Monitoring Report of the LARAP Package No.16
4.7 Anti Corruption Issues
4.7.1 Anti Corruption Action Plan ACAP
ACAP for WINRIP was developed from the previous SRIP experiences. Basically, it has the same main components of involving the Community Representative Observers CRO in the bid opening and Third Party Monitoring TPM during the construction supervision although modification was made on the selection process of the CROs for SRIP. Within this plan there are four main pillars as indicated separately below a Community Representative Observers CRO b Publication Disclosure c Complaints Handling System CHS d Third Party Monitoring TPM4.7.2 Community Representative Observers CRO
The Community Representative Observers, who are required to observe the actual bidding activities, were appointed for WP-1 group. All of the CROs were university staff, selected in accordance with the World Bank suggestion to request assistance from local universities. CRO is the independent observer who is not related directly or indirectly to the Contractors, Consultants, and Suppliers or not be part of the WINRIP s management, and not a member of any political party. CROs selection procedures: a. Review the criteria and qualifications of candidates for the CRO. b. Director of Planning, DGH as Chairman of the Project Management Unit, delegated of the authority to the selection of the CRO to the Head of National Roads Implementation Agency BBPJN Head of Procurement Services Unit Unit Layanan Pengadaan - ULP, hereinafter referred to as Head of Balai. c. Head of Balai to invite CRO candidates from the local universities or colleges. d. Selection of CRO to be facilitated by Balai BBPJN Procurement Services Unit Unit Layanan Pengadaan - ULP. e. Elected CRO and substitute CRO must attend one day training to be conducted by the PMU CTC WINRIP. f. Head of Balai to report the result of CRO selection by attaching the Minutes of Election Meeting and send an approval application letter of the CRO to Director of Planning DGH as the Chairman of PMU. g. Based on the report and a written request from the Head of Balai, the Director of Planning DGH as the Chairman of PMU must sign a Letter of Agreement and the Decree of the Establishment of CROs.Parts
» WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» Package 17 Sp. Gunung Kemala Package 13 Sp. Rukis Packages 5 Simpang Rampa Package No.15 Sibolga
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Background WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» Project Development WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» Project Objective WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» CTC Consultants WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» DSC Consultants WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» Procurements WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» Civil Works Progress WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 32.67 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 55.71 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 39.72 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» - 33.66 5.59 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» -0.17 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» Quality Assurance WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» Monitoring Report of the LARAP Package No. 1 Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 14
» Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» Road Safety Audit WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» Implementation Support Components WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Publication Disclosures Masitoh Hasibuan, ST as the member.
» Management Information System WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» Project Risks and Mitigation Measures
» 7.22 0.01 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 1.83 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 23.78 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 3.80 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 3.34 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 6.56 0.11 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 4.64 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 0.94 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 2.10 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 46.76 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 2.46 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 27.18 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 5.36 0.14 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 3.21 1.91 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 35.31 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 47.72 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 65.59 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 84.21 100.00 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» - Delayed relocation of existing PDAM pool
» 5.41 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 3.40 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 4.19 - WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 0.10 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 9.30 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 16.74 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 21.75 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 6.28 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 0.96 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 0.62 2.04 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 1.09 0.00 11.00 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 11.46 17.58 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» 1.18 0.17 35.43 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» -15.06 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
» -12.23 WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
Show more