ANALISIS HIDROLOGI Tabel 4.51 Perhitungan debit andalan tahun 1998

LAPORAN TUGAS AKHIR Perencanaan Embung Tambakboyo Kabupaten Sleman DIY 173

BAB IV ANALISIS HIDROLOGI Tabel 4.51 Perhitungan debit andalan tahun 1998

C Uraian Satuan Bulan Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des [1] CURAH HUJAN P mm 424 659 514 404 95 317 285 33 67 620 684 326 [2] JUMLAH HARI HUJAN N hr 16 17 16 14 8 12 11 5 7 17 18 13 Limited Evapotranpiration [3] Evapotranpiration Eto mm 105,15 92,76 107,74 90,46 92,73 81,06 87,64 100,13 104,19 111,87 103,98 103,00 [4] Exposed Surface m 30 30 30 30 50 30 40 50 50 30 30 40 [5] m20 18 - N 0,030 0,015 0,030 0,060 0,250 0,090 0,140 0,325 0,275 0,015 0,000 0,100 [6] dE [5] x [3] mm 3,15 1,39 3,23 5,43 23,18 7,30 12,27 32,54 28,65 1,68 0,00 10,30 [7] Etl = Eto -dE [3] - [6] mm 101,65 89,26 104,24 86,96 89,23 77,56 84,14 96,63 100,69 108,37 100,48 99,50 WATER BALANCE [8] P - Etl [1] - [7] mm 322,35 569,74 409,76 317,04 5,77 239,44 200,86 -63,63 -33,69 511,63 583,52 226,50 [9] SOIL STORAGE mm 7,23 67,56 83,14 97,63 101,69 92,37 [10] SOIL MOISTURE mm 50 50 50 50 50 50 50 50 50 50 50 50 [11] WATER SURPLUS [8] - [9] mm 322,35 569,74 409,76 317,04 583,52 226,50 RUN OFF AND GROUND WATER STORAGE [12] INFILTRATION 0,3 x [11] mm 96,70 170,92 122,93 95,11 175,06 67,95 [13] 0,5 x 1 + k x 1 x [12] mm 84,62 149,56 107,56 83,22 153,18 59,46 [14] K x V n-1 mm 298,00 286,96 327,39 326,21 307,08 230,31 172,73 129,55 97,16 72,87 54,65 155,87 [15] STORAGE VOLUME [13] + [14] mm 382,62 436,52 434,95 409,44 307,08 230,31 172,73 129,55 97,16 72,87 207,83 215,33 [16] dVn = Vn - Vn-1 mm -23,40 53,90 -1,57 -25,51 -102,36 -76,77 -57,58 -43,18 -32,39 -24,29 134,96 7,50 [17] BASE FLOW [12] - [16] mm 120,10 117,02 124,50 120,63 102,36 76,77 57,58 43,18 32,39 24,29 40,10 60,45 [18] DIRECT RUNOFF [11] - [12] mm 225,64 398,82 286,83 221,93 408,47 158,55 [19] RUN OFF [17]+[18] mm 345,75 515,84 411,33 342,56 102,36 76,77 57,58 43,18 32,39 24,29 448,57 219,00 [20] RUN OFF [17]+[18] m³dt 1,3E-04 2,0E-04 1,6E-04 1,3E-04 3,9E-05 3,0E-05 2,2E-05 1,7E-05 1,2E-05 9,4E-06 1,7E-04 8,4E-05 [21] CA km 2 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 [22] DEBIT EFEKTIF [19] x A ltdt 2711,82 4045,92 3226,20 2686,79 802,84 602,13 451,60 338,70 254,02 190,52 3518,27 1717,69 [23] DEBIT EFEKTIF [19] x A m³dt 2,71 4,05 3,23 2,69 0,80 0,60 0,45 0,34 0,25 0,19 3,52 1,72 Sumber : Perhitungan LAPORAN TUGAS AKHIR Perencanaan Embung Tambakboyo Kabupaten Sleman DIY 174

BAB IV ANALISIS HIDROLOGI Tabel 4.52 Perhitungan debit andalan tahun 1999