Monthly Progress Report November 2013
Western I ndonesia National Roads I mprovement Project 42
6.5.2 Current status of the project for technical field as of 31 November 2013.
The details of Progress of Technical Design Reviewing in aspect of road safety audit as of the end of November 2013 is included as Appendix B.
Technical Design Review Road Safety Audit Report Status Group
Pack No.
Name of Sub-project Technical Design Review Road Safety Audit
Submitted to PMU
Post -Review
Site Visting
Full -Review
Technical Report
AWP -2
5 Sp.Rampa – Poriaha
Link No.015.xx completed completed completed
completed Final Technical Report is
resubmitted on 17th September 2013
6 PS.Pedati - Kerkap
Link No.010.0 completed completed completed
completed Final Technical Report is
submitted on 17th September 2013
7 Indrapura – Tapan
Link No.019.0 -
By DSC -
By DSC -
By DSC Technical
Advisory Additional Technical Advisory
is submitted on 13th November 2013
8 Bts.Pariaman – Manggopoh
Link No.024.0 -
By DSC -
By DSC -
By DSC Technical
Advisory Additional Technical Advisory
is submitted on 13th November 2013
9 Rantau Tijang – Kota Agung
Link No.026.1 10
Sp.Empat – Sp. Air Balam Link No.034.1
- By DSC
- By DSC
- By DSC
Technical Advisory
Additional Technical Advisory is submitted
on 13th November 2013 11
Bantal - Mukomuko Link No.015.2
completed completed completed completed
Final Technical Report is resubmitted
on 16th August 2013 12
Kambang – Indrapura Link No.017.2
- By DSC
- By DSC
- By DSC
Technical Advisory
Additional Technical Advisory is submitted
on 13th November 2013 13
SP.Rukis - TJ.Kemuning Link No.006.0
completed completed completed completed
Final Technical Report is resubmitted
on 16th August 2013
AWP -3
14 Painan – Kambang
Link No.017.1 15
Sibolga – Bts TapSel Link No.016.1
completed completed completed completed
Final Technical Report is submitted
on 23th September 2013
16 Seblat – Ipuh
Link No.010.0 17
Sp.Gng Kemala–Pg.Tampak Link No.061.1
- By PPC
- By PPC
- By PPC
- By PPC
Final Technical Report Was Submitted
By Project Preparation Consultan
18 Mukomuko – Bts.Sumbar
Link No.015.3 19
Lais - Bintuan Link No.009.1
completed completed completed completed
Final Technical Report is submitted
on 17th September 2013 20
Lubuk Alung – Sicincin Link No.009.1
21 Lubuk Alung – Kuraitaji
Link No.009.1
NEW
1 Jalan Sebelat – Ketahun
Link No.013.005 2
Betungan – Tais Link No.013.018
Monthly Progress Report November 2013
Western I ndonesia National Roads I mprovement Project 43
6.6 Environmental and Social Impact Issues 6.6.1
Package No. 01: Krui – Biha Social Issues:-
The Larap report of package for Krui – Biha in Lampung Province has already approved by the World Bank dated 4 January 2013, and the monitoring report has
been submitted to the World Bank from PMU dated 10 April 2013. The World Bank has reviewed the report dated 18 April 2013 require revision to be provided by DGH.
According to the World Bank request, CTC revise a monitoring report, and submit to PMU dated 18 June 2013. A monitoring report has been submitted to the World Bank
from PMU dated 21 June 2103, and approval from the World Bank dated 26 June 2013. Based on this progress, contract signing for the package can be done.
Environmental Issues:-
A SPPL already sent to Bank from PMU dated 30 September 2013, and now waiting comment from the World Bank.
6.6.2. Package No. 02: Padang Sawah – Simpang Empat.
Social Issues:-
The Larap report of package for Padang Sawah – Simpang Empat West Sumatera Province has already approved by the World Bank dated 13 January 2013, and the
monitoring report has been submitted to the World Bank from PMU dated 2 April 2013. The World Bank has reviewed the report dated 18 April 2013 require revision
to be provided by DGH.
According to the World Bank request, CTC revise a monitoring report, and submit to PMU dated 5 July 2013. A monitoring report has been submitted to the World Bank
from PMU dated 15 July 2103, and approval from the World Bank dated 19 July 2013.
The project has the remaining of 21 affected people not yet received compensation from Local Government. Now CTC waiting a proof of the
compensation payment for 21 affected people from local government. A construction could be done when a monitoring report already received the WB.
Environmental Issues:-
CTC waiting for a SPPL report from Balai II Padang
6.6.3. Package No. 03: Manggopoh – Padang Sawah
Social Issues:-
The Larap report of package for Manggopoh - Padang Sawah West Sumatera Province has already approved by the World Bank dated 4 January 2013, and the
monitoring report has been submitted to the World Bank from PMU dated 2 April 2013. The World Bank has reviewed the report dated 18 April 2013 require revision
to be provided by DGH.
According to the World Bank request, CTC revise a monitoring report, and submit to