PERSEDIAAN lanjutan Acquisition of control over TTS and its

PT ADARO ENERGY Tbk DAN ENTITAS ANAKNYAAND ITS SUBSIDIARIES Lampiran 565 Schedule CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN PADA TANGGAL DAN UNTUK TAHUN-TAHUN YANG BERAKHIR PADA TANGGAL 31 DESEMBER 2016 DAN 2015 Dinyatakan dalam ribuan Dolar AS, kecuali dinyatakan lain NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS AS AT AND FOR THE YEARS ENDED 31 DECEMBER 2016 AND 2015 Expressed in thousands of US Dollars, unless otherwise stated

10. ASET TETAP lanjutan

10. FIXED ASSETS continued

Pada tanggal 31 Desember 2016 dan 2015, seluruh aset sewa pembiayaan dijaminkan terhadap utang sewa pembiayaan Catatan 19 dan tidak ada aset tetap kepemilikan langsung yang dijaminkan. As at 31 December 2016 and 2015, all leased assets were pledged for finance leases payable Note 19 and there are no directly owned fixed assets that have been pledged. Lihat Catatan 34 untuk rincian transaksi dan saldo dengan pihak berelasi. Refer to Note 34 for details of transactions and balances with related parties. Aset dalam penyelesaian Construction in progress Aset dalam penyelesaian merupakan proyek yang belum selesai pada tanggal laporan posisi keuangan konsolidasian dengan rincian sebagai berikut: Construction in progress represents projects that were not completed as at the date of the consolidated statements of financial position as follows: Persentase Akumulasi Estimasi penyelesaian biaya penyelesaian Percentage of Accumulated Estimated Construction Aset dalam penyelesaian completion costs completion in progress 31 DesemberDecember 2016 Fasilitas peremukan dan Januari 2017 - Oktober Crushing and pengolahan 72 - 99 20,844 2017January 2017 - handling facilities October 2017 Jalan dan jembatan 10 - 98 39,339 Februari 2017 - Januari Roads and bridges 2019February 2017 - January 2019 Lain-lain masing-masing Others each below di bawah AS10.000 1 - 98 43,655 BervariasiVarious US10,000 Total 103,838 Total 31 DesemberDecember 2015 Overburden crushing dan Overburden crushing and conveying system “OPCC” 241,740 conveying system “OPCC” Fasilitas peremukan dan Januari - Juni Crushing and pengolahan 2 - 98 18,428 2016January - handling facilities June 2016 Jalan dan jembatan 5 - 98 14,738 Januari - Desember Roads and bridges 2016January - December 2016 Lain-lain masing-masing Others each below di bawah AS10.000 5 - 95 29,467 BervariasiVarious US10,000 Total 304,373 Total Pada tanggal 31 Desember 2016 dan 2015, manajemen Grup berpendapat bahwa tidak ada indikasi penurunan nilai aset tetap. As at 31 December 2016 and 2015, the Group’s management is of the opinion that there, was no indication of impairment in the fixed assets value. Per tanggal 31 Desember 2015, konstruksi fisik OPCC telah selesai dan sedang dalam tahap pengujian untuk prosedur tertentu sebagaimana ditentukan dalam perjanjian. As at 31 December 2015, the physical construction of the OPCC had been completed and it was at certain testing procedures as required under the contract.