General Overview Management Information System

Monthly Progress Report December 2013 Western I ndonesia National Roads I mprovement Project 31

5.3.2. Database

A typical workflow in management of incoming and outgoing data is divided into 3 types of data handling, below: 1. Hardcopy, the document is stored in a rack. 2. Soft files, saved in the File Storage Server. 3. Data information, inputted in database applications. For further handling that needs to be made an integrated database management system so that all data can be stored properly. The database system has been prepared to store all of WINRIP project information in a systematic, easily traceable, maintainable, and manageable format as outlined below with the following systems: a. File Storage Server, used to store all files of reports and other documents. b. Letter Database System, used to record all information of incoming and outgoing letter. c. Document Library System, used to record all information of hard copy documents then store it into library shelves. Following further review the sub ‐folder server file system has been amended to accommodate the needs of the professional staff as follows: CODE ROOT 1 st FOLDER 2 nd FOLDER 01 01_Project_Document 01_01 01_01_PIP 01_02 01_02_Loan_Agreement 01_03 01_03_Loan_Agreement_Extention 01_04 01_04_PAD 01_05 01_05_PMM 01_06 10_06_Aide_Memoire 02 02_General_Contract 02_01 02_01_Pre-contract 02_02 02_02_Contract 02_03 02_03_Mobilization 02_04 02_04_Amendment 02_05 02_05_Addendum 02_06 02_06_MOA Monthly Progress Report December 2013 Western I ndonesia National Roads I mprovement Project 32 CODE ROOT 1 st FOLDER 2 nd FOLDER 03 03_General_Report 03_01 03_01_Inception_Report 03_02 03_02_Monthly_Progress_Report 03_03 03_03_IFR 03_04 03_04_IFR_Q 03_05 03_05_Procurement_Committee_Read iness_ Assessment_Report 03_06 03_06_Bid_Evaluation_Procurement_ Report 03_07 03_07_Draft_Project_Completion_Rep ort 03_08 03_08_Project_Completion_Report 03_09 03_09_Technical_Report 04_01 04_General_Letter 05 05_General_Document ation 05_01 05_01_Meeting 05_02 05_02_Workshop 05_03 05_03_Training 05_04 05_04_Site_Visit 06 06_Office_Manager 06_01 06_01_Document 06_02 06_02_Operational 07 07_Highway 07_01 07_01_General 07_02 07_02_Design_Review 07_02_01 Package 1, 2, 3, 4 07_03 07_03_Auditor 07_03_01 Package 1, 2, 3, 4 07_04 07_04_Meeting 07_05 07_05_Report 08 08_Quality_Assurance 08_01 08_01_General 08_02 08_02_Meeting 08_03 08_03_Report 09 09_Financial 09_01 09_01_General 09_02 09_01_Meeting 09_03 09_01_Report 10 10_Environmental 10_01 10_01_General 10_02 10_02_Environmental_Review 10_03 10_03_Environmental_Studies 10_04 10_04_HIVAIDS 10_05 10_05_Monitoring 10_06 10_06_Meeting 10_07 10_07_Report