ANALISIS HIDROLOGI Tabel 4.52 Perhitungan debit andalan tahun 1999

LAPORAN TUGAS AKHIR Perencanaan Embung Tambakboyo Kabupaten Sleman DIY 174

BAB IV ANALISIS HIDROLOGI Tabel 4.52 Perhitungan debit andalan tahun 1999

C Uraian Satuan Bulan Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des [1] CURAH HUJAN P mm 518 355 437 334 214 44 66 1 15 229 396 561 [2] JUMLAH HARI HUJAN N hr 14 13 14 12 11 4 5 1 3 9 13 15 Limited Evapotranpiration [3] Evapotranpiration Eto mm 105,15 92,76 107,74 90,46 92,73 81,06 87,64 100,13 104,19 111,87 103,98 103,00 [4] Exposed Surface m 30 30 30 30 40 50 50 50 50 40 30 30 [5] m20 18 - N 0,060 0,075 0,060 0,090 0,140 0,350 0,325 0,425 0,375 0,180 0,075 0,045 [6] dE [5] x [3] mm 6,31 6,96 6,46 8,14 12,98 28,37 28,48 42,56 39,07 20,14 7,80 4,64 [7] Etl = Eto -dE [3] - [6] mm 101,65 89,26 104,24 86,96 89,23 77,56 84,14 96,63 100,69 108,37 100,48 99,50 WATER BALANCE [8] P - Etl [1] - [7] mm 416,35 265,74 332,76 247,04 124,77 -33,56 -18,14 -95,63 -85,69 120,63 295,52 461,50 [9] SOIL STORAGE mm 0,00 33,56 18,14 95,63 85,69 0,00 [10] SOIL MOISTURE mm 50 50 50 50 50 50 50 50 50 50 50 50 [11] WATER SURPLUS [8] - [9] mm 416,35 265,74 332,76 247,04 124,77 0,00 0,00 0,00 0,00 120,63 295,52 461,50 RUN OFF AND GROUND WATER STORAGE [12] INFILTRATION 0,3 x [11] mm 124,90 79,72 99,83 74,11 37 36 88,66 138,45 [13] 0,5 x 1 + k x 1 x [12] mm 109,29 69,76 87,35 64,85 33 32 77,58 121,14 [14] K x V n-1 mm 298,00 305,47 281,42 276,58 256,07 216,62 162,46 121,85 91,38 68,54 75,15 114,55 [15] STORAGE VOLUME [13] + [14] mm 407,29 375,23 368,77 341,43 288,82 216,62 162,46 121,85 91,38 100,21 152,73 235,69 [16] dVn = Vn - Vn-1 mm -23,40 -32,07 -6,46 -27,34 -52,60 -72,21 -54,15 -40,62 -30,46 8,82 52,52 82,96 [17] BASE FLOW [12] - [16] mm 148,30 111,79 106,29 101,46 90,04 72,21 54,15 40,62 30,46 27,37 36,13 55,49 [18] DIRECT RUNOFF [11] - [12] mm 291,44 186,02 232,93 172,93 87 84 206,87 323,05 [19] RUN OFF [17]+[18] mm 439,75 297,81 339,22 274,38 177,37 72,21 54,15 40,62 30,46 111,81 243,00 378,54 [20] RUN OFF [17]+[18] m³dt 1,7E-04 1,1E-04 1,3E-04 1,1E-04 6,8E-05 2,8E-05 2,1E-05 1,6E-05 1,2E-05 4,3E-05 9,4E-05 1,5E-04 [21] CA km 2 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 [22] DEBIT EFEKTIF [19] x A ltdt 3449,09 2335,82 2660,61 2152,10 1391,20 566,33 424,75 318,56 238,92 877,00 1905,94 2969,00 [23] DEBIT EFEKTIF [19] x A m³dt 3,45 2,34 2,66 2,15 1,39 0,57 0,42 0,32 0,24 0,88 1,91 2,97 Sumber : Perhitungan LAPORAN TUGAS AKHIR Perencanaan Embung Tambakboyo Kabupaten Sleman DIY 175

BAB IV ANALISIS HIDROLOGI Tabel 4.53 Perhitungan debit andalan tahun 2000