ANALISIS HIDROLOGI Tabel 4.58 Perhitungan debit andalan tahun 2005

LAPORAN TUGAS AKHIR Perencanaan Embung Tambakboyo Kabupaten Sleman DIY 180

BAB IV ANALISIS HIDROLOGI Tabel 4.58 Perhitungan debit andalan tahun 2005

C Uraian Satuan Bulan Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des [1] CURAH HUJAN P mm 431 362 264 245 34 43 40 34 35 178 245 650 [2] JUMLAH HARI HUJAN N hr 15 14 12 10 13 6 3 7 11 13 Limited Evapotranpiration [3] Evapotranpiration Eto mm 105,15 92,76 107,74 90,46 92,73 81,06 87,64 100,13 104,19 111,87 103,98 103,00 [4] Exposed Surface m 30 40 40 40 50 50 50 50 50 30 30 30 [5] m20 18 - N 0,045 0,080 0,120 0,160 0,125 0,300 0,375 0,450 0,450 0,165 0,105 0,075 [6] dE [5] x [3] mm 4,73 7,42 12,93 14,47 11,59 24,32 32,86 45,06 46,89 18,46 10,92 7,73 [7] Etl = Eto -dE [3] - [6] mm 101,65 89,26 104,24 86,96 89,23 77,56 84,14 96,63 100,69 108,37 100,48 99,50 WATER BALANCE [8] P - Etl [1] - [7] mm 329,35 272,74 159,76 158,04 -55,23 -34,56 -44,14 -62,63 -65,69 69,63 144,52 550,50 [9] SOIL STORAGE mm 55,23 34,56 44,14 62,63 65,69 0,00 [10] SOIL MOISTURE mm 50 50 50 50 50 50 50 50 50 50 50 50 [11] WATER SURPLUS [8] - [9] mm 329,35 272,74 159,76 158,04 69,63 144,52 550,50 RUN OFF AND GROUND WATER STORAGE [12] INFILTRATION 0,3 x [11] mm 98,80 81,82 47,93 47,41 21 43,36 165,15 [13] 0,5 x 1 + k x 1 x [12] mm 86,45 71,60 41,94 41,49 18 37,94 144,51 [14] K x V n-1 mm 298,00 288,34 269,95 233,92 206,55 154,91 116,19 87,14 65,35 49,02 50,47 66,31 [15] STORAGE VOLUME [13] + [14] mm 384,45 359,94 311,89 275,40 206,55 154,91 116,19 87,14 65,35 67,29 88,41 210,81 [16] dVn = Vn - Vn-1 mm -23,40 -24,52 -48,05 -36,49 -68,85 -51,64 -38,73 -29,05 -21,78 1,94 21,11 122,40 [17] BASE FLOW [12] - [16] mm 122,20 106,34 95,97 83,90 68,85 51,64 38,73 29,05 21,78 18,95 22,24 42,75 [18] DIRECT RUNOFF [11] - [12] mm 230,54 190,92 111,83 110,63 49 101,17 385,35 [19] RUN OFF [17]+[18] mm 352,75 297,26 207,81 194,53 68,85 51,64 38,73 29,05 21,78 67,69 123,41 428,09 [20] RUN OFF [17]+[18] m³dt 1,4E-04 1,1E-04 8,0E-05 7,5E-05 2,7E-05 2,0E-05 1,5E-05 1,1E-05 8,4E-06 2,6E-05 4,8E-05 1,7E-04 [21] CA km 2 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 20,33 [22] DEBIT EFEKTIF [19] x A ltdt 2766,72 2331,53 1629,91 1525,75 540,02 405,02 303,76 227,82 170,87 530,95 967,95 3357,70 [23] DEBIT EFEKTIF [19] x A m³dt 2,77 2,33 1,63 1,53 0,54 0,41 0,30 0,23 0,17 0,53 0,97 3,36 Sumber : Perhitungan LAPORAN TUGAS AKHIR Perencanaan Embung Tambakboyo Kabupaten Sleman DIY 181

BAB IV ANALISIS HIDROLOGI Tabel 4.59 Perhitungan debit andalan tahun 2006