 Forklift
27.750 16.469 9.250 9.250 Mesin Screen
Heater 127.500 75.667,06 25.916,47
75.667,06
Mesin Roll Jumbo 600.000 356.080,27 121.960 121.960
Total Ongkos per unit 300.548.291
88.129.562 104.395520
Jumlah Produksi 14.358.000
7.302.000 3.050.000
Total ongkos per gram 21
12,07 34,23
Tabel 5.25 Rekapitulasi Biaya Dengan Menggunakan Metode ABC Activity Based Costing
No Jenis Produk
Harga Pokok Produksi Rp per Gram
1
Cup Bening 21
2 Cup Printing 12,07
3 Cup Lolly 34,23
BAB VI PEMBAHASAN