ANALISIS HIDROLOGI Tabel 4.55 Perhitungan debit andalan tahun 2002

LAPORAN TUGAS AKHIR Perencanaan Embung Tambakboyo Kabupaten Sleman DIY 177

BAB IV ANALISIS HIDROLOGI Tabel 4.55 Perhitungan debit andalan tahun 2002

C Uraian Satuan Bulan Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des [1] CURAH HUJAN P mm 590 703 340 257 125 98 60 6 4 324 306 400 [2] JUMLAH HARI HUJAN N hr 14 16 12 11 10 7 3 2 1 11 11 14 Limited Evapotranpiration [3] Evapotranpiration Eto mm 105,15 92,76 107,74 90,46 92,73 81,06 87,64 100,13 104,19 111,87 103,98 103,00 [4] Exposed Surface m 30 30 30 40 50 50 50 50 50 30 30 30 [5] m20 18 - N 0,060 0,030 0,090 0,140 0,200 0,275 0,375 0,400 0,425 0,105 0,105 0,060 [6] dE [5] x [3] mm 6,31 2,78 9,70 12,66 18,55 22,29 32,86 40,05 44,28 11,75 10,92 6,18 [7] Etl = Eto -dE [3] - [6] mm 101,65 89,26 104,24 86,96 89,23 77,56 84,14 96,63 100,69 108,37 100,48 99,50 WATER BALANCE [8] P - Etl [1] - [7] mm 488,35 613,74 235,76 170,04 35,77 20,44 -24,14 -90,63 -96,69 215,63 205,52 300,50 [9] SOIL STORAGE mm 24,14 90,63 96,69 [10] SOIL MOISTURE mm 50 50 50 50 50 50 50 50 50 50 50 50 [11] WATER SURPLUS [8] - [9] mm 488,35 613,74 235,76 170,04 35,77 20,44 215,63 205,52 300,50 RUN OFF AND GROUND WATER STORAGE [12] INFILTRATION 0,3 x [11] mm 146,50 184,12 70,73 51,01 11 6 65 61,66 90,15 [13] 0,5 x 1 + k x 1 x [12] mm 128,19 161,11 61,89 44,64 9 5 57 53,95 78,88 [14] K x V n-1 mm 298,00 319,64 360,56 316,84 271,11 210,37 161,80 121,35 91,01 68,26 93,65 110,70 [15] STORAGE VOLUME [13] + [14] mm 426,19 480,75 422,45 361,47 280,49 215,74 161,80 121,35 91,01 124,86 147,60 189,58 [16] dVn = Vn - Vn-1 mm -23,40 54,56 -58,30 -60,98 -80,98 -64,76 -53,93 -40,45 -30,34 33,85 22,73 41,98 [17] BASE FLOW [12] - [16] mm 169,90 129,56 129,03 111,99 91,71 70,89 53,93 40,45 30,34 30,84 38,92 48,17 [18] DIRECT RUNOFF [11] - [12] mm 341,84 429,62 165,03 119,03 25 14 151 143,87 210,35 [19] RUN OFF [17]+[18] mm 511,75 559,18 294,06 231,02 116,75 85,20 53,93 40,45 30,34 181,78 182,79 258,52 [20] RUN OFF [17]+[18] m³dt 2,0E-04 2,2E-04 1,1E-04 8,9E-05 4,5E-05 3,3E-05 2,1E-05 1,6E-05 1,2E-05 7,0E-05 7,1E-05 1,0E-04 [21] CA km 2 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 [22] DEBIT EFEKTIF [19] x A ltdt 4013,82 4385,88 2306,43 1811,95 915,70 668,25 423,03 317,27 237,95 1425,80 1433,69 2027,64 [23] DEBIT EFEKTIF [19] x A m³dt 4,01 4,39 2,31 1,81 0,92 0,67 0,42 0,32 0,24 1,43 1,43 2,03 Sumber : Perhitungan LAPORAN TUGAS AKHIR Perencanaan Embung Tambakboyo Kabupaten Sleman DIY 178

BAB IV ANALISIS HIDROLOGI Tabel 4.56 Perhitungan debit andalan tahun 2003