Procurements WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.

Monthly Progress Report September 2014 Western I ndonesia National Roads I mprovement Project 21

4.4 Civil Works Progress

All the 4 Contractors substantially completed their mobilization and construction of Base Camps in all packages have been completed. Other activities done during this month were staking out and repair and restoration of deteriorated existing pavements, roadway excavation, embankment formation, spreading of granular pavement for roadway widening, structural works construction of stone masonry side ditches, stockpiling of raw material, production of crush aggregates and other minor works. Progress status of the four 4 on-going civil work contracts as of this reporting period are shown in Table 4.2. Table 4.2 Program Contract Package Contractor Name of Road Target Progress Schedule Ending September 2014 Actual Progress Accomplished Slippage Time Elapsed AWP-1 1 Jaya Konstruksi Manggala Pratama Tbk Biha - Krui

33.99 8.60

- 30.39 41.41 2 Jaya Konstruksi Manggala Pratama Tbk Padang Sawah Sp.Empat incl.Air Gadang Brd

27.88 22.55

- 5.33 36.58 3 Jaya Konstruksi Manggala Pratama Tbk Manggopoh Padang Sawah

21.53 12.43

- 9.10 36.58 4 PT. Waskita Karya and PT. Mulya Turangga JO Ipuh - Bantal 21.72

3.73 - 16.35

36.03 At the end of this reporting month of September 2014, all the four 4 contract packages were still lagging behind schedule. The situation remains the same as in previous month as three 3 of the contract packages continue to follow a downward trend of delayed schedules, while the other one 1 Package No.2 showed signs of improvement to catch up with the schedule. With more than 35 contract time for each of the four 4 contract packages have elapsed, the Contractors will have hard time to deliver the Works on the target dates of completion, unless a realistic action plans or catch-up Schedules will be strictly implemented. Packages No. 1 : Biha Krui At the end of this month, there was no substantial work accomplished to reduce previous month slippage of -25.60, instead the behind works further slipped to 30.39. The major work items which brought down the slippage to highly alarming situation are the drainage works 17.39 and granular and asphalt pavements 15.22 which accounted for a total of 32.61 cummulative target schedule for the end of this month. In contrast, the Contractor was able to accomplished only 2.40 total for both of the two 2 major work items. As the action plan proposed in the 1 st Show Cause meeting was not successful in offsetting the huge Monthly Progress Report September 2014 Western I ndonesia National Roads I mprovement Project 22 negative slippage a 2 nd Show Cause meeting was held in Jakarta on September 19, 2014. It was agreed that a Test Case of the first 2 weeks shall attain at least minimum of 2.53 shall be executed by the Contractor, starting from September 22, 2014 October 6, 2014. Unless a successful results of the Test Case is attained and realistic workable action plan and catch up schedule is implemented by the Contractor, the work delays will keep on accumulating. A more detailed status of this Package is presented in ANNEX P-I Executive Summary Report. Packages No. 2 : Padang Sawah Sp. Empat Including Air Gadang Bridge During the month, there were signs of positive improvement as the Contractor was able to reduce the slippage from -6.78 the previous month to -5.33 this month. Based on the last four 4 months performance with respect to work progress, the trend shows that the negative slippage is gradually reduced as months passed by. ANNEX P-2 Executive Summary Report present a more detailed status of the Contract Package. Package No. 3 : Manggopoh Padang Sawah Although the current slippage of -9.10 this month, is still manageable at the moment, the delayed works are also leading to a downward trend from -7.26 the previous month. Reason for this delay is the minimal work accomplished on the general and drainage items and asphalt pavement which is still yet to be started. Work activities shall be closely supervised and monitored in order that the delayed works could be reduced or attain an ahead of schedule progress in the coming month. A more detailed status of the project progress are shown in ANNEX P-3 Executive Summary Report . Package No. 4 : Ipuh Bantal The current status of this contract package is similar with that of Package No. 1 wherein the negative slippage of -14.36 incurred last month further slipped down to -16.35 as of end of this reporting month. The actual progress of only 3.73 since the project started nine 9 months ago is of much concern than the slippage. Simply looking at the percentage of work accomplished, it seems that the project is not moving forward. Due to the alarming situation concerning the progress of works a Show Cause meeting to tackle the current problems was held in Bengkulu last September 17, 2014. A Test Case of 30 days period from September 18, 2014 to October 18, 2014 with 8.753 work accomplishment will be executed by the Contractor. Shown in ANNEX P-4 Executive Summary Report are the current problem and actions to be taken to attain substantial progress in order to catch-up with the schedule.