Perjanjian Guaranteed Bridge Facility
39. PERJANJIAN
PENTING, IKATAN, DAN KONTINJENSI lanjutan39. SIGNIFICANT
AGREEMENTS, COMMITMENTS AND CONTINGENCIES continued y. Proses arbitrase MSW-PTPLI dan PLPL lanjutany. Arbitration process of MSW-PTPLI and
PLPL continued Klaim dari PTPLI dan PLPL dianggap dibatalkan setelah mereka gagal dalam melakukan pembayaran atas administrasi SIAC dan biaya arbiter pada September 2015, MSW melanjutkan dengan klaim baliknya kepada PTPLI dan PLPL sebesar €11.460.772 nilai penuh, Rp52.860.364.646 nilai penuh dan AS56.055 nilai penuh dan PTPLI dan PLPL mengklaim balik dengan set- off sebesar €21.355.895 nilai penuh dan Rp26.314.709.461 nilai penuh. Terjadi penundaan sementara untuk proses arbitrase melawan PLPL dikarenakan PLPL ditetapkan dalam Judicial Management di Singapura pada tanggal 27 Juni 2016. MSW mengajukan seluruh permohonan yang diperlukan dan berpartisipasi dalam proses pemeriksaan sebagaimana ditetapkan sebelum tahap pembuktian. PTPLI tidak berpartisipasi dalam proses pemeriksaan dan hanya mengajukan suatu rancangan keterangan saksi pada tanggal 7 September 2016 sebelum tahap pembuktian. PTPLIs and PLPLs claims were deemed withdrawn after they failed to make payment of SIAC administration and arbitrators’ fees in September 2015, MSW proceeded with its claims against PTPLI and PLPL in the amounts of €11,460,772 full amount, Rp52,860,364,646 full amount and US56,055 full amount and PTPLI and PLPL counterclaimed by way of set-off only, the amounts of €21,355,895 full amount and Rp26,314,709,461 full amount. An interim stay of the arbitration proceedings against PLPL was granted as PLPL was put into Judicial Management in Singapore on 27 June 2016. MSW filed all necessary pleadings and participated in the discovery process as directed before the hearing. PTPLI failed to participate in the discovery process and only filed a draft witness statement on 7 September 2016 before the hearing. Sidang arbitrase berlokasi di Singapura pada tanggal 12, 13, dan 17 Oktober 2016. PTPLI tidak memanggil saksi selama sidang arbitrase. Seluruh pihak melakukan penyerahan Closing Written Submissions dan Reply Closing Written Submissions. Sampai dengan tanggal penyelesaian laporan keuangan konsolidasian ini, proses arbitrase masih berlangsung. The arbitration hearing took place in Singapore on 12, 13 and 17 October 2016. PTPLI did not call any witnesses during the arbitration hearing. Parties were directed to file their Closing Written Submissions and Reply Closing Written Submissions. Up to the completion date of these consolidated financial statements, the arbitration proceeding is still on going.40. JAMINAN REKLAMASI
40. RECLAMATION GUARANTEE
Pada tanggal 20 Desember 2010, Pemerintah Indonesia mengeluarkan peraturan implementasi atas Undang-Undang Mineral No. 42009, yaitu PP No. 78 yang mengatur aktivitas reklamasi dan pasca tambang untuk pemegang IUP-Eksplorasi dan IUP-Operasi Produksi. On 20 December 2010, the Government of Indonesia released an implementing regulation for Mining Law No. 42009, i.e. GR No. 78 that deals with reclamations and post-mining activities for both IUP-Exploration and IUP-Production Operation holders. Pemegang IUP-Eksplorasi, ketentuannya antara lain, harus memuat rencana reklamasi di dalam rencana kerja dan anggaran biaya eksplorasinya dan menyediakan jaminan reklamasi berupa deposito berjangka yang ditempatkan pada bank pemerintah. An IUP-Exploration holder, among other requirements, must include a reclamation plan in its exploration work plan and budget and provide a reclamation guarantee in the form of a time deposit placed at a state-owned bank.Parts
