ASET TETAP lanjutan FIXED ASSETS continued

CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN 30 JUNI 2012 Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain ____________________________________________________ PT KRAKATAU STEEL PERSERO Tbk NOTES TO THE INTERIM CONSOLIDATED FINANCIAL STATEMENTS JUNE 30, 2012 Expressed in millions of Rupiah, unless otherwise stated _________________________________________________ Catatan atas laporan keuangan konsolidasi terlampir merupakan bagian yang tidak terpisahkan dari laporan keuangan konsolidasi secara keseluruhan. The accompanying notes form an integral part of these consolidated financial statements. 73

12. ASET TETAP lanjutan

Hotel Tower 5 Lantai PT KIEC, Entitas Anak, tengah membangun Hotel Tower 5 lantai di Cilegon untuk memenuhi permintaan kamar hotel yang terus meningkat. Hotel tersebut direncanakan memiliki kapasitas 66 kamar. Pada tanggal 30 Juni 2012, proyek ini sudah selesai dan ditransfer ke asset tetap. Revitalisasi pabrik HSM Proyek revitalisasi pabrik baja lembaran panas “Hot Strip Mill, HSM” bertujuan untuk mengganti peralatan pabrik yang sudah berumur tua dengan peralatan baru yang memiliki teknologi modern untuk meningkatkan kapasitas produksi dari 2 juta ton HRC per tahun menjadi 2,4 juta ton HRC per tahun. Perusahaan telah menunjuk SMS Demag AG, Siemens AG, PT Siemens Indonesia, PT Lykamandiri dan Tenova-LOI S.p.A. Konsorsium untuk melaksanakan proyek tersebut. Nilai kontrak yang disepakati adalah sebesar EUR46.050.000 dengan masa konstruksi diperkirakan selama dua tahun. Pada tanggal 31 Desember 2011, proyek revitalisasi pabrik HSM ini telah selesai dan dipindahkan ke akun aset tetap. Pabrik Kapur II Pada tanggal 13 Juni 2011, perusahaan menandatangani kontrak pekerjaan proyek Lime Calcining Plant II dengan konsorsium PT. Truba Jaya Engineering dan Maerz Ofenbau AG dengan nilai kontrak sebesar US3.281.350 dan Rp. 21.521. Proyek ini bertujuan untuk membangun pabrik kapur yang baru dengan kapasitas 150 ton per hari untuk kebutuhan pabrik pembuatan baja milik perusahaan. Persentase penyelesaian proyek tersebut diperkirakan 20,75.

12. FIXED ASSETS continued

5 Stories Tower Hotel PT KIEC, a Subsidiary, is constructing a 5 stories hotel tower in Cilegon to meet the increasing demands for hotel rooms. The hotel is planned to have a capacity of 66 rooms. As of June 30, 2012, this project was completed and transferred to fixed asset. HSM plant revitalization Hot Strip Mill “HSM” plant revitalization project was aimed to replace old equipment with new equipment that has modern technology to increase production capacity from 2 million metric tons of HRC per year to 2.4 million metric tons of HRC per year. The Company has appointed SMS Demag AG, Siemens AG, PT Siemens Indonesia, PT Lykamandiri and Tenova-LOI S.p.A. Consortium to carry out the project. The agreed contract value amounted to EUR46,050,000 with the estimated construction period for two years. As of December 31, 2011, this HSM plant revitalization project was completed and transferred to fixed asset account. Lime Calcining Plant II On June 13, 2011, The Company Signed a Work contract for Lime Calcining Plant II project with the consortiumof PT Truba jaya Engineering and Maerz Ofenbau AG with a contract value US3,281,350 and Rp.21,521. The aim of the project is to built a new lime calcining plant with capacity of 150 ton per day to support the need of lime for steel making product of company. The percentage of completion of the project estimated 20.75. Aset tidak digunakan dalam operasi terdiri dari : Assets not used in operations consist of: 30062012 31122011 Tanah 21.135 21.019 Land Bangunan 3.704 2.635 Building Mesin 5.160 8.727 Machine Jumlah 29.998 32.381 Total Tanah, bangunan, mesin dan peralatan pabrik tertentu milik Perusahaan dan Entitas Anak tertentu digunakan sebagai jaminan atas fasilitas pinjaman yang diperoleh dari kreditur Catatan 14 dan 20. Land, buildings, machineries and certain manufacturing equipment of the Company and certain Subsidiaries are pledged as collateral for loans obtained from creditors Notes 14 and 20. CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN 30 JUNI 2012 Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain ____________________________________________________ PT KRAKATAU STEEL PERSERO Tbk NOTES TO THE INTERIM CONSOLIDATED FINANCIAL STATEMENTS JUNE 30, 2012 Expressed in millions of Rupiah, unless otherwise stated _________________________________________________ Catatan atas laporan keuangan konsolidasi terlampir merupakan bagian yang tidak terpisahkan dari laporan keuangan konsolidasi secara keseluruhan. The accompanying notes form an integral part of these consolidated financial statements. 74

12. ASET TETAP lanjutan