Western I ndonesia National Roads I mprovement Project 5 - 3 a. File Storage Server, used to stored all files of report and other document. Please check the URL address http:storage.winrip-ibrd.com . b. Document Management System DMS, used to record all information of letter and document files. The URL address of the DMS application will be at http:dms.winrip-ibrd.com . The DMS have 2 main modules below:

1. Letter Database System, used to record all information of incoming and

outgoing letter.

2. Document Library System, used to record all information of document and

report files. Western I ndonesia National Roads I mprovement Project 6 - 1 6 PROJECT PERFORMANCE

6.1 World Bank and GOI Compliance

6.1.1 World Bank Missions

During the month, there was no implementation review mission nor site visit. Also the regular monthly meeting to eview the implementation progress and monitoring of key activities on the Agreed Key Action Plans was not held during the period. 6.1.2 Agreed Key Actions and Mission Plans during Recent World Bank Mission A list of the key actions monitored during the period are listed below. No. Action By Whom Updated Status March 29, 2016 New Deadlines 1. Review BERs of packages 14 and 16 Bank • April 1, 2016 2. Send signed contract extension of Package 4 to Bank PMU and CTC • Done 3. Send signed contract extension of Package 2 and 3 to Bank PMU and CTC • Mid of February • April 8, 2016 4. Submit signed contracts for packages 8 and 12 to Bank PMU and CTC • Done 5. Inform the Bank about the steps DGH has takenwill take in the case of the misrepresentation of facts in the bidding of Package 8 in response to the letter WINRIP265 of December 9, 2015. If DGH is not taking any steps, please inform as also PMU and CTC • Consultation with Legal Department ongoing As soon as possible 6. Inform the Bank the bidding process of package 10 PMU and CTC • February 1, 2016 • April 8, 2016 7. Send to Bank response to letter WINRIP 279 of January 12, 2016 regarding the extension of bid validities PMU and CTC • Done 8. Inform the Bank about the plans regarding the Slope Protection in Package 3 PMU, CTC, DSC, WB • May 15, 2016 9. Send technical support documents for contract modification of package 6 40 increase to Bank PMU and CTC • Done 10. Inform the Bank about DGH s plans to cover the additional drainage and slope protection requirements under package 19 PMU and CTC • May 15, 2016 11. Send a letter to DGH regarding the swamp area in package 19 Bank • April 8, 2016 12. Publish the Request for Manifestation of Interest for the slope stabilization, design, and management for the Bank s review Subdit Construction Geotechnic and Stability and CTC • February 1, 2016 • Once the Bank approves the e- procurement system 13. Send the RfP for the slope stabilization, design, and management to Bank for NOL PMU and CTC • Done • End of April 2016 14. Send to the Bank the request for the extension of the CTC contract PMU and CTC • Done 15. Send to the Bank the response related to the contract modification to the DSC contract end date December 2016 PMU and CTC • End of Feb 2016 • Mid-April 2016 16. Send to the Bank an update of the environmental monitoring table in annex 4, including the information on the quarries PMU and CTC • End of April 2016 17. Send the environmental management and monitoring plans RKPPL for packages 5 and 17 to the Bank PMU and CTC • RKPPL package 0517 will be submit on mid of Feb 2016 • End of April 2016