» Investasi Joint Venture Perubahan regulasi Joint Venture Investment
» Regulatory changes Cadangan batubara
» Coal reserves Gangguan bisnis Kepatuhan terhadap hukum dan peraturan Business interruption
» 12.4 27.2 Pendirian AR ADARO 2016 Final
» UMUM lanjutan GENERAL continued
» Pendirian AR ADARO 2016 Final
» Establishment of the Company and other
» Struktur grup AR ADARO 2016 Final
» Struktur grup lanjutan AR ADARO 2016 Final
» Perjanjian AR ADARO 2016 Final
» Perjanjian Kerjasama AR ADARO 2016 Final
» UMUM lanjutan Cooperation Agreement
» GENERAL continued Cooperation Agreement
» Perjanjian Kerjasama lanjutan AR ADARO 2016 Final
» Cooperation Agreement continued AR ADARO 2016 Final
» Perjanjian Kerjasama Alur Barito
» UMUM lanjutan Barito Channel Cooperation Agreement
» GENERAL continued Barito Channel Cooperation Agreement
» Izin Usaha Pertambangan AR ADARO 2016 Final
» UMUM lanjutan Mining Business Permits
» GENERAL continued Mining Business Permits
» Izin Usaha Pertambangan lanjutan
» IKHTISAR KEBIJAKAN AKUNTANSI PENTING SUMMARY OF SIGNIFICANT ACCOUNTING
» Dasar penyusunan laporan keuangan
» IKHTISAR KEBIJAKAN AKUNTANSI PENTING
» Dasar penyusunan laporan keuangan Perubahan
» Prinsip-prinsip konsolidasi Principles of consolidation
» Entitas anak AR ADARO 2016 Final
» Subsidiaries AR ADARO 2016 Final
» 1. Konsolidasi 1. Consolidation AR ADARO 2016 Final
» Principles of consolidation continued i.
» Prinsip-prinsip konsolidasi lanjutan AR ADARO 2016 Final
» Principles of consolidation continued
» Foreign currency translation AR ADARO 2016 Final
» Mata uang fungsional dan penyajian
» Penjabaran mata uang asing lanjutan
» Receivables AR ADARO 2016 Final
» Persediaan AR ADARO 2016 Final
» Persediaan lanjutan AR ADARO 2016 Final
» Inventories continued AR ADARO 2016 Final
» Aset keuangan AR ADARO 2016 Final
» Financial assets AR ADARO 2016 Final
» Aset keuangan lanjutan AR ADARO 2016 Final
» Financial assets continued AR ADARO 2016 Final
» Derivative AR ADARO 2016 Final
» Lindung nilai atas nilai wajar
» Aset tetap AR ADARO 2016 Final
» Aset tetap lanjutan AR ADARO 2016 Final
» Fixed assets continued AR ADARO 2016 Final
» Goodwill AR ADARO 2016 Final
» Goodwill lanjutan AR ADARO 2016 Final
» Goodwill continued AR ADARO 2016 Final
» Penurunan nilai dari aset non-keuangan
» Aset eksplorasi dan evaluasi
» Aset eksplorasi dan evaluasi lanjutan
» Exploration AR ADARO 2016 Final
» Properti pertambangan AR ADARO 2016 Final
» Properti pertambangan lanjutan AR ADARO 2016 Final
» Biaya pengupasan tanah AR ADARO 2016 Final
» Biaya pengupasan tanah lanjutan
» Stripping costs continued AR ADARO 2016 Final
» Utang usaha AR ADARO 2016 Final
» Trade payables AR ADARO 2016 Final
» Sewa lanjutan AR ADARO 2016 Final
» Leases continued AR ADARO 2016 Final
» Provision AR ADARO 2016 Final
» Provisi pembongkaran, reklamasi, dan
» Provisi lanjutan AR ADARO 2016 Final
