Design and Supervision Consultant DSC

Western I ndonesia National Roads I mprovement Project 6 - 7  Community Development Officer was monitored the TPM activity on package 07 Inrapura Tapan and package 12 Kambang Indrapura in West Sumatera Province, on November 16 - 19, 2016 The TPM Field monitoring visits jointly with the Contractor and Supervision Consultant. The visit starts from the base camp, Stone crusher, AMP, forwarded to the project site. According to information from the Supervision Consultant progress plan is ± 27 and actual progress is ± 22.5 so there is a behind schedule - 4.5. Work is still focused on widening work excavation and compaction pile foundation class B and A, routine maintenance work patching and leveling, re-alignment and drainage works.  Community Development Officer was monitored the TPM activity on package 13 Simpang Rukis Tanjung Kemuning in Bengkulu Province, on November 28 - 30, 2016. Coordination meeting with PPK 06 Endro Kusumojoyo, ST, MT, Head of Administration Kepala TU, and TPM Team for Package No. 13 Simpang Rukis - Tanjung Kemuning to discussion concerning the planning of TPM first stage monitoring for conducting observation on the project site of Package No. 13. And the next day meeting with TPM Team of in TPM Office Campus of Bengkulu University to discuss about Planning for first stage monitoring for conducting observation on the project site of Package No. 13 Simpang Rukis - Tanjung Kemuning to finds the local community issues and problems faced by Contractor especially those related to local community, and other issues like: project management, environmental and social impact, as well as the application of the specifications in the technical work. Although this monitoring was focused on Package 13, the Community Development Officer used this opportunity for discuss the Monitoring Report and Financial Report invoice documents of other packages in Bengkulu Province, like packages 04, 06, and 11.  Note of TPM activities during November 2016: 1. The 3 rd monitoring stage of TPM Package 06. 2. TPM monitoring of package 11 for 3 rd stage.  Program of TPM up to December, 2016: • The TPM for package 05 plan for monitor field visit for the 1st stage, • The TPM for package 15 plan for monitor field visit for the 1st stage, • The TPM for package 13 plan for monitor field visit for the 1st stage, • The TPM for package 17 plan for monitor field visit for the 1st stage.  Community Development Team has developed Decree of the Director of Roads Network Development of DGH concerning the formation and establishment of Third Party Monitoring for four packages 12, 14, 20, and 21. The activities progress of the Third Party Monitoring TPM from January 2013 until November 2016, as shown in Appendix H2. 6.3.4 Complaint Handling System CHS The Community Development Officer with collaboration with MIS Specialist has developed a