Lampiran 3 Proyeksi Rugi Laba KJA 6 Kotak
No Uraian
Satuan Jumlah satuan
Harga satuan Rp Nilai Rp
A Penerimaan
Penjualan Ikan Kerapu ± 0,7 kg Ekor
322.75 88,750
28,644,063
Total Penerimaan Tunai 28,644,063
B Biaya
I. Biaya Tunai a. Biaya Variabel
Pakan BuatanPelet Kg
Pakan Alami Kg
1450 2,750
3,987,500 Benih Kerapu
Ekor 600
10,750 6,450,000
Total Biaya Variabel 10,437,500
b. Biaya Tetap
Biaya Perawatan Karamba Tahun
1 1,200,000
1,200,000
Total Biaya Tetap Tunai 1,200,000
Total Biaya Tunai 11,637,500
II. Biaya Tidak Tunai
Tenaga Kerja Periode
1 500,000
5,000,000 Penyusutan KJA
Tahun 1
1,382,000 1,382,000
Penyusutan Peralatan Tahun
1 100,000
100,000 Penyusutan Perahu
Tahun 1
200,000 200,000
Total Biaya Tidak Tunai 6,682,000
TOTAL BIAYA PRODUKSI 18,319,500
C KEUNTUNGAN SEBELUM PAJAK
10,324,563
Pajak Pengjasilan 10 1,032,456
D KEUNTUNGAN SETELAH PAJAK
9,292,106 E RC
1.56 F
Cost Per Unit 56,761
99
Lampiran 4 Cash Flow KJA 2 Kotak
No Keterangan
Tahun 0 1 2 3 4 5
A INFLOW
Hasil Penjualan -
12,703,600 12,703,600
12,703,600 12,703,600
12,703,600 Nilai Sisa
- -
- -
- 950,000
Total Inflow -
12,703,600 12,703,600
12,703,600 12,703,600
13,653,600 B OUTFLOW
1. Biaya Investasi
Konstruksi KJA 5tahun 1,880,000
Peralatan 240,000
Perahu 1,500,000
Total Biaya Investasi 3,620,000
2. Biaya Reinvestasi
450,000 450,000
3. Total Biaya Variabel -
4,530,300 4,530,300
4,530,300 4,530,300
4,530,300 4. Biaya Tetap
Perawatan Karamba 70,000
70,000 70,000
70,000 70,000
Sub Total 70,000
70,000 70,000
70,000 70,000
Total Outflow 3,620,000
4,600,300 5,050,300
4,600,300 5,050,300
4,600,300 C
Benefit 3,620,000
8,103,300 7,653,300
8,103,300 7,653,300
9,053,300 D
Net Benefit 3,620,000
8,103,300 7,653,300
8,103,300 7,653,300
9,053,300 E
Discuont Factor 8.5 1
0.9501 0.9027
0.8577 0.8149
0.7743
Present Value 3,620,000
7,699,097 6,908,830
6,950,173 6,236,778
7,009,651 F
Net Present Value 24,172,937
G IRR
220.57 H
Net BenefitCost 1.78
I PP
5.64
100
Lampiran 5 Cash Flow KJA 4 Kotak
No Keterangan
Tahun 0 1 2 3 4 5
A INFLOW
Hasil Penjualan -
22,167,600 22,167,600
22,167,600 22,167,600
22,167,600 Nilai Sisa
- -
- -
- 1,450,000
Total Inflow -
22,167,600 22,167,600
22,167,600 22,167,600
23,617,600 B OUTFLOW
1. Biaya Investasi
Konstruksi KJA 5tahun 4,120,000
Peralatan 360,000
Perahu 1,500,000
Total Biaya Investasi 5,980,000
- -
- -
-
2. Biaya Reinvestasi
- -
1,020,000 -
1,020,000 -
3. Total Biaya Variabel -
8,305,600 8,305,600
8,305,600 8,305,600
8,305,600 4. Biaya Tetap
Perawatan Karamba -
100,000 100,000
100,000 100,000
100,000 Sub Total
- 100,000
100,000 100,000
100,000 100,000
Total Outflow 5,980,000
8,405,600 9,425,600
8,405,600 9,425,600
8,405,600 C