» Provision continued AR ADARO 2016 Final
» Pinjaman AR ADARO 2016 Final
» Biaya pinjaman AR ADARO 2016 Final
» Borrowing costs AR ADARO 2016 Final
» Imbalan kerja karyawan AR ADARO 2016 Final
» Employee benefits AR ADARO 2016 Final
» Imbalan pasca kerja AR ADARO 2016 Final
» Imbalan kerja karyawan lanjutan
» Employee benefits continued AR ADARO 2016 Final
» Imbalan pasca kerja lanjutan
» Post-employment benefits continued AR ADARO 2016 Final
» Modal saham AR ADARO 2016 Final
» Earnings per share AR ADARO 2016 Final
» Pembagian dividen AR ADARO 2016 Final
» Dividend distributions AR ADARO 2016 Final
» Kombinasi bisnis entitas sepengendali
» Business combinations of entities under
» Pengakuan pendapatan dan beban
» Pengakuan AR ADARO 2016 Final
» Penjualan batubara AR ADARO 2016 Final
» ESTIMASI DAN PERTIMBANGAN AKUNTANSI CRITICAL
» ESTIMASI DAN PERTIMBANGAN AKUNTANSI
» ESTIMASI DAN PERTIMBANGAN AKUNTANSI KOMBINASI BISNIS
» KOMBINASI BISNIS lanjutan Acquisition of control over AMC
» BUSINESS COMBINATIONS continued Acquisition of control over AMC
» Akuisisi pengendalian atas AMC Akuisisi pengendalian atas AMC lanjutan
» KOMBINASI BISNIS lanjutan Acquisition
» BUSINESS COMBINATIONS continued Acquisition
» Akuisisi pengendalian atas AMC lanjutan
» Acquisition AR ADARO 2016 Final
» Akuisisi pengendalian atas TTS dan entitas anaknya
» KOMBINASI BISNIS lanjutan Acquisition of control over TTS and its subsidiaries
» BUSINESS COMBINATIONS continued Acquisition of control over TTS and its subsidiaries
» Akuisisi pengendalian atas TTS dan entitas anaknya lanjutan
» CASH AND CASH EQUIVALENTS continued
» DEPOSITO Acquisition of control over TTS and its
» RESTRICTED TIME DEPOSITS Acquisition of control over TTS and its
» RESTRICTED TIME DEPOSITS continued
» PIUTANG USAHA Acquisition of control over TTS and its
» TRADE RECEIVABLES Acquisition of control over TTS and its
» PIUTANG USAHA lanjutan Acquisition of control over TTS and its
» TRADE RECEIVABLES continued Acquisition of control over TTS and its
» UANG MUKA DAN BIAYA DIBAYAR DIMUKA
» ADVANCES AND PREPAYMENTS Acquisition of control over TTS and its
» PERSEDIAAN Acquisition of control over TTS and its
» INVENTORIES Acquisition of control over TTS and its
» PERSEDIAAN lanjutan Acquisition of control over TTS and its
» INVENTORIES continued ASET TETAP FIXED ASSETS
» ASET TETAP lanjutan Acquisition of control over TTS and its
» FIXED ASSETS continued Acquisition of control over TTS and its
» INVESTASI PADA ENTITAS ASOSIASI DAN
» PROPERTI PERTAMBANGAN Acquisition of control over TTS and its
» MINING PROPERTIES Acquisition of control over TTS and its
» GOODWILL Acquisition of control over TTS and its
» GOODWILL lanjutan Acquisition of control over TTS and its
» GOODWILL continued Acquisition of control over TTS and its
» UTANG USAHA Acquisition of control over TTS and its
» TRADE PAYABLES Acquisition of control over TTS and its
» UTANG USAHA lanjutan Acquisition of control over TTS and its
» TRADE PAYABLES continued Acquisition of control over TTS and its
» UTANG ROYALTI Acquisition of control over TTS and its
» ROYALTIES PAYABLE Acquisition of control over TTS and its
» BEBAN YANG MASIH HARUS DIBAYAR
» ACCRUED EXPENSES Acquisition of control over TTS and its
