Monitoring Report of the LARAP Package No. 1
5. Monitoring Report of the LARAP Package No. 5
: Sp. Rampa Poriaha Province : Sumatera Utara A. Previous Status : • Comments on LARAP documents by World Bank were transmitted to PMU on September 16, 2013 • On September 23, 2013 World Bank wrote letter to Director of Implementation Affairs thru SatkerPPK to revise the LARAP documents in line with their comments. • CTC in consultation with PMU prepared the revised LARAP documents and resubmitted it on November 6, 2013. • World Bank accepted the revised LARAP documents on November 12, 2013. • On November 18, 2013 the Director of Planning issued a letter to the Director of Implementation Affairs Region 1, that the LARAP documents can now be implemented in the acquisition of Right of Ways and removal of construction obstructions. B. Pending Issues, Concern and Actions a PMUCTC is awaiting the LARAP implementation Report from SATKER C. Update during this reporting month of September 2014 a No update this month6. Monitoring Report of the LARAP Package No. 6
: Pasar Pedati - Kerkap Province : Bengkulu A. Previous Status : • September 30, 2013, CTC received the LARAP documents from BBPJN III Palembang. • After CTC s review, PMU forwarded the documents to World Bank on November 13, 2013 requesting for No Objection Letter NOL. • Bank conducted their review and their comments were relayed to PMU thru letter on November 20, 2013. • On November 27, 2013, the World Bank sent letter to the Director of Planning to request the Director of Implementation Affairs thru SatkerPPK to revise the LARAP documents by incorporating their comments. • PMU resubmitted to the World Bank on January 9, 2014 the revised LARAP documents and was resubmitted again on May 21, 2014 due to some minor corrections. B. Pending Issues, Concern and Actions a LARAP s implementation still to be implemented by SATKER.Parts
» WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Package 17 Sp. Gunung Kemala Package 11 Bantal
» Package 13 Sp. Rukis Procurement
» Packages 5 Simpang Rampa Procurement
» Visit Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Project Development WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» CTC Consultants WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» DSC Consultants WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Procurements WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 8.60 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 22.55 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 12.43 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» - 16.35 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14
» Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Draw Downs and Future Costs Disbursement Management Information System
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» Rebuild The New File Storage Server 1 Background
» 2.35 0.22 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.84 - - 0.57 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.09 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 5.99 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 1.59 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 3.74 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 1.58 1.10 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.47 - WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 3.47 0.88 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 13.85 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.56 - WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.03 - - - WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.06 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» -30.39 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» -5.33 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
Show more