12. ASET TETAP lanjutan Revitalisasi pabrik SSP 1
Proyek revitalisasi pabrik pembuatan slab baja “Slab Steel Plant, SSP” 1 bertujuan untuk
mengganti peralatan pabrik yang sudah berumur tua dengan peralatan baru yang memiliki teknologi
modern untuk meningkatkan kapasitas produksi dari 1,0 juta ton tidak diaudit slab menjadi 1,3 juta
ton tidak diaudit slab per tahun. Proyek ini meliputi penggantian Electric Arc Furnaces, Continuous
Casting Machine, Dedusting dan Water Treatment and Utility. Perusahaan telah menunjuk Siemens
VAI Metal Technologies GmbH, Siemens AG dan PT Siemens Indonesia untuk melaksanakan proyek
tersebut. Pada tanggal 31 Maret 2011, manajemen Perusahaan
memperkirakan persentase
penyelesaian revitalisasi pabrik SSP 1 ditinjau dari aspek keuangan adalah sebesar 32.71. Proyek
direncanakan selesai pada bulan Desember 2012.
Revitalisasi pabrik DR
Pabrik pembuatan besi spons “Direct Reduction, DR” Perusahaan terdiri dari fasilitas reduksi
langsung berbasis gas alam. Proyek revitalisasi pabrik DR meliputi modifikasi teknologi HYL III
menjadi Zero Reformer dan peningkatan kapasitas produksi dari 1,5 juta ton tidak diaudit besi spons
direct reduced iron menjadi 1,74 juta ton tidak diaudit besi spons per tahun. Berkaitan dengan
proyek
revitalisasi ini,
Perusahaan telah
menandatangani perjanjian lisensi dan bantuan teknis dengan HYLSA, S.A de C.V dan kontrak
pekerjaan Migration Automation System of HYL III dengan PT Honeywell Indonesia. Pada tanggal 31
Maret
2011, manajemen
Perusahaan memperkirakan
persentase penyelesaian
revitalisasi pabrik DR ditinjau dari aspek keuangan adalah sebesar 50,90. Proyek direncanakan
selesai pada bulan Januari 2012. Pembangunan pabrik besi
Perusahaan, melalui PT MJIS, tengah membangun fasilitas pembuatan besi spons iron making di
Batulicin, Kalimantan Selatan. Fasilitas tersebut akan menggunakan biji besi lokal dengan teknologi
berbasis batubara untuk mendukung upaya Perusahaan dalam mengurangi ketergantungan
terhadap impor biji besi. Fasilitas tersebut direncakan memiliki kapasitas produksi sebesar
315.000 ton besi spons per tahun. Pada tanggal 31 Maret 2011, manajemen PT MJIS memperkirakan
persentase penyelesaian proyek ini ditinjau dari aspek keuangan adalah sebesar 90,19 yang
diperkirakan
akan beroperasi
pada bulan
Agustus 2011.
12. FIXED ASSETS continued SSP 1 plant revitalization
Slab Steel Plant “SSP” 1 revitalization project was aimed to replace old equipment with new
equipment that has modern technology to increase production capacity from 1.0 million metric tons
unaudited of slab to 1.3 million metric tons unaudited of slab per year. This project involves
the replacement of Electronic Arc Furnaces, Continuous Casting Machine, Dedusting and Water
Treatment and Utility. The Company has appointed Siemens VAI Metal Technologies GmbH, Siemens
AG and PT Siemens Indonesia to carry out the project. As of March 31, 2011, the Companys
management estimates that the percentage of completion of SSP 1 revitalization in financial terms
is 32,71 unaudited. The project is expected to be completed in December 2012.
DR plant revitalization
The Company‟s sponge iron manufacturing Direct Reduction, DR facility consists of natural gas-
based direct reduction plant. DR plant revitalization project includes the modification of HYL III
technology to Zero Reformer and the expansion of production capacity from 1.5 million metric tons
unaudited of sponge iron direct reduced iron to 1.74 million metric tons unaudited of sponge iron
per year. In relation to this revitalization project, the Company has signed a license agreement and
technical assistance with HYLSA, S.A de C.V and a work contract of Migration Automation System of
HYL III with PT Honeywell Indonesia. As of March 31, 2011, the Companys management
estimates that the percentage of completion of DR plant revitalization in financial terms is 50,90. The
project is expected to be completed in January 2012.
Ironmaking plant The Company, through PT MJIS, is constructing an
ironmaking facility in Batulicin, South Kalimantan. The facility will utilize local iron ore with coal-based
technology to support the Company‟s effort to reduce its dependency on imported iron ore. The
facility is planned to have a production capacity of 315,000 metric tons of sponge iron per year. As of
March 31, 2011, the management of PT MJIS estimates the percentage of completion of this
project in financial terms is 90,19, which is expected to operate in August 2011.
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI
31 Maret 2011 Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain
____________________________________________________ PT KRAKATAU STEEL PERSERO Tbk
NOTE TO THE CONSOLIDATED FINANCIAL STATEMENTS
March 31, 2011 Expressed in millions of Rupiah, unless otherwiss stated
_________________________________________________
53
12. ASSET TETAP lanjutan