» INSTRUMEN KEUANGAN DERIVATIF Acquisition of control over TTS and its
» DERIVATIVE FINANCIAL INSTRUMENTS Acquisition of control over TTS and its
» INSTRUMEN KEUANGAN DERIVATIF lanjutan
» DERIVATIVE Acquisition of control over TTS and its
» UTANG SEWA PEMBIAYAAN Acquisition of control over TTS and its
» FINANCE LEASE PAYABLES Acquisition of control over TTS and its
» UTANG SEWA PEMBIAYAAN lanjutan
» FINANCE LEASE PAYABLES continued UTANG BANK BANK LOANS
» UTANG BANK lanjutan BANK LOANS continued
» Perjanjian Fasilitas AS1.000.000 AR ADARO 2016 Final
» Perjanjian Fasilitas AS1.000.000 lanjutan
» US1,000,000 AR ADARO 2016 Final
» Perjanjian Fasilitas AS380.000 AR ADARO 2016 Final
» UTANG BANK lanjutan US380,000 Facility Agreement
» BANK LOANS continued US380,000 Facility Agreement
» Perjanjian Fasilitas AS380.000 lanjutan
» US380,000 Facility Agreement continued
» Perjanjian Fasilitas AS200.000 AR ADARO 2016 Final
» UTANG BANK lanjutan US200,000 Facility Agreement
» BANK LOANS continued US200,000 Facility Agreement
» Perjanjian Fasilitas AS200.000 lanjutan
» UTANG BANK lanjutan US200,000 Facility Agreement continued
» BANK LOANS continued US200,000 Facility Agreement continued
» Perjanjian Fasilitas AS120.000 AR ADARO 2016 Final
» UTANG BANK lanjutan US120,000 Facilities Agreement
» BANK LOANS continued US120,000 Facilities Agreement
» Perjanjian Fasilitas AS120.000 lanjutan
» LIABILITAS IMBALAN PASCA KERJA
» POST-EMPLOYMENT BENEFITS LIABILITIES US120,000 Facilities Agreement continued
» LIABILITAS IMBALAN PASCA KERJA lanjutan
» POST-EMPLOYMENT US120,000 Facilities Agreement continued
» PROVISI US120,000 Facilities Agreement continued
» PROVISION US120,000 Facilities Agreement continued
» MODAL SAHAM US120,000 Facilities Agreement continued
» SHARE CAPITAL US120,000 Facilities Agreement continued
» MODAL SAHAM lanjutan US120,000 Facilities Agreement continued
» SHARE CAPITAL continued US120,000 Facilities Agreement continued
» TAMBAHAN MODAL DISETOR, NETO
» ADDITIONAL PAID-IN CAPITAL, NET
» SELISIH TRANSAKSI DENGAN PIHAK NON-
» DIVIDEN DIVIDENDS US120,000 Facilities Agreement continued
» DIVIDEN lanjutan US120,000 Facilities Agreement continued
» DIVIDENDS continued US120,000 Facilities Agreement continued
» KEPENTINGAN NON-PENGENDALI US120,000 Facilities Agreement continued
» NON-CONTROLLING INTERESTS US120,000 Facilities Agreement continued
» PENDAPATAN USAHA US120,000 Facilities Agreement continued
» REVENUE US120,000 Facilities Agreement continued
» BEBAN POKOK PENDAPATAN US120,000 Facilities Agreement continued
» COST OF REVENUE US120,000 Facilities Agreement continued
» BEBAN POKOK PENDAPATAN lanjutan
» BEBAN USAHA US120,000 Facilities Agreement continued
» OPERATING EXPENSES US120,000 Facilities Agreement continued
» PENDAPATANBEBAN LAIN-LAIN, NETO US120,000 Facilities Agreement continued
» OTHER INCOMEEXPENSES, NET PERPAJAKAN TAXATION
» Pajak dibayar dimuka AR ADARO 2016 Final
» Pajak yang bisa dipulihkan kembali
» PERPAJAKAN lanjutan TAXATION continued
» Utang pajak AR ADARO 2016 Final
» Taxes payable AR ADARO 2016 Final
» Beban pajak penghasilan AR ADARO 2016 Final
» Beban pajak penghasilan lanjutan
» Asetliabilitas pajak tangguhan AR ADARO 2016 Final
» PERPAJAKAN lanjutan Deferred tax assetsliabilities continued
