Radiographic Inspection Manufacturing Processes

Part 2 ✈ Chapter 3 - Checklists Page 127 Part 2 - Airworthiness Audit Policy and Procedures MRA – 1 st Edition September 1998 Items References Result A-5 Are appropriate penetrameters or image quality indicators available and in use? QPM OK FDG NA A-6 Are radioactive sources in use? QPM OK FDG NA A-7 Are the regulations governing the use of radioactive sources i.e. the Atomic Energy Control Act available to operators and inspectors? QPM OK FDG NA A-8 Is appropriate source and radiation-handling and radiation-shielding equipment available and in good condition? QPM OK FDG NA A-9 Are densitometers used? QPM OK FDG NA A-10 Do radiographs contain the following information: - the date of exposure; - the aircraft or part identification or serial number; - the inspection technique number; and - the film location and exposure identification? QPM OK FDG NA A-11 Are appropriately certified film interpretation reports available for each inspection? QPM OK FDG NA A-12 Are appropriate facilities and equipment available for film interpretation? QPM OK FDG NA A-13 Is film handled, processed and stored in accordance with the manufacturers recommendations? QPM OK FDG NA Page 128 Part 2 ✈ Chapter 3 - Checklists MRA – 1st Edition September 1998 Part 2 ✈ Chapter 2 - Airworthiness Audit Policy and Procedures Items References Result A-14 Are personnel qualified and their records up to date? QPM OK FDG NA Items Certified - Completed by:

3.8.23 Ultrasonic Inspection

Items References Result A-1 According to what standard is ultrasonic inspection being performed? Is it MIL-STD-1875 or 2154? QPM OK FDG NA A-2 How is the ultrasonic test equipment calibrated for each inspection conducted on: - a test piece; or - a calibration standard? QPM OK FDG NA A-3 Are a current distance-amplitude curve DAC and a linearity chart available? QPM OK FDG NA A-4 Are all parameters checked in accordance with the technical manual or inspection technique instructions before the inspection begins? QPM OK FDG NA A-5 Are test pieces properly identified and used at each inspection? QPM OK FDG NA A-6 Are partscomponents properly cleaned prior to ultrasonic testing? QPM OK FDG NA A-7 Is the equipment used for product acceptance calibrated to the reference standard or the equipment manufacturers specification by an accredited calibration laboratory? QPM OK FDG NA Part 2 ✈ Chapter 3 - Checklists Page 129 Part 2 - Airworthiness Audit Policy and Procedures MRA – 1 st Edition September 1998 Items References Result A-8 Are adequate quantities of transducers available and maintained in good condition? QPM OK FDG NA Items Certified – Completed by:

3.8.24 Non-Conforming Material Review Board MRB

Items References Result A-1 Does the Material Review Board MRB include representatives from the quality controlassurance and engineering departments? QPM OK FDG NA A-2 Does the company have a current list of approved MRB members? QPM OK FDG NA A-3 Are rejected partsmaterials tagged, identified and quarantined? QPM OK FDG NA A-4 Are partsmaterials considered scrap properly identified andor disposed of? QPM OK FDG NA A-5 Do MRB records include the part number, quantity, effectivity date, corrective action taken, description of defects and proper signature? QPM OK FDG NA A-6 Do parts requiring reworking comply with the engineering disposition? Are these parts re-inspected and recertified? QPM OK FDG NA Items Certified – Completed by: