ANALISIS HIDROLOGI Tabel 4.41 Perhitungan debit andalan tahun 1988

LAPORAN TUGAS AKHIR Perencanaan Embung Tambakboyo Kabupaten Sleman DIY 163

BAB IV ANALISIS HIDROLOGI Tabel 4.41 Perhitungan debit andalan tahun 1988

C Uraian Satuan Bulan Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des [1] CURAH HUJAN P mm 576 825 746 225 407 184 19 16 53 522 424 360 [2] JUMLAH HARI HUJAN N hr 15 18 17 13 16 9 4 3 8 14 13 14 Limited Evapotranpiration [3] Evapotranpiration Eto mm 105,15 92,76 107,74 90,46 92,73 81,06 87,64 100,13 104,19 111,87 103,98 103,00 [4] Exposed Surface m 30 30 30 40 30 40 50 50 50 30 30 30 [5] m20 18 - N 0,045 0,060 0,090 0,160 0,075 0,240 0,375 0,450 0,450 0,165 0,105 0,075 [6] dE [5] x [3] mm 4,73 5,57 9,70 14,47 6,95 19,45 32,86 45,06 46,89 18,46 10,92 7,73 [7] Etl = Eto -dE [3] - [6] mm 100,42 87,19 98,04 75,99 85,78 61,60 54,77 55,07 57,31 93,41 93,06 95,28 WATER BALANCE [8] P - Etl [1] - [7] mm 475,58 737,81 647,96 149,01 321,22 122,40 -35,77 -39,07 -4,31 428,59 330,94 264,72 [9] SOIL STORAGE mm 42,35 57,10 23,06 [10] SOIL MOISTURE mm 50 50 50 50 50 50 50 50 50 50 50 50 [11] WATER SURPLUS [8] - [9] mm 475,58 737,81 647,96 149,01 321,22 122,40 428,59 330,94 264,72 RUN OFF AND GROUND WATER STORAGE [12] INFILTRATION 0,3 x [11] mm 142,67 221,34 194,39 44,70 96,37 36,72 128,58 99,28 79,42 [13] 0,5 x 1 + k x 1 x [12] mm 124,84 193,67 170,09 39,12 84,32 32,13 112,51 86,87 69,49 [14] K x V n-1 mm 298,00 317,13 383,10 414,89 340,51 318,62 263,06 197,30 147,97 110,98 167,61 190,86 [15] STORAGE VOLUME [13] + [14] mm 422,84 510,80 553,19 454,01 424,83 350,75 263,06 197,30 147,97 223,49 254,49 260,35 [16] dVn = Vn - Vn-1 mm 14,67 87,97 42,39 -99,18 -29,18 -74,08 -87,69 -65,77 -49,32 75,51 31,00 5,87 [17] BASE FLOW [12] - [16] mm 128,00 133,38 152,00 143,89 125,55 110,80 87,69 65,77 49,32 53,07 68,28 73,55 [18] DIRECT RUNOFF [11] - [12] mm 332,91 516,47 453,57 104,31 224,86 85,68 300,01 231,66 185,31 [19] RUN OFF [17]+[18] mm 460,91 649,84 605,57 248,20 350,41 196,47 87,69 65,77 49,32 353,08 299,94 258,85 [20] RUN OFF [17]+[18] m³dt 1,8E-04 2,5E-04 2,3E-04 9,6E-05 1,4E-04 7,6E-05 3,4E-05 2,5E-05 1,9E-05 1,4E-04 1,2E-04 1,0E-04 [21] CA km 2 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 [22] DEBIT EFEKTIF [19] x A ltdt 3615,07 5096,96 4749,71 1946,69 2748,36 1541,02 687,77 515,82 386,87 2769,34 2352,54 2030,29 [23] DEBIT EFEKTIF [19] x A m³dt 3,62 5,10 4,75 1,95 2,75 1,54 0,69 0,52 0,39 2,77 2,35 2,03 Sumber : Perhitungan LAPORAN TUGAS AKHIR Perencanaan Embung Tambakboyo Kabupaten Sleman DIY 164

BAB IV ANALISIS HIDROLOGI Tabel 4.42 Perhitungan debit andalan tahun 1989