Design and Supervision Consultant DSC
                                                                                Western I ndonesia National Roads I mprovement Project 6 - 7
 Community  Development  Officer  was  monitored  the  TPM  activity  on  package  07  Inrapura
Tapan  and  package  12  Kambang Indrapura  in  West  Sumatera Province,  on  November 16 -
19, 2016 The TPM Field monitoring visits jointly with the Contractor and Supervision Consultant. The visit
starts  from  the  base  camp,  Stone  crusher,  AMP,  forwarded  to  the  project  site.  According  to information  from  the  Supervision  Consultant  progress  plan  is  ±  27  and  actual  progress  is  ±
22.5 so there is a behind schedule - 4.5. Work is still focused on widening work excavation and  compaction  pile  foundation  class  B  and  A,  routine  maintenance  work  patching  and
leveling, re-alignment and drainage works. 
Community Development Officer was monitored the TPM activity on package 13 Simpang Rukis Tanjung Kemuning in Bengkulu Province, on November 28 - 30, 2016.
Coordination meeting with PPK 06 Endro Kusumojoyo, ST, MT, Head of Administration  Kepala TU,  and  TPM  Team  for  Package  No.  13  Simpang  Rukis - Tanjung  Kemuning  to  discussion
concerning the planning of TPM first stage monitoring for conducting observation on the project site of Package No. 13. And the next day meeting with TPM Team of in TPM Office Campus of
Bengkulu  University  to  discuss  about  Planning  for first  stage  monitoring  for  conducting observation on the project site of Package No. 13 Simpang Rukis - Tanjung Kemuning to finds
the  local community  issues  and  problems  faced  by  Contractor especially  those related  to  local community,  and    other  issues like:  project  management,  environmental  and  social  impact,  as
well as the application of the specifications in the technical work. Although this monitoring was focused on Package 13, the Community Development Officer used
this opportunity for discuss the Monitoring Report and Financial Report invoice documents of other packages in Bengkulu Province, like packages 04, 06, and 11.
 Note of TPM activities during November 2016:
1. The 3
rd
monitoring stage of TPM Package 06. 2. TPM monitoring of package 11 for 3
rd
stage. 
Program of TPM up to December, 2016:
•
The TPM for package 05 plan for monitor  field visit for the 1st stage,
•
The TPM for package 15 plan for monitor  field visit for the 1st stage,
•
The TPM for package 13 plan for monitor  field visit for the 1st stage,
•
The TPM for package 17 plan for monitor  field visit for the 1st stage. 
Community  Development  Team  has  developed Decree  of  the  Director of  Roads  Network Development of DGH concerning the formation and establishment of Third Party Monitoring for
four packages 12, 14, 20, and 21. The activities progress of the Third Party Monitoring TPM from January 2013 until November 2016,
as shown in Appendix H2. 6.3.4
Complaint Handling System CHS
The  Community  Development  Officer  with  collaboration  with  MIS  Specialist has  developed  a