492 CD Based on original contract 44.59

Western I ndonesia National Roads I mprovement Project 4 - 6 However, in the event that the recently concluded Field Engineering results with proposed 90 calendar days time extension will be formally approved, the completion date will be moved forward to August 31, 2016. ANNEX P-6 Executive Summary Report shows the complete details of the contract package. Package No. 7: Indrapura Tapan During the period from the issuance of Notice To Proceed NTP until end of this month, Contractor concentrated on the preparation for mobilization at site and finalization of the Field Engineering. During the period only small percentages of the General, Structure and Routine Maintenance works have been done accumulating to just 0.80 progress since the issuance of Notice To Proceed on December 10, 2015. ANNEX P-7 Executive Summary Report shows the complete details of the contract package. Package No. 8 : Bts. Kota Pariaman - Manggopoh Notice To Proceed NTP to commence the works has been issued on March 23, 2016. Pre-construction meeting was held on April 6, 2016 by formal ceremonies the following day, April 7, 2016. During the month, the Contractor s concentrations were preparation of mobilizing manpower and equipment. As the month ended, the actual physicalwork progress achieved is 0,27, which at the moment the progress is ahead of schedule by 0.18. Package No. 11 : Bantal - Mukomuko Based on the revised schedule due to approval of the results of Field Engineering , the actual overall progress attained by the Contractor up to end of this period is 44.59 against 51.45. At the end of the 14 th month of the contract period, Contractor s performance with respect to their work progress seem to be satisfactory as the negative slippage have been minimized to a single digit which is easily manageable. In other words, the Contractor have no difficulty in completing the works on or before the target date completion February 11, 2017. For more details of the Contract Package, refer to ANNEX P-11 Executive Summary Report . Package No. 13 : Sp. Rukis Tj. Kemuning The current work progress showed sign of slowing down for the past four 4 months as only 1.40 progress has been achieved during this period. At the end of the month, the overall work accomplished is 16.02 of the 33.58 schedule at month s end. The negative slippage farther dropped from -12.32 in the preceeding month to -17.56 this month.