Monitoring Report of the LARAP Package No. 4
9. Monitoring Report of the LARAP Package No. 9
: Rantau Tijang Kota Agung Province : Lampung Cancelled from the WINRIP Program.10. Monitoring Report of the LARAP Package No. 10 : Sp. Empat Sp. Air Balam
Province : Sumatera Barat A. Previous Status : • LARAP documents submitted to World Bank on August 7, 2014. • LARAP documents approved by World Bank on August 12, 2014. • Compensation payments for 1,615 from the total 2,951 PAPs already paid and Monitoring Report for payment of 1,421 PAPs has been submitted to World Bank on January 14, 2016 and Bank issued No Objection Letter NOL on March 8, 2016. B. Pending Issues, Concern and Actions a Payments for the remaining 1,190 PAPs not yet paid by PPKSatker PJN I West Sumatera and Local Government. C. Update during this reporting month of April 2016 a Monitoring Report for payment of 138 PAPs on-going preparation by Satker PJN I Sumatera BaratCTC. b PPKSatker PJN I West Sumatera and Local Government continue the appraisal and payment proceessing of the remaining PAP. c Total PAP = 2,915 ; Compensated = 1,725 ; Percent complete = 59,18.11. Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
Province : Bengkulu A. Previous Status : • World Bank issued on May 30, 2014 a No Objection Letter NOL on the revised LARAP documents for implementation. • Monitoring Report No.1 and No.2 were issued No Objection Letters NOL from the World Bank. • Monitoring Report for 15 of the remaining 123 PAPs was given No Objection Letter NOL on November 26, 2015 B. Pending Issues, Concern and Actions a No more issue. C. Update during this reporting month of April 2016 a Data collection for payment progress of the remaining 108 PAPs is being done by Satker PJN l Bengkulu. b Total PAP = 262 ; Compensated = 262 ; Percent complete =100.Parts
» WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» World Bank Implementation Review Mission and Site Visit
» Package No.10 Sp. Empat Sp. Air Balam AWP-2
» Package No.12 Kambang - Indrapura AWP-2
» Package No.16 Seblat-Ipuh AWP-3
» Package No.14 Painan - Kambang AWP-3
» Package No.20 Lubuk Alung - Sicincin AWP-3
» Package No.21 Lubuk Alung - Kuraitaji AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Background WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Project Development WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Project Objective WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» CTC Consultants WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» DSC Consultants WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Procurements WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Civil Works Progress WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» `-39.63 WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» 227CD Based on original contract
» -62.71 WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» 128 CD Based on original contract
» 492 CD Based on original contract 44.59
» 16.02 -6.64 WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» 652 CD Based on original contract
» 9.54 WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» -1.79 WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» 13 CD WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Quality Assurance WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Socialization of HIV-AIDs Campaign
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 14 : Painan - Kambang
» Monitoring Report of the LARAP Package No. 15 : Sibolga Bts. Tapsel
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Road Safety Audit WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Create and updated content of the WINRIP official website.
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
Show more