Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
7. Monitoring Report of the LARAP Package No. 7
: Indrapura - Tapan Province : Sumatera Barat A. Previous Status : • CTC received the Draft Final LARAP documents from Balai IIP2JN on January 2014 • After CTC s review of the documents, comments were transmitted in the form of a MEMO DINAS to Balai II thru the Directorate of Implementation in Region I. • CTC received the correctedrevised LARAP documents from BALAI IIP2JN on June 2014. B. Pending Issues, Concern and Actions a LARAP Implementation Report to be prepared and submitted to PMUCTC for review. b No allocated budget in 2014 for payment of land acquisition. C. Update during this reporting month of October 2014 a LARAP documents approved by World Bank on October 14, 2014. b Implementation cost of LARAP will be included by Local Government in the 2015 budget.8. Monitoring Report of the LARAP Package No. 8
: Bts. Pariaman - Manggopoh Province : Sumatera Barat A. Previous Status : • CTC received the Draft Final LARAP documents from Balai II Padang on August 1, 2013 • CTC reviewed the documents with comments transmitted to PMU on September 9, 2013 and PMU forwarded to P2JNLocal Consultants the CTC s comments requesting the documents for revision in line with CTC s comments. • Revised LARAP documents from P2JN Consultant resubmitted in June 2014. • CTC received the correctedrevised LARAP documents from BALAI IIP2JN on June 2014. • LARAP documents submitted to World Bank on August 7, 2014. • LARAP documents approved by World Bank on August 12, 2014. B. Pending Issues, Concern and Actions a Monitoring Report of LARAP implementation still to be prepared for submission and review by the World Bank. C. Update during this reporting month of October 2014 a Implementation cost of LARAP will be included by the Local Government in the 2015 budget. Monthly Progress Report October 2014 Western I ndonesia National Roads I mprovement Project 329. Monitoring Report of the LARAP Package No. 9
: Rantau Tijang Kota Agung Province : Lampung A. Previous Status : • LARAP documents are still to be prepared. B. Pending Issues, Concern and Actions a Still no issues and concerns. C. Update during this reporting month of October 2014 a Nothing to report this period.10. Monitoring Report of the LARAP Package No. 10
Parts
» WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Visit WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Package 17 Sp. Gunung Kemala
» Package 13 Sp. Rukis Procurement
» Packages 5 Simpang Rampa Procurement
» Package No.19 Lais Procurement
» Package No. 15 Sibolga Procurement
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Project Development WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» CTC Consultants WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» DSC Consultants WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Procurements WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 11.28 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 25.61 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 14.45 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» - 18.88 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 1 Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3 Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5 Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7 Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9 Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14
» Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Management Information System WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» Quality Assurance Project Risks and Mitigation Measures
» Current Situation WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Actions Required WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 2.35 0.22 0.84 - - 0.57 0.09 5.99 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 1.59 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 3.74 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 1.58 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 1.10 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.47 - WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 3.47 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.88 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 13.85 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» - Late of Field Engineering Decision 1.35 1.10 2.51 - - 0.56
» 0.56 - WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.03 - - - WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.06 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» -15.65 -18.88 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 2.35 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.22 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.84 - - WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.57 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.09 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 5.99 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 1.59 3.74 1.58 1.10 0.47 - 3.47 0.88 13.85 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 1.35 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 2.51 - - WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
Show more