Benefit 5,980,000 13,762,000
12,742,000 13,762,000
12,742,000 15,212,000
D Net Benefit
5,980,000 13,762,000 12,742,000
13,762,000 12,742,000
15,212,000 E
Discuont Factor 5.25 1
0.9501 0.9027
0.8577 0.8149
0.7743 Present Value
5,980,000 13,075,534 11,502,530
11,803,621 10,383,629
11,778,115 F
Net Present Value 52,563,430
G IRR
225.68 H
Net BenefitCost 2.20
I PP
5.49
101
Lampiran 6 Cash Flow KJA 6 Kotak
No Keterangan
Tahun 0 1 2 3 4 5
A INFLOW
Hasil Penjualan -
28,644,063 28,644,063
28,644,063 28,644,063
28,644,063 Nilai Sisa
- -
- -
- 1,550,000
Total Inflow -
28,644,063 28,644,063
28,644,063 28,644,063
30,194,063 B OUTFLOW
1. Biaya Investasi
Konstruksi KJA 5tahun 5,625,000
Peralatan 500,000
Perahu 1,500,000
Total Biaya Investasi 7,625,000
- -
- -
-
2. Biaya Reinvestasi
- -
1,290,000 -
1,290,000 -
3. Total Biaya Variabel -
10,437,500 10,437,500
10,437,500 10,437,500
10,437,500 4. Biaya Tetap
Perawatan Karamba -
120,000 120,000
120,000 120,000
120,000 Sub Total
- 120,000
120,000 120,000
120,000 120,000
Total Outflow 7,625,000
10,557,500 11,847,500
10,557,500 11,847,500
10,557,500 C
Benefit 7,625,000 18,086,563
16,796,563 18,086,563
16,796,563 19,636,563
D Net Benefit
7,625,000 18,086,563 16,796,563
18,086,563 16,796,563
19,636,563 E
Discuont Factor 5.25 1
0.9501 0.9027
0.8577 0.8149
0.7743
Present Value 7,625,000 17,184,382
15,162,688 15,512,783
13,687,748 15,203,898
F Net Present Value
55,235,042 G IRR
232.86 H
Net BenefitCost 1.80
I PP
5.32
102
Lampiran 7 Analisis Sensitifitas Harga Bibit Kerapu Naik 10 KJA 2 Kotak
No Keterangan
Tahun 0 1 2 3 4 5
A INFLOW
Hasil Penjualan -
12,703,600 12,703,600
12,703,600 12,703,600
12,703,600 Nilai Sisa
- -
- -
- 700,000
Total Inflow -
12,703,600 12,703,600
12,703,600 12,703,600
13,403,600 B OUTFLOW
1. Biaya Investasi
Konstruksi KJA 5tahun 1,880,000
Peralatan 240,000
Perahu 1,500,000
Total Biaya Investasi 3,620,000
2. Biaya Reinvestasi
- -
450,000 -
450,000 -
3. Total Biaya Variabel -
4,754,300 4,754,300
4,754,300 4,754,300
4,754,300 4. Biaya Tetap
Perawatan Karamba -
70,000 70,000
70,000 70,000
70,000 Sub Total
- 70,000
70,000 70,000
70,000 70,000
Total Outflow 3,620,000
4,824,300 5,274,300
4,824,300 5,274,300
4,824,300 C
Benefit 3,620,000
7,879,300 7,429,300
7,879,300 7,429,300
8,579,300 D
Net Benefit 3,620,000
7,879,300 7,429,300
7,879,300 7,429,300
8,579,300 E
Discuont Factor 8.5 1
0.9501 0.9027
0.8577 0.8149
0.7743
Present Value 3,620,000
7,486,271 6,706,620
6,758,049 6,054,238
6,642,649 F
Net Present Value 25,136,074
G IRR
214.89 H
Net BenefitCost 1.84
I PP
5.51
103
Lampiran 8 Analisis Sensitifitas Harga Bibit Kerapu Naik 10 KJA 4 Kotak
No Keterangan
Tahun 0 1 2 3 4 5
A INFLOW