Amendment 9.7
6 126,219
Date
01-Feb-13 08-May-13
04-Apr-13 01-May-13
15-Jul-13 17-Sep-13
Amendment 20.9
7 83,752
Date
02-May-13 18-Jul-13
18-Sep-13 17-Sep-13
Amendment 19.5
7 184,714
Date
12-Aug-13 24-Oct-13
27-Sep-13
Amendment 46.8
7 161,963
Date
24-Jun-13 24-Oct-13
27-Sep-13
Amendment
Date
Amendment 61.7
7 252,629
Date
24-Jun-13 24-Oct-13
27-Sep-13
Amendment 50.1
6 224,090
Date
18-Mar-13 18-Jul-13
18-Sep-13 18-Jul-13
Amendment 55.2
7 316,306
Date
12-Aug-13 24-Oct-13
27-Sep-13
Amendment 56.3
7 287,549
Date
18-Mar-13 18-Jul-13
18-Sep-13 18-Jul-13
Amendment
Date
Amendment 36
7 353,956
Date
28-Mar-13 08-May-13
21-Aug-13 04-Apr-13
01-May-13 23-Sep-13
Amendment
Date
Amendment
Date
26-May-13
Amendment
Date
Amendment 10.8
7 32,623
Date
02-May-13 18-Jul-13
18-Sep-13 17-Sep-13
Amendment
Date
Amendment
Date Process
21 Lubuk Alung - Kuraitaji
Link No. 027.0 Original
16.8 7
65,778
20 Lubuk Alung – Sicincin
Link No.009.1 Original
14.6 7
54,557
Process
19 Lais - Bintuan
Link No.009.1 Original
11.6 7
37,558
Process
95 Technical
Review by CTC
70 Technical
Review by DSC
100 Technical
Review
by PPC Processed by Project Preparation Consultant
18 Mukomuko – Bts.Sumbar
Link No.015.3 Original
25.8 6
69,223
Process
15 Sibolga – Bts TapSel
Link No.016.1 Original
36 7
129,228
Process
97 Technical
Review by CTC
AWP-3 14
Painan – Kambang Link No.017.1
Original 31.5
7 118,993
Process
Processed by DSC
17 Sp.Gng Kemala–Pg.Tampak
Link No.061.1 Original
36.8 6
104,238
Process
16 Seblat – Ipuh
Link No.010.0 Original
34.5 6
110,237
Process
13 SP.Rukis - TJ.Kemuning
Link No.006.0 Original
56.3 7
225,481.5
Process
Technical Review
by CTC
12 Kambang – Indrapura
Link No.017.2 Original
55.2 7
171,948
Process
95 Technical
Review by DSC
97 Technical
Review by CTC
11 Bantal - Mukomuko
Link No.015.2 Original
50.1 6
157,820
Process
97
Processed by DSC
10 Sp.Empat – Sp. Air Balam
Link No.034.1 Original
61.7 7
241,617
Process
95 Technical
Review by DSC
Processed by DSC 95
Technical Review
by DSC Processed by DSC
8 Bts.Pariaman – Manggopoh
Link No.024.0 Original
46.8 7
183,268
Process
95 Technical
Review by DSC
Processed by DSC 97
Technical Review
by CTC
6 PS.Pedati - Kerkap
Link No.010.0 Original
25 7
72,019
Process
95 Technical
Review by CTC
AWP-2 5
Sp.Rampa – Poriaha Link No.015.xx
Original 11.1
6
Estimated Cost
Excl.VAT mil. RP
Technical Design Review Process for Design Stage
55,126
Process
7 Indrapura – Tapan
Link No.019.0 Original
19.5 7
96,921
Process
9 Rantau Tijang – Kota Agung
Link No.026.1 Original
42 7
149,831
Process
Approval By DTA
Total Process Remark
Status Received
Datum Post-Review
Site Visting Full-Review
Group Pkg
No. Name of Sub-project
ECL Length
km Width
m RSA
Audit Presentation
Discussion Techinical
Report Submission
Quality Assurance