Loading of Parts into Fixtures

Part 2 ✈ Chapter 3 - Checklists Page 107 Part 2 - Airworthiness Audit Policy and Procedures MRA – 1 st Edition September 1998 References Result A-3 Is an inspection conducted for fitting and clamping in accordance with the process specifications? QPM OK FDG NA Items Certified – Completed by:

3.8.2.10 Certification and Control of Hot Presses, Autoclaves and Jigs References

Result A-1 Have the hot presses, autoclaves and jigs been approved? QPM OK FDG NA A-2 Are temperature uniformity surveys conducted and the results recorded? QPM OK FDG NA A-3 Are the clamping devices maintained in good condition? QPM OK FDG NA A-4 Are the temperature recorders calibrated? QPM OK FDG NA A-5 Are the timing devices calibrated? QPM OK FDG NA A-6 Does the equipment comply with the process specification requirements? QPM OK FDG NA Items Certified – Completed by:

3.8.2.11 Curing References

Result A-1 Are the temperature, pressure, time in and time out recorded during curing? QPM OK FDG NA A-2 Are the test specimens positioned and cured with the production run? QPM OK FDG NA Page 108 Part 2 ✈ Chapter 3 - Checklists MRA – 1st Edition September 1998 Part 2 ✈ Chapter 2 - Airworthiness Audit Policy and Procedures References Result A-3 Are the inspection results for test specimens recorded? QPM OK FDG NA A-4 Are the test specimens traceable to a specific production run? QPM OK FDG NA Items Certified – Completed by:

3.8.2.12 Inspection of Bonded Parts References

Result A-1 Are the laboratory results of test specimens verified for acceptability? QPM OK FDG NA A-2 Are all items inspected for conformance to the drawing and process specifications? QPM OK FDG NA A-3 Which non-destructive testing method is used during the final inspection? QPM OK FDG NA A-4 Is final acceptance based on documentary evidence of previous inspection acceptance, in addition to satisfactory results of test coupons and a final visualnon-destructive inspection? QPM OK FDG NA A-5 Do all bonding operations and equipment and comply with the requirements of the manufacturing bonding process? QPM OK FDG NA Items Certified – Completed by: