ANALISIS HIDROLOGI Tabel 4.54 Perhitungan debit andalan tahun 2001

LAPORAN TUGAS AKHIR Perencanaan Embung Tambakboyo Kabupaten Sleman DIY 176

BAB IV ANALISIS HIDROLOGI Tabel 4.54 Perhitungan debit andalan tahun 2001

C Uraian Satuan Bulan Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des [1] CURAH HUJAN P mm 455 379 629 352 128 199 76 6 2 461 631 163 [2] JUMLAH HARI HUJAN N hr 15 14 16 13 11 12 6 2 1 15 16 11 Limited Evapotranpiration [3] Evapotranpiration Eto mm 105,15 92,76 107,74 90,46 92,73 81,06 87,64 100,13 104,19 111,87 103,98 103,00 [4] Exposed Surface m 30 30 30 30 40 40 50 50 50 40 30 40 [5] m20 18 - N 0,045 0,030 0,075 0,060 0,120 0,140 0,300 0,250 0,375 0,120 0,075 0,120 [6] dE [5] x [3] mm 4,73 2,78 8,08 5,43 11,13 11,35 26,29 25,03 39,07 13,42 7,80 12,36 [7] Etl = Eto -dE [3] - [6] mm 101,65 89,26 104,24 86,96 89,23 77,56 84,14 96,63 100,69 108,37 100,48 99,50 WATER BALANCE [8] P - Etl [1] - [7] mm 353,35 289,74 524,76 265,04 38,77 121,44 -8,14 -90,63 -98,69 352,63 530,52 63,50 [9] SOIL STORAGE mm 8 91 99 [10] SOIL MOISTURE mm 50 50 50 50 50 50 50 50 50 50 50 50 [11] WATER SURPLUS [8] - [9] mm 353,35 289,74 524,76 265,04 38,77 121,44 352,63 530,52 63,50 RUN OFF AND GROUND WATER STORAGE [12] INFILTRATION 0,3 x [11] mm 106,00 86,92 157,43 79,51 12 36 106 159,16 19,05 [13] 0,5 x 1 + k x 1 x [12] mm 92,75 76,06 137,75 69,57 10 32 93 139,26 16,67 [14] K x V n-1 mm 298,00 293,07 276,84 310,94 285,39 221,67 190,16 142,62 106,97 80,23 129,59 201,64 [15] STORAGE VOLUME [13] + [14] mm 390,75 369,12 414,59 380,52 295,56 253,55 190,16 142,62 106,97 172,79 268,86 218,31 [16] dVn = Vn - Vn-1 mm -23,40 -21,63 45,47 -34,07 -84,95 -42,01 -63,39 -47,54 -35,66 65,82 96,06 -50,55 [17] BASE FLOW [12] - [16] mm 129,40 108,55 111,96 113,59 96,58 78,45 63,39 47,54 35,66 39,97 63,09 69,60 [18] DIRECT RUNOFF [11] - [12] mm 247,34 202,82 367,33 185,53 27 85 247 371,37 44,45 [19] RUN OFF [17]+[18] mm 376,75 311,37 479,29 299,12 123,72 163,45 63,39 47,54 35,66 286,81 434,46 114,04 [20] RUN OFF [17]+[18] m³dt 1,5E-04 1,2E-04 1,8E-04 1,2E-04 4,8E-05 6,3E-05 2,4E-05 1,8E-05 1,4E-05 1,1E-04 1,7E-04 4,4E-05 [21] CA km 2 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 [22] DEBIT EFEKTIF [19] x A ltdt 2954,96 2442,22 3759,26 2346,07 970,39 1282,04 497,18 372,88 279,66 2249,55 3407,62 894,49 [23] DEBIT EFEKTIF [19] x A m³dt 2,95 2,44 3,76 2,35 0,97 1,28 0,50 0,37 0,28 2,25 3,41 0,89 Sumber : Perhitungan LAPORAN TUGAS AKHIR Perencanaan Embung Tambakboyo Kabupaten Sleman DIY 177

BAB IV ANALISIS HIDROLOGI Tabel 4.55 Perhitungan debit andalan tahun 2002