» TAXATION continued Deferred tax assetsliabilities continued
» Asetliabilitas pajak tangguhan lanjutan Asetliabilitas pajak tangguhan lanjutan
» Deferred tax assetsliabilities continued
» Administrasi AR ADARO 2016 Final
» Administration AR ADARO 2016 Final
» Surat ketetapan pajak AR ADARO 2016 Final
» PERPAJAKAN lanjutan Tax assessment letters
» TAXATION continued Tax assessment letters
» Surat ketetapan pajak lanjutan
» PERPAJAKAN lanjutan Tax assessment letters continued
» TAXATION continued Tax assessment letters continued
» TRANSAKSI DAN SALDO DENGAN PIHAK
» Details of AR ADARO 2016 Final
» EARNINGS PER SHARE Key management compensation
» ASET DAN LIABILITAS MONETER NETO DALAM
» TRANSAKSI NON-KAS Key management compensation
» NON-CASH TRANSACTIONS Key management compensation
» SEGMEN OPERASI Key management compensation
» OPERATING SEGMENTS Key management compensation
» SEGMEN OPERASI lanjutan Key management compensation
» OPERATING SEGMENTS continued Key management compensation
» PERJANJIAN Key management compensation
» SIGNIFICANT AGREEMENTS, COMMITMENTS Key management compensation
» Perjanjian penambangan, pengangkutan, AR ADARO 2016 Final
» PERJANJIAN SIGNIFICANT AGREEMENTS, COMMITMENTS
» Coal mining, AR ADARO 2016 Final
» Perjanjian Kerjasama Penggunaan Tanah
» PERJANJIAN SIGNIFICANT Fasilitas bank
» Komitmen penjualan AR ADARO 2016 Final
» Sales commitments AR ADARO 2016 Final
» Pengeluaran modal AR ADARO 2016 Final
» Capital expenditure AR ADARO 2016 Final
» Pungutan penggunaan kawasan hutan
» Tuntutan hukum AR ADARO 2016 Final
» Perjanjian Fasilitas Bahan Bakar
» Peraturan Menteri No. 182009 AR ADARO 2016 Final
» Undang-Undang Pertambangan No. 42009 AR ADARO 2016 Final
» Peraturan Menteri No. 282009 AR ADARO 2016 Final
» Peraturan Menteri No. 282009 lanjutan
» Ministerial AR ADARO 2016 Final
» Peraturan Menteri No. 342009 AR ADARO 2016 Final
» Ministerial Regulation No. 342009 AR ADARO 2016 Final
» Peraturan Menteri No. 172010 lanjutan Ministerial
» Peraturan Menteri N 272013 Perjanjian sehubungan
» Contract in relation to the overburden
» Perjanjian Pembelian AR ADARO 2016 Final
» PERJANJIAN Long-term Power Purchase Agreement
» SIGNIFICANT AGREEMENTS, COMMITMENTS Long-term Power Purchase Agreement
» Perjanjian Guaranteed Bridge Facility
» SIGNIFICANT AGREEMENTS, COMMITMENTS Subordinated
» Overlapping land plots of PT Bhakti Energi
» PERJANJIAN Convertible loan and shares subscription
» SIGNIFICANT AGREEMENTS, COMMITMENTS Convertible loan and shares subscription
» Convertible loan and shares subscription
» PERJANJIAN Perjanjian Guaranteed Bridge Facility
» SIGNIFICANT Perjanjian Guaranteed Bridge Facility
» US136,000 Guaranteed Bridge Facility
» Perjanjian Post-FC Guaranteed Bridge
» Proses arbitrase MSW-PTPLI dan PLPL
» PERJANJIAN Arbitration process of MSW-PTPLI and
» SIGNIFICANT Arbitration process of MSW-PTPLI and
» JAMINAN REKLAMASI Arbitration process of MSW-PTPLI and
» RECLAMATION GUARANTEE Arbitration process of MSW-PTPLI and
» JAMINAN REKLAMASI lanjutan Arbitration process of MSW-PTPLI and
» RECLAMATION GUARANTEE continued Arbitration process of MSW-PTPLI and
» ASET DAN LIABILITAS KEUANGAN
» FINANCIAL ASSETS AND LIABILITIES MANAJEMEN RISIKO KEUANGAN FINANCIAL RISK MANAGEMENT
Show more