Current Situation WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
10.46 1.59
2.15 3.74
4.89 II D r a i n a g e3.53 1.58
0.80 2.37
3.39 III Earthworks4.44 1.10
0.21 1.32
2.32 IV Pavement Widening Shoulders2.26 0.47
0.48 0.95
- V Granular Pavement 10.490.29 0.34
0.63 3.53
VI Asphalt Pavement52.09 -
- - 1.33 VII S t r u c t u r e s14.35 3.47
0.14 3.61
4.71 VIII Reinstatement Minor Works1.65 0.88
0.04 0.92
0.10 IX Day Work0.12 -
- - 0.04 X Routine Maintenance Works0.62 0.31
0.01 0.32
0.32 TOTAL
100.00 9.694.17 13.85
20.63 Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Schedl Progress Original 0.45 0.90 2.20 3.45 7.17 13.58 17.48 20.63 27.88 33.56 38.81 44.72 50.52 56.13 62.58 69.25 73.65 79.35 82.91 85.94 90.59 93.85 97.89 100.00 Actual Progress - 0.13 1.02 2.19 4.11 5.96 9.69 13.85 Balance 0.45 0.77 1.17 1.26 3.07 7.62 7.80 6.78 2014 2015 - Late of Field Engineering Decision - DSC and Contractor to discuss with PPK - Contractor has insufficient manpower and finan- - The contractor have to add manpower aspecialy cial resource to excecute the available works for drainage work - Delayed land acquisition of Air Gadang Bridge - DSC ask partial land acquisition plan to PPK approach - Delayed of additional land acquisition - PPK should coordinate with respective agency - Delayed relocation of existing electrical pole - PPK should give notification to the utility company 197,936,699,000.00 regarding the finalization of the Field Engineering. August 25, 2014 PADANG SAWAH-SIMPANG EMPAT MAJOR PROBLEMS ACTION TO BE TAKEN EXECUTIVE SUMMARY REPORT Aug-14 PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS The month of time for complation DISBURSEMENT 14-Jul-14 20,211,284,785 02 T IM E A M O U N T RENARDET S.A JV 6-Jan-14 5-Jan-16 PHYSICAL WORK PROGRESS BY CATEGORY Div Description PHYSICAL PROGRESS MONITORING TABLE 10 20 30 40 50 60 70 80 90 100 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 P H Y S IC A L P R O G R E S THE MONTH OF TIME FOR COMPLATION PROGRESS SCHEDULE PACKAGE 02 Schedule Actual ANEXES EXECUTIVE SUMMARY REPORT edit 9 Sep 2014_50256C ExSum P-2Parts
» WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Visit WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Package 17 Sp. Gunung Kemala
» Package 13 Sp. Rukis Procurement
» Packages 5 Simpang Rampa Procurement
» Package No.19 Lais Procurement
» Package No. 15 Sibolga Procurement
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Project Development WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» CTC Consultants WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» DSC Consultants WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Procurements WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 11.28 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 25.61 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 14.45 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» - 18.88 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 1 Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3 Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5 Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7 Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9 Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14
» Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Management Information System WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» Quality Assurance Project Risks and Mitigation Measures
» Current Situation WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» Actions Required WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 2.35 0.22 0.84 - - 0.57 0.09 5.99 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 1.59 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 3.74 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 1.58 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 1.10 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.47 - WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 3.47 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.88 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 13.85 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» - Late of Field Engineering Decision 1.35 1.10 2.51 - - 0.56
» 0.56 - WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.03 - - - WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.06 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» -15.65 -18.88 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 2.35 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.22 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.84 - - WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.57 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 0.09 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 5.99 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 1.59 3.74 1.58 1.10 0.47 - 3.47 0.88 13.85 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 1.35 WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
» 2.51 - - WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
Show more