Monitoring Report of the LARAP Package No. 7
12. Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
Province : Sumatera Barat A. Previous Status : • LARAP documents approved by World Bank on October 14, 2014. • Signed Action Plan of LARAP was given No Objection Letter NOL by the World Bank. B. Pending Issues, Concern and Actions a Compensation payments to PAPs are under going finalization by Satker PJN ll West Sumatera . C. Update during this reporting month of April 2016 a No update this month. b Total PAP = 2,337 ; Compensated = nil ; Percent complete = 0.13. Monitoring Report of the LARAP Package No. 13 : Sp. Rukis Tj. Kemuning
Province : Bengkulu A. Previous Status : • World Bank issued on May 30, 2014 a No Objection Letter NOL on the revised LARAP documents for implementation. • Signed Action Plan of LARAP was given No Objection Letter NOL by the World Bank. • World Bank issued on August 18, 2015 No Objection Letter NOL on the monitoring Report No.1. • World Bank issued on October 13, 2015 No Objection Letter NOL on the monitoring Report No.2. • Monitoring Report No.3 for compensation payments of 193 PAPs in Kab. Kaur submitted to WB which was submitted on February 23, 2016 has been issued by the Bank the NOL on March 8, 2016. B. Pending Issues, Concern and Actions a Compensation payments for 3,030 PAPs can be started upon completion of the revision of DIPA 2016. C. Update during this reporting month of April 2016 a Revision of DIPA 2016 amounting to RP. 14 Billion is under process. b Total PAP = 3,412 ; Compensated = 625 ; Percent complete = 18,32.14. Monitoring Report of the LARAP Package No. 14 : Painan - Kambang
Province : Sumatera Barat A. Previous Status : • World Bank issued on December 19, 2014 the No Objection Letter to the LARAP documents. • LARAP s signed action plan was given No Objection Letter NOL by World Bank. B. Pending Issues, Concern and Actions a Process of compensation payment is on-going. C. Update during this reporting month of April 2016 a Compensation payment process preparation.Parts
» WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» World Bank Implementation Review Mission and Site Visit
» Package No.10 Sp. Empat Sp. Air Balam AWP-2
» Package No.12 Kambang - Indrapura AWP-2
» Package No.16 Seblat-Ipuh AWP-3
» Package No.14 Painan - Kambang AWP-3
» Package No.20 Lubuk Alung - Sicincin AWP-3
» Package No.21 Lubuk Alung - Kuraitaji AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Background WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Project Development WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Project Objective WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» CTC Consultants WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» DSC Consultants WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Procurements WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Civil Works Progress WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» `-39.63 WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» 227CD Based on original contract
» -62.71 WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» 128 CD Based on original contract
» 492 CD Based on original contract 44.59
» 16.02 -6.64 WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» 652 CD Based on original contract
» 9.54 WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» -1.79 WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» 13 CD WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Quality Assurance WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Socialization of HIV-AIDs Campaign
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 14 : Painan - Kambang
» Monitoring Report of the LARAP Package No. 15 : Sibolga Bts. Tapsel
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Road Safety Audit WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» Create and updated content of the WINRIP official website.
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION